| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | ₹3.2 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹3.9 Cr+₹64.0 L (19.8%)Rejected-Finance | ₹3.9 Cr+₹64.0 L (19.8%) | L2 | Rejected-Finance High rate quoted |
| 3 | L3₹4.2 Cr+₹96.0 L (29.7%)Rejected-Finance | ₹4.2 Cr+₹96.0 L (29.7%) | L3 | Rejected-Finance High rate quoted |
| 4 | L4₹4.4 Cr+₹1.1 Cr (35.4%)Rejected-Finance P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹4.4 Cr+₹1.1 Cr (35.4%) | L4 | Rejected-Finance High rate quoted |
| 5 | L5₹8.3 Cr+₹5.1 Cr (156.6%)Rejected-Finance | ₹8.3 Cr+₹5.1 Cr (156.6%) | L5 | Rejected-Finance High rate quoted |
Tender Value
Refer Docs
Closing Date
23 Oct 2021, 10:00 amClosed
Chief Engineer Project Pushpak
BET 139.915 AND KM 169.330 KDA RD
PDG AND LYG OF READY MIX BC 30 MM TH AND APPLYING TACK COAT INCL CORRECTION WK FOR RESURF WK BET KM 139.915 AND KM 169.330 (NET CL-9 13.14 KM) ON KDA RD UNDER 74 RCC PROJECT PUSHPAK IN MIZORAM STATE
2021_BRO_478155_1
CE (P) PSK-15 OF 2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
BET 139.915 AND KM 169.330 KDA RD
As per tender Documents
8 documents required · 8 mandatory
₹0
Exempted
BET 139.915 AND KM 169.330 KDA RD
7 Dec 2021
27 Sept 2021
25 Oct 2021
27 Sept 2021
23 Oct 2021
1 Oct 2021
28 Sept 2021 - 30 Sept 2021
29 Sept 2021
Amount
RESURFACING WORK ON KAWNPUI- DUNTLANG- AIZAWL ROAD (KM 139.915 TO KM 140.030, KM 141.158 TO KM 141.595, KM 141.824 TO KM 142.758, KM 159.300 TO KM 169.330)
Providing and laying of Bituminous Concrete (BC) 30 mm thick consolidated with bitumen VG-10/VG-30 as per clause 507 of MoRT&H (Ministry of Road Transports and Highways)(fifth revision) specification for road & bridge works, including tack coat as per clause 503 of MoRT&H (fifth revision) on the already existing BT surface, correction work with WBM 75 mm thick consolidated as per Clause 404 of MoRT&H (Fifth revision) and Prime coat over WBM correction surface as per Clause 502 of MoRT&H (Fifth revision) duly maintaining the road profile and laying the ready mix for Bituminous Concrete 30 mm with paver finisher and rolled as per clause 501.6 and 501.7 of Mort&H (fifth revision) to achieve desired compaction (including cost of conveyance of mix). Note : 1. The specification given at Clause 3004.2 of MoRT&H (Fifth revision) specifications will be complied while carried out correction work i.e Preparation of area for potholes and patch repair, filling/spreading with WBM materials and application of bitumen emulsion (prime coat) 2. The maximum area of correction work with WBM 75 mm thick consolidated will be 10% of BC area
M/s Sadguru Engineers & Allied Services Pvt Ltd
Nidhi Creative Infrastructure Private Limited
SLT INFRACON PVT LTD
BHANWAR LAL
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .