Tender Value
₹24.3 L
EMD Value
₹48,538
Closing Date
16 Oct 2026, 3:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
O/o the EE, Agt. Divn. No.V, PWD(RandB)
O/o the EE, Agt. Divn. No.V, PWD(RandB)
Patch soling, C.C road, toe wall, drain mtc. and other allied works etc.
2026_CEPWD_77929_1
42/EE-V/AGT/PWD/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
Agartala
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹48,538
9 Oct 2026
9 Oct 2026
16 Oct 2026
9 Oct 2026
16 Oct 2026
9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Flat Brick soling
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. | 334.8 | Sqm | 604.3 | ₹2,02,319.64 |
| 2 | Brick on edge soling
Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. | 10.8 | Sqm | 1,036.45 | ₹11,193.66 |
| 3 | Brick edging laid length wise
Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. | 140 | Mtr | 88.99 | ₹12,458.6 |
| 4 | Maintenance of Earthen shoulder (Stripping of excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. | 180 | Sqm | 19.1 | ₹3,438 |
| 5 | Excavation for Structures
B)With dewatering
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
I) Ordinary Soil
i) Upto 3 m depth | 80.68 | Cum. | 495.6 | ₹39,985.01 |
| 6 | Sand filling
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200
I. Sand filling | 9.81 | Cum. | 1,422.35 | ₹13,953.25 |
| 7 | PCC M-10 in open foundation
Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900,1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).
I) P.C.C grade M 10
(i) Nominal mix 1:3:6 | 13.08 | Cum. | 10,476.98 | ₹1,37,038.9 |
| 8 | PCC M-20 in open foundation
Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings& MoRD technical specifications Clauses 802, 803, 900,1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).
III) P.C.C grade M 20
(i) Nominal mix (1:2:4) | 93.31 | Cum. | 11,314.01 | ₹10,55,710.27 |
| 9 | Brick masonry work
Brick masonry work in cement mortar in foundation completed excluding pointing & plastering as per drawing & MoRD technical specifications Clauses 600, 1202 & 1203.
i) Brick masonry in 1:4 cement mortar | 16.28 | Cum. | 10,071.19 | ₹1,63,958.97 |
| 10 | 12 mm Plastering in substructure
Plastering with cement mortar (1:4) 12 mm thick on brickwork/ C.C. work including a finishing coat of neat cement punning with 2.75 kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204. | 119.35 | Sqm | 242.17 | ₹28,902.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_79323.xls
BOQ • 0.29 MB
DNIT_EE42.pdf
Tender Documents • 2.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .