EXECUTIVE ENGINEER, PANCHAYAT (R&B) DIVISION, NARMADA
Resurfacing and Strengthening of Various Roads of Dediapada under Package No-02 (Total-02 Road 3.00 KM Length) District-Narmada
334350
15 of 2026-27
Open
Civil Works - Roads
Works
Narmada
5 documents required · 5 mandatory
₹3,600
EXECUTIVE ENGINEER PANCHAYAT (R and B) DIVISION, NARMADA
₹1.2 L
12 Aug 2026
12 Aug 2026
12 Aug 2026
31 Aug 2026
12 Aug 2026
Name of Work: Resurfacing and Strengthening of Various Roads of Dediapada under
Package No:-02 (Total-02 Road) District: Narmada
BILL OF QUANTITIES
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
[1] 1.50 Clearing and Grubbing road land including uprooting rank 28455.09 Hec
vegetation, grass brushes, shrubs, spalling and trees girth up in
300 mm removal of stumps of trees cut earlier &disposal of
unservicable material and stacking of serviceable material,
Clause-2 C1.1 (area of light Density) By mechanical means in
area of light jungle.
[2] 7500.00 Scarifying gravelled macadam or bitumen macadam surface 6 42.59 Sqm
cm to 10 cm.depth including stacking useful materials on road
side and disposing off remaining stuff.
[3] 787.60 Providing and laying compacted WBM of Grading-II MCBT 1287.48 Cum
metal of size 45 to 63mm in required layers including using
16% stone screening, 13.2mm size and 8% stone dust as filler
including spreading watering & consolidation by vibratory
roller etc. comp.
[4] 600.00 Providing and laying Compacted of Hard Murrum in side 884.34 Cum
shoulder / Raise Up inclu. carraige of material and spreading
on prepared base including compacting as per MOST
Specification etc... complete.
[5] 945.90 Earthwork in cutting including preparing the slope and camber 137.33 Cum
andstacking or utilising the cutting stuff in bank as directed
upto 200 Meters from the end of cutting with all lead and lift.
[6] 756.80 Rolling of earthwork in layers with power roller including 23.18 Cum
filling in depressions which occur during the process.
[7] 3490.00 Earthwork for embankment including breaking clods, dressing 182.14 Cum
with all lead and lift and including watering rolling and
consolidation of subgrade in layers at O.M.C. to required dry
density including filling the depression which occur during the
process using power roller 8T to 10T.(E) From Borrow area
within 3.0KM. lead
[8] 907.00 Providing and laying bituminius spray grout base course in 3035.04 MT
37.50 mm thick with bitumen of grade ( VG- 30 ) at the rate of
1.99 % by weight of mix for mixing & Emuldion 2.50 Kg/10
Sqm for tack coat and using B.T chips of required gradation
including cleaning and heating asphalt premix materials by hot
mix process in proper gradation and laying with paver finisher
and consolidation by power roller of 8 to 10 tonne including
cost of all materials . Asphalt aggregates, labour charges royalty
charges etc complete as directed.
[9] 580.00 Providing laying & rolling 25m m thick open graded premixed 4057.10 MT
bitumineous carpet with B.T. aggregate as specified and using
bitumen grade (VG-30) for tack coat at the rate of 2.50 kg./10
Sq.M. and using bitumen for mixing with agreegate at the rate
of 3.36 % i.e 33.60 kg/M.T. of total mix including heating
&mixing in drum mix plant &spreading the same with paver
finisher and consolidation with power roller inclu.necessary
fire wood, oil, lubricants, labour charges etcusing contractor's
own drum mix plant and equipment, tool etc. compl. in
accordance with the require-ment of specification.
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
[10] 299.00 Providing and laying sealcoat with B.T. agreegate as specified 4530.44 MT
using agreegate at the rate of 0.18 Cu.mt / 10 Sq.M. and
bitumen grade (VG 30) for mixing with agreegate at the rate of
4.50 % i.e 45 Kg/M.T. of total weight of mix .Hot mix laying
process is including heating the asphalt aggregate continous
batching, transporting the mix and spreading the same by
paver roller including necessary firewood, oil, lubricants,
labour charges higher charges of machinery etc.complete. Mix
zycotherm in hot asphalt binder in bitumen storage tank as per
guideline of the manufacturer.
[11] 5.00 Providing and fixing ordinary kilometer stone of approved hard 853.31 Nos
stone as per I.R.C type desing in C.C.1 4 8 including painting
lettering etc, complete (For VR.)
[12] 15.00 Providing and fixing hectometer as per I.R.C type design 116.08 Nos
including painting, lettering etc. complete. (I) Fixing in earth
[13] 30.00 Providing and fixing guard stone as per I.R.C type design 106.71 Nos
including white washing etc. complete. (I) Fixing in earth
[14] 4.00 Providing and fixing Junction board of M.S. plates and angles as 5236.70 Nos
per standard I.R.C. design including fixing in C.C. 1:4:8 with
necessary excavation painting figuring and lettering on board
etc. complete as per detailed drawing
[15] 15.00 Supplying and fixing road sign board of M.S. plates and angle 3072.99 No
iron including painting, lettering etc. complete including fixing
in C.C. 1:4:8 with necessary excavation etc. complete as per
I.R.C. type design.(ii) Reflective type
[16] 751.00 Road marking with hot applied thermoplastic paints with 367.72 Sqm
reflectorising glass beads on bitumin surface providing and
laying a hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250gms per sqm area,
thickness of 2.5mm is excluding of surface applied glass beds as
per IRC:35-2015. The finished surface to be level, uniform and
free from streaks and holes. zebra patta /bump patta
lane/center line/ edge line/cut patta. The white color marking
should provide liminance coefficinet on cemend road shalll be
min 130 mcd/m2/lux and Asphalt road shall be min
mcd/m2/lux during the service life during the day time. The
marking should meet the performance criteria for night time
reflectivity, wet reflectivity and skid resistance as mentioned in
the section-15 of IRC 35-2015. Warranty for the Retro
reflectivity should be two years.
[17] 622.00 Cat Eye / Road Stud / RPM: Supplying Raised Pavement 217.40 Nos
Markers made of polycarbonate and ABS moulded body and
reflective panels with Micro prismatic lens (No Glass bead lens)
capable of providing total internal reflection of the light
entering the lens face and shall support a load of 13635 kgs.
tested in accordance to ASTM D 4280 Type H and complying to
Specifications of Category A of MORTH Circular No
RW/NH/33023/10-97 Ð DO III Dt 11.06. 1997. The height,
width and length shall not exceed 20 mm, 130 mm and 130 mm
and with minimum reflective area of 13 Sqcm on each side and
the slope to the base shall be 35 +/- 5 degree. The body of the
marker should having finger grip for easy and accurate
placement and application with epoxy / bituminous Adhesive
as recommended by the manufacturer of the marker. The color
of the marker should be as per the IRC 35-2015 and as directed
by Engineer-in-charge.
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
[18] 4.00 Village name/ Bump Ahed sign :-Providing and fixing sing 5045.36 Nos
boards made out of 2mm aluminium sheet; size 90 x 60cms.
rectangle as as per the design of IRC-67-1977 pre treated with
phospheting process & acid etching; coated with one coat of
epoxy primer and two coats of best quality epoxy paint;
reflectorised with retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per IRC-30-
1968, 3.1m long (2 nos) stand post and frame fabricated from
suitable size iron angle of 50 x 50 x 5mm painted with best
quality epoxy coatings in black and white bends. the details of
symbol or inscription / numerals for each board shall be as per
the instruction of engineer in charge. The fixing at site shall be
in 1:2:4 CC block of size 45 x 45 x 60cms. for each leg. including
excavation curing etc. complete under the supervision of
engineer in charge.(A) Engineer Grade(VR)...
[19] 5.00 Cautionary Warning Sign :-Providing and fixing sing boards 3808.66 Nos
made out of 2mm aluminium sheet; size 90 x 90 x 90 cms.
equilateral triangle as per design of IRC-67-1977. Pre treated
with phospheting process & acid etching; coated with one coat
of epoxy primer and two coats of best quality epoxy paint
;reflectorised with retro refiectivesheeting as per latest
M.O.S.T.Specifications; 3.1m long stand postand frame
fabricated from suitable sizeiron angle of 35 x 35 x 3mm, 75 x
75 x 6mm as required; painted with bestquality epoxy coatings
in black andwhite bends. The details of symbol foreach board
shall be as per theinstruction of engineer in charge. The fixing
at site shall be in 1:2:4 CC block of size 45 x 45 x 60 Cms. for
each leg.including excavation,curing etc.complete under the
supervision of engineer in charge.(A) Engineer Grade(VR)
[20] 5.00 Regulatory/Mandatory signs :Providing and fixing sing boards 3439.81 Nos
made out of 2mm aluminium sheet; size 60cms. diameter circle
as per the design of IRC-67-1977 pre treated with phospheting
process & acid eteching; coated with one coat of epoxy primer
and two coats of best quality epoxy paint; reflectorised with
retro refiective sheeting as per latest M.O.S.T. Specifications;
3.1m long stand post and frame fabricated from suitable size
iron angle of 35 x 35 x 3mm 75x75x6mm as required; painted
with best quality epoxy coatings in black and white bends. the
details of symbol for each board shall be as per the instruction
of engineer in charge. The fixing at site shall be in 1:2:4 CC
block of size 45 x 45 x 60cms. for each leg. including excavation
curing etc. complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
[21] 5.00 STOP SIGN:-Providing and fixing sing boards made out of 2mm 4676.06 Nos
aluminium sheet; size 90 x 90cms. rectangle as per the design
of IRC-67-1977 pre treated with phospheting process & acid
teching; coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m long stand
post and frame fabricated from suitable size iron angle of 35 x
35 x 3mm 75x75x6mm as required; painted with best quality
epoxy coatings in black and white bends. the details of symbol
for each board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of size 45 x
45 x 60cms. for each leg. including excavation curing tec.
complete under the supervision of engineer in charge.(A)
Engineer Grade(VR)...
[22] 2.00 "LOGO" Board : Supplying & Fixing logo board of MMGSY 4200.59 Nos
Diamond size (600 mm x 600 mm) 16 gauge & board plate size
(900 mm x 250 mm) 16 gauge thick M.S Plate and 2.40 Mt Deep
length single angle 75 x 75 x 6 mm size including fitting and
painting lettering with luminous color as per drawing.
[23] 2.00 Citizen' s information Board- Providing and fixing of typical 23519.87 Nos
MMGSY information board as per instruction. Two MS plates of
1.6 mm thick, of 900 mm x 750mm size fixed at top & bottom
duly welded with MS angles of 25 x 25 x 5 mm thick M.S plate
shall be welded by two vertical M.S flats & four horizontal M.S
flates 5 mm thick to 75 mm x 75 mm of 12 SWG square tubes
posts duly embedded in cement concrete M-15 grade blocks of
600mm x 600mm x 75mm, below ground level. Painting New
letters & figure of any shade with ready mixed synthetic
enample paint of superior quality in required shade and colour,
All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paints as per drawing Clause
1701 and Annexure 1700.1 (10.16)
[24] 200.00 Type - A, "W" : Metal Beam Crash Barrier (Providing and 3299.67 Nos
erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above
road/ground level, fixed on ISMC series channel vertical post,
150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m
below ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to IS:1367
and IS:1364, metal beam rail to be fixed on the vertical post
with a spacer of channel section 150 x 75 x 5 mm, 330 mm long
complete as per clause 811)
[25] 225.00 Demolition including stacking of serviceable materilas and 1108.12 Cum
disposal of unserviceable materials with all lead and lift. (i)
[26] 95.00 Providing and filling in foundation with ordinary Cement 3211.27 Cum
concrete M-100 mix and providing necessary vertical pin
headers including formwork, vibrating, ramming and curing
complete.(More than 10 ton)
[27] 150.00 Providing and laying contolled cement concret M-200 by trimix 5404.86 Cum
method and curing complete including compacting with surface
mechanical vibrator, mechanical floater, chanelling formwork,
grooving including expantion joint and construction joint
including filling asphalt filler joint as per instruction of
Engineer in charge
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
[28] 3380.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work 77.29 Kg
including bending, binding and placing in position complete
upto floor two level
[29] 55.00 Excavation for foundation upto 1.5 m depth including sorting 259.93 Cum
out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(B) Dense or Hard soil
[30] 38.00 Providing and casting in situ ordinary cement concrete M- 3787.50 Cum
150 mix and providing necessary pin headers including
shuttering, scaffolding, laying, vibrating, curing and finishing
complete without V-Groves.(A) Height from 0.0 M. to
M.(More Than 10 Ton)
[31] 15.00 Supplying and fixing reinforced concrete heavy duty non- 4710.56 Rmt
pressure pipes with collars for culverts including setting and
joining the pipes in C.M. 1:2 watering and laying (To level of
slops of I.S. 458 / 1971 Class NP4 of following internal
diameter. (iv) 900 mm dia.
[32] 51.00 White washing with lime on wall surface (two coats) to give an 12.70 Sqmt
even shade including thoroughly booming the surface to
remove all dirt, dust; mortar drops and other foreign matter.
[33] 1.00 Proivding temporay all weather and Fair weather diversion 2020.00 Lump
suitable for traffer is during the construction period of the
Bridge including providing necessary drains and all safety
measures including red / signals at night for traffic etc.
One Crore Twenty Two Lacs Ninety One Thousand Fifty Four Rupees and Three Paisa
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures and words) of the estimated rate
mentioned above. Amount of my /our tender works out as under.
Quantities Estimated Rates
Item estimated but Total Amount According
Item estimated but Total Amount According
Item of work Unit
No. may be more to Estimated Quantities
or less In Figure
Estimated Amount put to tender Estimated Amount put to tender
In Words In Words
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017
as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
5. Credit of materials of Diversion & CD Work amount of Rs. …........................ must be recovered from Contractor's ............ R.A Bill.
Dated Signature Deputy Executive Engineer Executive Engineer
the Contractor. R & B (P) Sub Division R & B (P) Division
Dediapada Narmada
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Package No 2.pdf
2.SCH-B.pdf
3.Specification Index.pdf
4.Asphalt Consupmption.pdf
5.Emulsion Consumption.pdf
6.Cement Consumption.pdf
7.Steel Consumption.pdf
8.Testing Schedule.pdf
9.Checklist Package No 2.pdf
10. Specification Road Package 2.pdf
11.All GR and Special Condition_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].