Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance GAT NO 304 VILLAGE KONDHAPURI TALUKA SHIRUR VILLAGE KONDHAPURI PUNE MAHARASHTRA 412209 | PUNE | MAHARASHTRA | 412209 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
22 Sept 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
INSTALLATION AND COMISSIONING OF HP AIR COMPRESSOR IN MOTOR ROOM ON-BOARD INS S VIJAY
2020_NAVY_376785_1
DYT/RAC/20-21/106A/PL-INCOD/S VIJAY-COMPRESSOR/126
Single
Miscellaneous Services
Item Rate
140 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
NAVAL DOCKYARD MUMBAI
23 Sept 2020
11 Sept 2020
23 Sept 2020
11 Sept 2020
22 Sept 2020
15 Sept 2020
15 Sept 2020
180 days
Amount
Burckhardt HP Compressor, Model : S5W217L (a) Installation of one no. Burckhardt HP Compressor Model S5W217L(IN Motor Room Compartment) (b) Dismantling of compressor package for Erection and reassembling (c) De-Preservation, Inspection of compressor, Motor & accessories to the scope of supply by Burckhardt Compression (d) Installation of base frame/Foundation plate as per our drawing (e) Installation /Assembly/coupling alignment of HP Compressor and electric motor on base frame (f) Control panel and discharge filter assembly will be installed as per layout drawing (g) Laying of control cables from control panel to the various instruments of the compressor (h) Fitment of compressor system and discharge filter(pipes & all requisite material required for installation shall be in scope of Burckhardt supply) (j) Piping from expansion tank to compressor (k) Integration of sea water system and HP air system of compressor with the ship’s existing systems will have to be carried out within 3 metres distance (l) Checking compressor as per check list (m) Leakage checking (n) No-load and full load trials run (p) Compressor flow capacity trial as per the capacity of the equipment (q) Performance trials for four hours and proving of compressor onboard along with proving of safety inter locks (r) HAT and SAT with proving all safeties
Charges for spares required for installation of compressor
stage.html
html • 0.02 MB
finance_420339.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .