Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -36.00% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹10,002.77 (3.89%)Admitted-Finance | -33.51% | ₹2.7 L+₹10,002.77 (3.89%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹57,244.78 (22.3%)Admitted-Finance | -21.75% | ₹3.1 L+₹57,244.78 (22.3%) | L3 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
15 Aug 2026, 4:00 pmClosed
Executive Engineer IFC Division Rajouri
Executive Engineer IFC Division Rajouri
Repair and Renovation of Tuddi Khul from Ziarat Takiya to Mayar Mohalla
2026_IFC_319250_5
e-NIT No. 05 of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
60 days
Rajouri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer IFC Division Rajouri
₹8,000
Yes
19 Aug 2026
3 Aug 2026
17 Aug 2026
4 Aug 2026
15 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 1 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Edges of slabs and breaks in floors and walls
Under 20 cm wide | - | Mtrs. | 1 | - |
| 8 | Carriage of sand and bajree for an average distance of 15km by MT and 100m by Head Load. | - | Cum | - | - |
| 9 | Carriage of cement for an average distance of 5km by MT and 100m by Head Load. | 1 | Mtrs. | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_1056576.xls
BOQ • 0.27 MB
corrigendum.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .