| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.8 LAdmitted-Finance 15 3 625017 | MADURAI | TAMIL NADU | 625017 | -12.12% | ₹68.8 L | L1 | Admitted-Finance |
| 2 | L2₹75.1 L+₹6.4 L (9.27%)Admitted-Finance | -3.97% | ₹75.1 L+₹6.4 L (9.27%) | L2 | Admitted-Finance |
| 3 | L3₹77.1 L+₹8.3 L (12.1%)Admitted-Finance | -1.50% | ₹77.1 L+₹8.3 L (12.1%) | L3 | Admitted-Finance |
Tender Value
₹78.2 L
EMD Value
₹1.9 L
Closing Date
4 May 2026, 5:00 pmClosed
GM(CIVIL)
MAIN ADMIN BUILDING SECTOR 6 NOIDA
Construction of Balance Service Road of 75 M Wide Road in between Sector-150 and 149 Noida
2026_NOIDA_1143095_1
65/DGM/SM/WC10/ET/23-24
Open Tender
Civil Works
Fixed-rate
120 days
NOIDA
REFER TO TENDER DOCUMENT
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.9 L
9 Jun 2026
28 Apr 2026
5 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Embankment in Ordinary soil Embankment to be in 20cm layers including ramming Dressing the Surface to requiredlevels with Half tonne steel or Wooden rammer and Rolling Every third and top most layers in Roller 8 to 10 tonne Capacity and Including 1.50 mtr Lift and all lead ( earth shall be Brought From a place which including Cartage to Earth by Mecanical transport and T & P labour Etc, Required for Proper Complition Earth shall br Arranged by the Contractor at his Own Cost. | 3,162 | Cum | 363.05 | ₹11,47,964.1 |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 251 | Cum | 4,496.2 | ₹11,28,546.2 |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 121 | Cum | 4,811.9 | ₹5,82,239.9 |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.. 406(4.12) | 361 | Cum | 4,458 | ₹16,09,338 |
| 5 | Brick Edging in Full Brick width and Half Brick Depth including Excavation, Refilling and Disposal of Surplus Earth Lead upto 50 Mtr With Common Burnt Clay F.P.S ( Non modular) Bricks Of Class Designation 150 | 676 | Rmt | 139.94 | ₹94,599.44 |
| 6 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 900 | Sqm | 82.38 | ₹74,142 |
| 7 | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. 502 (5.1) | 1,318 | Sqm | 42 | ₹55,356 |
| 8 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @ 0.50 kg per square metre on the prepared bituminous surface cleaned with mechanical broom. | 5,251 | Sqm | 32.25 | ₹1,69,344.75 |
| 9 | Dense Graded Bituminous Macadam Grading 2
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 153 | Cum | 10,237.3 | ₹15,66,306.9 |
| 10 | Bituminous Concrete Grading 2
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | 122 | Cum | 11,438.8 | ₹13,95,533.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
65C.xls
Additional Documents • 0.05 MB
BOQ_2134958.xls
BOQ • 0.30 MB
65TD.pdf
Tender Documents • 29.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .