| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC V P O KATAULA TEHSIL SADAR DISTT MANDI 175005 | MANDI | MANDI | HIMACHAL PRADESH | 175005 | ₹2.4 L | L1 | Accepted-AOC Quoted rates are lowest |
| 2 | L2₹3.2 LRejected-Finance H NO 92 5 VPO CHATROKHARI TEH SUNDERNAGAR DISTT MANDI HP 175018 | MANDI | HIMACHAL PRADESH | 175018 | ₹3.2 L | L2 | Rejected-Finance Quoted rates are higher |
| 3 | L3₹3.5 LRejected-Finance SURANGANI CHAMBA HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176317 | ₹3.5 L | L3 | Rejected-Finance Quoted rates are higher |
| Sl No | Description | Qty | Unit | Mahender Kumar Contractor L1 | Gunjan Chauhan L2 | Ravinder Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00 | Removal and refixing of floor mounted chair with the required nut/ screw as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 25 | Each | 89 ₹2,225 | 293 ₹7,325 | 500 ₹12,500 |
| 2.00 | Providing & fixing in position of the wall paneling of well-seasoned Pinewood 12 mm thick fixing on horizontal wooden grid frame of 50 x 20 mm back strips to hold pine wood panel at a center to center 450 mm. Including the wooden bottom skirting of size 60x19mm a. The pine wooden should be fully machine seasoned and well dried. B. Back frame of wooden strips / plywood strip should be made at a spacing of 450 mm c/c or on site required conditions. c. After fixing of pine wood strips cleaning should be done with sand paper on multiple time upto the required smoothness not achieved. d. for smooth finish wooden fillers/putty should be provided at required locations multiples time as per the direction of engineer in charges. e. after smooth finish multiple layers of wood polish of approved brands should be applied in multiples coats including the top gloss. f. in bottom of the paneling wooden skirting should be provided as mentioned above if required a strip of beading may be provide in top of the paneling depend upon the requirements and direction of the engineer in charge. (cost should be included complete in all respect) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 90 | sqm | 2,187 ₹2.0 L | 2,300 ₹2.1 L | 3,100 ₹2.8 L |
| 3.00 | Providing & fixing in position AC3 High gloss/ non gloss ( as on site selection) Grade Wooden Flooring & Skirting of Greenply, Armstrong, Action Tesa, brands with planks of thickness 12 mm thick as per manufacturer specification, is approved color, texture, and finish, The flooring shall be fixed with tongue and groove interlocking system, with an underlayment of 4 mm thick expanded polyethylene foam sheets having a density 40kg/cum, over prepared surface with necessary door reducer wherever required. The shade of the flooring should be approved by the contractor before commencement of the work. The work should be completed as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 33 | sqm | 1,389 ₹45,837 | 3,300 ₹1.1 L | 1,700 ₹56,100 |
Tender Value
₹3.6 L
EMD Value
₹7,119
Closing Date
18 Nov 2025, 6:00 pmClosed
Superintending Engineer IIT Mandi Kamand
O/o Superintending Engineer, North Campus of IITM
Providing and fixing of wooden flooring and wall paneling at classroom of CCE, IIT Mandi North Campus
2025_IITMD_883090_1
IIT Mandi (CW)/SE-1865/2025-26/2195-97 dated 28-10-2025
Open Tender
Civil Works
40 days
North Campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹7,119
23 Mar 2026
28 Oct 2025
20 Nov 2025
28 Oct 2025
18 Nov 2025
28 Oct 2025
28 Oct 2025 - 18 Nov 2025
Amount
Removal and refixing of floor mounted chair with the required nut/ screw as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Providing & fixing in position of the wall paneling of well-seasoned Pinewood 12 mm thick fixing on horizontal wooden grid frame of 50 x 20 mm back strips to hold pine wood panel at a center to center 450 mm. Including the wooden bottom skirting of size 60x19mm a. The pine wooden should be fully machine seasoned and well dried. B. Back frame of wooden strips / plywood strip should be made at a spacing of 450 mm c/c or on site required conditions. c. After fixing of pine wood strips cleaning should be done with sand paper on multiple time upto the required smoothness not achieved. d. for smooth finish wooden fillers/putty should be provided at required locations multiples time as per the direction of engineer in charges. e. after smooth finish multiple layers of wood polish of approved brands should be applied in multiples coats including the top gloss. f. in bottom of the paneling wooden skirting should be provided as mentioned above if required a strip of beading may be provide in top of the paneling depend upon the requirements and direction of the engineer in charge. (cost should be included complete in all respect) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts.
Gunjan Chauhan (BID ID -3319014)
Ravinder Kumar (BID ID -3319206)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_928172.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid