Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.2 L
EMD Value
₹13,200
Closing Date
7 Sept 2020, 4:00 pmClosed
Executive Engineer PWD(RnB)Division 2ndKargil
Executive Engineer PWD(RnB)Division 2ndKargil
Construction of Link Road Khudam Bagh Poyen to By-Pass Shilikchey Rd.0-120 Mtr
2020_PWD_650_20
E-Tender 16 of RnB Div Kargil 2020-21
Open Tender
Civil Works - Roads
Item Rate
20 days
kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹130
Executive Engineer PWD(RnB)Division 2ndKargil
₹13,200
8 Sept 2020
29 Aug 2020
8 Sept 2020
29 Aug 2020
7 Sept 2020
29 Aug 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavated ) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m
All kinds of soil @100%
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level including curing by excluding form work costs.complete job
centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster,buttresses plinth and string coarse ect
Dumping stone filling in horizontal on level incld. Cost of stone.
Filling available excavated earth ( excld. Rock) in trench ,plinth ,sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead up to 50mtr and lift up to 1.50mtr.
Carriage of stone for an avg lead of 15 Km By MT Incld. Loading, un-loading complete.
Carriage o sand/stone Agg.for an avg lead of 15Km By MT Incld. Loading, un-loading complete.
M/S NEW ERA CONSTRUCTION GROUP POYEN KARGIL
M/S KARGIL GROUP OF ENGINEERS
m/s beegroup
shitapa construction company
M/S BALTI GROUP OF CONSTRUCTION
stage.html
html • 0.03 MB
finance_1359.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .