| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance KATORATAL STREET KASHIPUR U S NAGAR | DEHRADUN | UTTARAKHAND | 248001 | L1 | Admitted-Finance | |
| 2 | L2₹14.6 L+₹13,425.19 (0.93%)Admitted-Finance WARD NO 04 SUNHARI KICHHA U S NAGAR | CHAMOLI | UTTARAKHAND | 246401 | L2 | Admitted-Finance | |
| 3 | L3₹14.7 L+₹21,956.81 (1.52%)Admitted-Finance WARD NO 4 SUNHERI KICHHA RUDRAPUR | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MANRAJ ELECTRICAL & INFRASTRUCTURE L2 | M/S J K ELECTRICALS L1 | M/s JAY ELECTRCIALS L3 |
|---|---|---|---|---|---|---|
| 1.00Annexure -A ( Works ) | ||||||
| 1.01 | ERECTION OF EARTHING ROD | 46 | NOS | 352 ₹16,192 | 350 ₹16,100 Lowest | 355 ₹16,330 |
| 1.02 | FABRICATION OF STEEL | 2,099 | NOS | 23 ₹48,277 | 21 ₹44,079 Lowest | 22 ₹46,178 |
| 1.03 | ERECTION OF 11 KV STAY SET | 36 | NOS | 418 ₹15,048 | 415 ₹14,940 Lowest | 420 ₹15,120 |
| 1.04 | ERECTION OF LT STAY SET | 16 | NOS | 405 ₹6,480 | 400 ₹6,400 Lowest | 407 ₹6,512 |
| 1.05 | ERECTION OF SINGLE PCC POLE | 92 | NOS | 1,560 ₹1,43,520 | 1,550 ₹1,42,600 Lowest | 1,563 ₹1,43,796 |
| 1.06 | ERECTION OF DOUBLE PCC POLE | 1 | NOS | 6,520 ₹6,520 | 6,498 ₹6,498 Lowest | 6,530 ₹6,530 |
| 1.07 | ERECTION OF SP-55 SINGLE POLE | 9 | NOS | 3,010 ₹27,090 | 2,990 ₹26,910 Lowest | 3,012 ₹27,108 |
| 1.08 | ERECTION OF SP-55 DOUBLE PCC POLE | 12 | NOS | 6,975 ₹83,700 | 6,950 ₹83,400 Lowest | 6,980 ₹83,760 |
| 1.09 | ERECTION OF SP-72 DOUBLE PCC POLE | 1 | NOS | 5,505 ₹5,505 | 5,498 ₹5,498 Lowest | 5,510 ₹5,510 |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
9 Sept 2025, 2:00 pmClosed
EXECUTIVE ENGINEER
ELECTRICITY DISTRIBUTION DIVISION-2 RUDRAPUR
WORK RELATED TO CONSTRUCTIO AND ELECTRIFICATION OF LINE AND SHIFTING OF LINES AND POLES IN THE AREAS RELATED TO 33/11KV SUB STATION DANPUR
2025_UPCL9_86576_1
EDD-2(R) (USN) 05/2025-26
Open Tender
Miscellaneous Works
Item Rate
365 days
RUDRAPUR
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹1,180
EEEDD
₹45,000
30 Sept 2025
26 Aug 2025
10 Sept 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
Amount
Annexure -A ( Works )
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
ERECTION OF 11 KV STAY SET
ERECTION OF LT STAY SET
ERECTION OF SINGLE PCC POLE
ERECTION OF DOUBLE PCC POLE
ERECTION OF SP-55 SINGLE POLE
ERECTION OF SP-55 DOUBLE PCC POLE
ERECTION OF SP-72 DOUBLE PCC POLE
ERECTION OF SP-33 SINGLE PCC POLE
ERECTION OF BRACKET IN 11 KV LINE
INST. OF 100 KVA DTR ON POLE STRUCTURE
INST. OF 250 KVA DTR ON POLE STRUCTURE
CONST INST OF DANGER BOARD/NUMBER PLATE
CARTAGE OF PCC POLE , 21-50 KM
CARTAGE OF PETTY MATERIAL,21-50 KM
CARTAGE OF PETTY MATERIAL,0-20 KM
CARTAGE OF 100 KVA DTR, 21-50 KM
CARTAGE OF PCC POLE , 0-20 KM
CARTAGE OF SP-33 POLE , 0-20 KM
CARTAGE OF SP-55 POLE , 0-20 KM
CARTAGE OF SP-55 POLE , 21-50 KM
CARTAGE OF SP-72 POLE , 21-50 KM
CARTAGE OF 11 KV XLPE CABLE, 0-20 KM
CHEMICAL EARTHING
CARTAGE OF 250 KVA DTR, 0-20 KM
DISMANTLING OF 250 KVA DTR
DISMANTLING OF PCC SINGLE POLE
DISMANTLING OF AB CABLE
DISMANTLING OF 11 KV LINE(DOG)
DISMANTLING OF SP-55 SINGLE POLE
DISMANTLING OF PCC DOUBLE POLE
DISMANTLING OF 11 KV LINE(WEASEL)
LAYING OF U/G 11 KV CABLE (TRNCHLESS)
LAYING OF 3P 5W LT LINE (WEASEL)
LAYING OF BARBED WIRE
LAYING OF AB CABLE OF SIZE 120 SQMM
LAYING OF OFC CABLE UNDERGROUND
LAYING & FIXING LT XLPE CABLE
LAYING OF LT XLPE ABC 3X120+1X95+1X16 sq
LAYING OF 3P 4W LT LINE (WEASEL)
LAYING OF 11 KV CABLE POLE TO POLE
LAYING OF WEASEL CONDUCTOR IN HT LINE
MANUAL SHIFTING OF 11 KV VCB I/C
FIXING OF 11 KV XLPE JOINTING KIT
HEALOAD CARTAGE SP-55 POLE (0-1 KM)
HEALOAD CARTAGE SP-72 POLE (0-1 KM)
HEALOAD CARTAGE OF MATERIAL (0-1 KM)
HEALOAD CARTAGE OF PCC POLE (0-1 KM)
HEALOAD CARTAGE OF 100 KVA DTR (0-1 KM)
PAINTING OF DOUBLE POLE Str. SP-55/72
PAINTING OF SP-55 POLE
RESAGGING OF LT AB CABLE
EXCAVATION FOR PIT FOR POLE
EXCAVATION FOR PIT FOR STAY SET
MUFFING OF POLE
MANUAL SHIFTING OG 11 KV VCB(O/G-B/C-I/C) PANEL
ERRECT 11 KV VCB(O/G-B/C-I/C) PANEL
GROUTING OF POLE
GROUTING OF STAY SET
BACK CARRIAGE OF SCRAP MATERIAL
Annexure - B ( Supply )
Nut & Bolt
LT CLAMPS FOR PCC POLE WITH N&B
LT CLAMPS WITH N&B ST POLE SP-33
HOLDING CLAMPS FOR SP-55 WITH N&B
G.I. PIPE 6 INCH
G.I. PIPE 6 METER LONG
GI STRIP 50X6 MM
DANGER BOARD
BARBED WIRE
ACE CHEMROD DIA60MM LENGTH 3000 MM
LT SHACKLE INSULATER 75X65MM
LT SHACKLE INSULATER 65X65MM
LT SHACKLE INSULATER 75X90MM
STAY CLAMP WITH N&B
SUSPENSION CLAMP EYE HOOK LT ABC CABLE
DEAD END CLAMP WITH I HOOK
J-HOOK
F-CLAMP
STAY CLAMP FOR SP-55 POLE
STAY CLAMP FOR PCC POLE
STAY CLAMP WITH N&B FOR PCC POLE 8.5 MTR
11 KV POLYMER PIN INSULATOR
11 KV CABLE TIES FOR PIN INSULATOR
AL. CRIMPING TYPE LUGS 120 SQ.MM.
AL. CRIMPING TYPE LUGS 400 SQ.MM.
AL. CRIMPING TYPE LUGS 630 SQ.MM.
BOLTS & NUTS OFF SIZE
M.S. BOLTS & NUTS OFF SIZE
M.S. BOLTS & NUTS 16X50 MM
M.S. HOLDING CLAMPS
M.S. CLAMP WITH N&B FOR SUSPENDION CLAMP
M.S. CLAMP WITH N&B FOR PCC DEAD END CLAMP
NUMBER PLATE WITH CLAMP
X-ARM CLAMP FOR PCC POLE WITH N/B
X-ARM CLAMP FOR ST POLE SP-55 WITH N/B
X-ARM HOLDING CLAMP
STAY CLAMP FOR SP-55 WITH NUT & BOLT
EARTH CLAMPS OFF SIZE
DOUBLE POLE CLAMPS FOR SP-55 POLE WITH N&B
DOUBLE POLE CLAMPS FOR PCC POLE WITH N&B
MANRAJ ELECTRICAL & INFRASTRUCTURE (BID ID -396342)
M/s JAY ELECTRCIALS (BID ID -396354)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .