| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹23.4 L+₹21.1 L (921.5%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | PRAJIL K L1 | Muhammed Shameer L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DISABILITY FRIENDLY PARK | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 168 | sqm | 7.84 ₹1,317.12 Lowest | 34.4 ₹5,779.2 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 10.94 | sqm | 113.35 ₹1,240.28 | 102.22 ₹1,118.49 Lowest |
| 1.00 | OD276479/2025-2026:Latterate masonry with neatly dressed laterite stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labor charges etc. | 10.69 | cum | 5,878.9 ₹62,857.2 Lowest | 6,801.14 ₹72,717.79 |
| 1.00 | OD276478/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in dry cement mortar 1:6 for super structure above plinth level up to floor level including all cost of materials labour charges etc. | 13.22 | cum | 6,624.25 ₹87,559.34 | 6,142.7 ₹81,194.21 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6.2 | sqm | 326.17 ₹2,022.25 | 314.57 ₹1,950.33 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.64 | cum | 8,416.2 ₹5,403.2 Lowest | 8,834.69 ₹5,671.87 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 54.57 | kilogram | 94.96 ₹5,181.97 Lowest | 99.68 ₹5,439.54 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 126.36 | sqm | 312.32 ₹39,464.76 Lowest | 327.85 ₹41,427.13 |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 120 | kg | 195.06 ₹23,407.2 Lowest | 204.76 ₹24,571.2 |
Tender Value
₹2.5 L
EMD Value
₹6,329
Closing Date
11 Oct 2025, 5:00 pmClosed
MANJESHKAR P S
Office of the Assistant Engineer, LID EW Section,MALOOR GP
PROJ NO 187/25-26 CONSTRUCTION OF DISABILITY FRIENDLY PARK
2025_LSGD_804475_7
AE/LIDEW/MLR/ET-6/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
MALOOR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,329
Yes
22 May 2026
4 Oct 2025
14 Oct 2025
4 Oct 2025
11 Oct 2025
4 Oct 2025
Amount
CONSTRUCTION OF DISABILITY FRIENDLY PARK
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
OD276479/2025-2026:Latterate masonry with neatly dressed laterite stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labor charges etc.
OD276478/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in dry cement mortar 1:6 for super structure above plinth level up to floor level including all cost of materials labour charges etc.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Muhammed Shameer (BID ID -2383641)
Bidder Name
PRAJIL K
Muhammed Shameer
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1338627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.02 MB
pa.pdf
Tender Documents • 0.12 MB
aff.pdf
Tender Documents • 0.11 MB
sbd.pdf
Tender Documents • 1.05 MB
BOQ_1338627.xls
BOQ • 0.30 MB
fot.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .