Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹6.5 L (2.24%)Admitted-Finance | ₹2.9 Cr+₹6.5 L (2.24%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹7.5 L (2.60%)Admitted-Finance | ₹3.0 Cr+₹7.5 L (2.60%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹7.6 L (2.63%)Admitted-Finance | ₹3.0 Cr+₹7.6 L (2.63%) | L4 | Admitted-Finance |
| 5 | L5₹3.0 Cr+₹12.6 L (4.39%)Admitted-Finance | ₹3.0 Cr+₹12.6 L (4.39%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | APT ENGINEERING L17 | shashi engineering co L8 | MONISHA ERECTORS L23 | IMPERIAL CONSTRUCTION L25 | M/S PUJA ENTERPRISES L10 | GJP ENTERPRISE L15 | POWERTECH ENGINEERING CO L18 | jyoti engineering works L14 | P C JOSEPH ENGINEERING AND CONTRACTOR L12 | M/s. SRINIVASA GENERAL ENGINEERING WORKS L4 | M/s K.S ENGINEERING L9 | KRANTI SERVICE AND ENGINEERING WORKS L24 | M/S ASHOK KUMAR ENGINEERING L26 | M/S SHAKTICONSTRUCTION WORKS L20 | S.R.ERECTORS L3 | AKASH ENGINEERING SERVICES L21 | M/s ELINI ENGINEERING WORKS L6 | M/S A B ASSOCIATES L19 | M/S P.N. CONSTRUCTION L5 | M/s M.R.R ENGINEERING WORKS L13 | prabhat engineering works L2 | TECHNOCARE ENGINEERS L1 | S.THIRUPATHI REDDY L16 | KRISHNA ENGINEERING WORKS L22 | M/S LOTUS ENTERPRISES L7 | M.M.K. ENTERPRISE L17 | NOORIE ENGINEERS L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10.00 | Maint.works in BA&ADLs of Stage-II units | 1 | Nos | 18 ₹3,59,41,020.48 | 3.1 ₹3,14,02,705.18 | 26 ₹3,83,77,699.84 | 33.98 ₹4,08,08,287.49 | 4.66 ₹3,18,77,857.66 | 15 ₹3,50,27,265.72 | 21 ₹3,68,54,775.24 | 15 ₹3,50,27,265.72 | 11 ₹3,38,08,926.05 | 5.4 ₹2,88,13,733.37 | 4.6 ₹3,18,59,582.56 | 30 ₹3,95,96,039.51 | 38 ₹4,20,32,718.87 | 21 ₹3,68,54,775.24 | 5.3 ₹2,88,44,191.86 | 22 ₹3,71,59,360.16 | 2.72 ₹2,96,30,020.95 | 20.99 ₹3,68,51,729.39 | 3.67 ₹2,93,40,665.28 | 13 ₹3,44,18,095.89 | 5.65 ₹2,87,37,587.14 | 7.77 ₹2,80,91,867.11 Lowest | 16 ₹3,53,31,850.64 | 25.1 ₹3,81,03,573.41 | 2.5 ₹2,96,97,029.64 | 18 ₹3,59,41,020.48 | 9 ₹3,31,99,756.21 |
| 20.00 | PMJJBY & PMSBY reimbursment | 1 | Nos | 18 ₹27,945.47 | 0 ₹23,682.6 | 26 ₹29,840.08 | 33.98 ₹31,729.95 | 5.1 ₹24,890.41 | 15 ₹27,234.99 | 11.7 ₹26,453.46 | 12 ₹26,524.51 | 11 ₹26,287.69 | 0 ₹23,682.6 | 4.6 ₹24,772 | 30 ₹30,787.38 | 2 ₹24,156.25 | 21 ₹28,655.95 | 5.3 ₹22,427.42 Lowest | 5 ₹24,866.73 | 0.72 ₹23,853.11 | 20.99 ₹28,653.58 | 3 ₹22,972.12 | 13 ₹26,761.34 | 0 ₹23,682.6 | 0 ₹23,682.6 | 16 ₹27,471.82 | 0 ₹23,682.6 | 2.5 ₹23,090.54 | 18 ₹27,945.47 | 0 ₹23,682.6 |
| 30.00 | Safety PPEs Reimbursement | 1 | Nos | 18 ₹7,45,351.72 | 0 ₹6,31,654 | 26 ₹7,95,884.04 | 33.98 ₹8,46,290.03 | 2.11 ₹6,44,981.9 | 15 ₹7,26,402.1 | 11.7 ₹7,05,557.52 | 12 ₹7,07,452.48 | 11 ₹7,01,135.94 | 0 ₹6,31,654 | 4.6 ₹6,60,710.08 | 30 ₹8,21,150.2 | 25 ₹7,89,567.5 | 21 ₹7,64,301.34 | 5.3 ₹5,98,176.34 | 5 ₹6,63,236.7 | 1 ₹6,37,970.54 | 20.99 ₹7,64,238.17 | 3 ₹6,12,704.38 | 13 ₹7,13,769.02 | 5.65 ₹5,95,965.55 Lowest | 5.55 ₹5,96,597.2 | 16 ₹7,32,718.64 | 9.8 ₹6,93,556.09 | 2.5 ₹6,15,862.65 | 18 ₹7,45,351.72 | 0 ₹6,31,654 |
| 40.00 | PM OF STAGE-2 EOT CRANE | 1 | Nos | 18 ₹78,905.64 | 3.1 ₹68,942.13 | 26 ₹84,255.17 | 33.98 ₹89,591.33 | 2.11 ₹68,280.12 | 15 ₹76,899.56 | 11.7 ₹74,692.88 | 12 ₹74,893.49 | 11 ₹74,224.79 | 0 ₹66,869.18 | 4.6 ₹69,945.17 | 30 ₹86,929.94 | 35 ₹90,273.4 | 21 ₹80,911.71 | 5.3 ₹63,325.12 Lowest | 5 ₹70,212.64 | 1 ₹67,537.88 | 20.99 ₹80,905.03 | 3 ₹64,863.11 | 13 ₹75,562.18 | 0 ₹66,869.18 | 0 ₹66,869.18 | 16 ₹77,568.25 | 49.4 ₹99,902.56 | 2.5 ₹65,197.45 | 18 ₹78,905.64 | 0 ₹66,869.18 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
17 Sept 2022, 3:00 pmClosed
Imran Naqvi Sr Manager C and M CPG2
CPG-2 NTPC SIPAT, Sipat Super Thermal Power Proj PO Ujwal Nagar District Bilaspur 495555
Maintenance works in Bottom ash system and Ash disposal pipe lines ofStage II 3 x 500MW at NTPC Ramagundam
2022_NTPC_68580_1
NTPC/USSC-CPG2/9900246237
Limited
Serv - Others
Service
730 days
NTPC RAMAGUNDAM
3 documents required · 3 mandatory
₹0
₹5 L
Yes
19 Sept 2022
5 Sept 2022
19 Sept 2022
5 Sept 2022
17 Sept 2022
5 Sept 2022
5 Sept 2022 - 12 Sept 2022
Amount
Maint.works in BA&ADLs of Stage-II units
PMJJBY & PMSBY reimbursment
Safety PPEs Reimbursement
PM OF STAGE-2 EOT CRANE
prabhat engineering works
S.R.ERECTORS
M/s. SRINIVASA GENERAL ENGINEERING WORKS
M/S P.N. CONSTRUCTION
M/s ELINI ENGINEERING WORKS
M/S LOTUS ENTERPRISES
shashi engineering co
M/s K.S ENGINEERING
M/S PUJA ENTERPRISES
NOORIE ENGINEERS
P C JOSEPH ENGINEERING AND CONTRACTOR
M/s M.R.R ENGINEERING WORKS
jyoti engineering works
GJP ENTERPRISE
S.THIRUPATHI REDDY
APT ENGINEERING
M.M.K. ENTERPRISE
POWERTECH ENGINEERING CO
M/S A B ASSOCIATES
M/S SHAKTICONSTRUCTION WORKS
AKASH ENGINEERING SERVICES
KRISHNA ENGINEERING WORKS
MONISHA ERECTORS
KRANTI SERVICE AND ENGINEERING WORKS
IMPERIAL CONSTRUCTION
M/S ASHOK KUMAR ENGINEERING
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .