| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-AOC 738 15 STREET NO 3 ADARSH NAGAR BYPASS ROAD BULANDSHAHAR | BULANDSHAHR | UTTAR PRADESH | 202389 | ₹6.4 L | 1 | Accepted-AOC accept |
| 2 | 2₹6.7 LRejected-Finance | ₹6.7 L | 2 | Rejected-Finance 2 |
| 3 | 3₹7.5 LRejected-Finance ALIGARH | UTTAR PRADESH | 202001 | ₹7.5 L | 3 | Rejected-Finance 3 |
| 4 | 4₹7.6 LRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.6 L | 4 | Rejected-Finance 4 |
| 5 | 5₹7.7 LRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.7 L | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L5 | DEVENDRA KUMAR SHARMA L3 | SHIV GANGA INFRATECH L1 | SIYA INFRATECH L2 | GOMATINETRA CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in embankment by power transported earth with a lead beyond 200m and upto 1.00 km. i/c excavation , loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.all specified and as directed by Engineer in charge. | 108 | Cum | 105 ₹11,340 | 100 ₹10,800 | 90 ₹9,720 | 75 ₹8,100 | 100 ₹10,800 |
| 2.00 | Removal of Bund and diversion after complition of Work all specified and as directed by Engineer in charge. | 28 | Cum | 55 ₹1,540 | 10 ₹280 | 65 ₹1,820 | 100 ₹2,800 | 50 ₹1,400 |
| 3.00 | Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including back filling with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches all specified and as directed by Engineer in charge. | 48 | Cum | 100 ₹4,800 | 50 ₹2,400 | 80 ₹3,840 | 50 ₹2,400 | 100 ₹4,800 |
| 4.00 | Cement Concrete 1:3:6 (Cement, coarse sand and stone grit 20-40mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction all specified and as directed by Engineer in charge. | 12 | Cum | 6,200 ₹74,400 | 5,500 ₹66,000 | 5,200 ₹62,400 | 5,000 ₹60,000 | 6,100 ₹73,200 |
| 5.00 | Reinforced Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete but excluding cost of steel and its binding with mechanical mixing and compaction all specified and as directed by Engineer in charge. | 44 | Cum | 6,550 ₹2,88,200 | 7,500 ₹3,30,000 | 5,800 ₹2,55,200 | 6,500 ₹2,86,000 | 6,500 ₹2,86,000 |
| 6.00 | Cement Concrete 1:2:4 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction. all specified and as directed by Engineer in charge. | 5.6 | Cum | 6,850 ₹38,360 | 6,000 ₹33,600 | 6,400 ₹35,840 | 6,000 ₹33,600 | 6,800 ₹38,080 |
| 7.00 | Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing all specified and as directed by Engineer in charge. | 1 | Cum | 6,550 ₹6,550 | 7,000 ₹7,000 | 6,800 ₹6,800 | 6,700 ₹6,700 | 6,500 ₹6,500 |
| 8.00 | Providing and placing steel shuttering for C.C. Work including cost of centering and shuttering upto 3.0m hightall specified and as directed by Engineer in charge. | 45 | Sqm. | 500 ₹22,500 | 400 ₹18,000 | 550 ₹24,750 | 400 ₹18,000 | 500 ₹22,500 |
| 9.00 | Providing and placing steel shuttering for R.C.C. Work including cost of centering and shuttering upto 3.0m hight. all specified and as directed by Engineer in charge. | 127 | Sqm. | 500 ₹63,500 | 600 ₹76,200 | 400 ₹50,800 | 450 ₹57,150 | 500 ₹63,500 |
| 10.00 | Providing and laying Reinforcement for R.C.C. Work i/c cutting, binding and placing in position i/c cost of all material such as steel, binding wire etc., labour T&P etc. complete as per drawing all specified and as directed by Engineer in charge. | 2.75 | MT. | 81,000 ₹2,22,750 | 70,000 ₹1,92,500 | 68,000 ₹1,87,000 | 68,000 ₹1,87,000 | 80,000 ₹2,20,000 |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
23 Dec 2025, 9:00 amClosed
EXECUTIVE ENGINEER
U.M.B.D.G.C. KHURJA
CONSTRUCTION OF V.R.B.
2025_UPIDC_1094344_12
12/EE/2025-26
Open Tender
Civil Works
60 days
U.M.B.D.G.C. KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹17,000
16 Feb 2026
18 Dec 2025
23 Dec 2025
18 Dec 2025
23 Dec 2025
18 Dec 2025
Amount
Earth work in embankment by power transported earth with a lead beyond 200m and upto 1.00 km. i/c excavation , loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.all specified and as directed by Engineer in charge.
Removal of Bund and diversion after complition of Work all specified and as directed by Engineer in charge.
Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including back filling with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches all specified and as directed by Engineer in charge.
Cement Concrete 1:3:6 (Cement, coarse sand and stone grit 20-40mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction all specified and as directed by Engineer in charge.
Reinforced Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete but excluding cost of steel and its binding with mechanical mixing and compaction all specified and as directed by Engineer in charge.
Cement Concrete 1:2:4 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction. all specified and as directed by Engineer in charge.
Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing all specified and as directed by Engineer in charge.
Providing and placing steel shuttering for C.C. Work including cost of centering and shuttering upto 3.0m hightall specified and as directed by Engineer in charge.
Providing and placing steel shuttering for R.C.C. Work including cost of centering and shuttering upto 3.0m hight. all specified and as directed by Engineer in charge.
Providing and laying Reinforcement for R.C.C. Work i/c cutting, binding and placing in position i/c cost of all material such as steel, binding wire etc., labour T&P etc. complete as per drawing all specified and as directed by Engineer in charge.
Supply and fixing joint filler board in joint between expansion Joints.all specified and as directed by Engineer in charge.
Supplying and fixing 75mm dia PVC Pipe (Kisan/Supreme) i/c cost of all material, labour, and T&P etc. complete. all specified and as directed by Engineer in charge.
Supply and fixing Sign Board and writing on it i/c cost of all material, labour T&P etc. complete. all specified and as directed by Engineer in charge.
Finishing wall two or more coat with Acrylic smooth exterior paint (Apex) of required shade i/c priming coat of exterior primer. all specified and as directed by Engineer in charge.
SIYA INFRATECH (BID ID -5764114)
DEVENDRA KUMAR SHARMA (BID ID -5764411)
GOMATINETRA CONSTRUCTIONS (BID ID -5764056)
BHAMAR SINGH (BID ID -5764079)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
RETENDER03.pdf
Additional Documents • 0.25 MB
BOQ_2026237.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid