Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
2 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
INSTALLATION OF 01 NO. SUBMERSIBLE PUMP, WATER SUPPLY AND OTHER ASSOSIATED WORKS AT 400 KV SUB STATION BAREILLY
2025_UPCTL_1099760_1
82/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
30 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Superintending Engineer, E.C.T.C. Lucknow
₹6,000
21 Feb 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
INSTALLATION OF 01 No. SUBMERSIBLE PUMP, WATER SUPPLY AND OTHER ASSOSIATED WORKS AT 400 KV SUB STATION BAREILLY
BILL OF QUANTITY
INSTALLATION OF 01 No. SUBMERSIBLE PUMP, WATER SUPPLY AND OTHER ASSOSIATED WORKS AT 400 KV SUB STATION BAREILLY
(Rate as per Current SOR 05/2024 based on Issued DSR- (Group-2)
Providing and fixing 100 mm diameter C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) :(DSR 18.31.1.2) Class II
Total
Conditions:
1.The quantities are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
2.Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used.
3.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
4.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
5.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat & 10% as debris. Fresh brick & brick bat shall be issued to contractor/ firm at prevailing/pertaining SOR.
6.The amount of scrape steel recovered from dismantling shall be issued to contractor/ firm at 1/3rd of rate in prevailing/pertaining SOR.
7. Rates in BOQ Are exclusive of GST. Labour Cess shall be borne by contractor.
8. All civil work shall be execute according to the approved drawing of UPPTCL.
9. All civil work shall be carried out as per UPPTCL/UPPWD specifications.
10. Rates quoted by the contractor shall be Inclusive of all charges/contingencies that may be encountered at the site. Only GST bill be paid extra as applicable.
11. The Contractor will be submit all papers related to the Royalty in office of use materials at site.
12. Drawing if required will be submitted by the contractor for approval by completent authority the cost of which shall be borne by the contractor.
13 .If tendered or quoted rates are below w.r.t. Departmental SOR then additional security / performance guaranty shall be deposited by entered as per GO. No.622/23-12-2012-02-audit-08.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2026046.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .