Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 LRejected-AOC | ₹3.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K PRADEEP L1 | BABU L2 |
|---|---|---|---|---|---|
| 1.00Repairs Works | |||||
| 1.00 | 8.6:Mirror polishing on marble work/ granite work/stone work where ever required to give high gloss finish complete. | 133 | sqm | 468.95 ₹62,370.35 | 449.68 ₹59,807.44 |
| 1.00 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 1,566 | per Letter per cm height | 5.68 ₹8,894.88 | 5.44 ₹8,519.04 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 425.6 | sqm | 320.03 ₹1.4 L | 306.88 ₹1.3 L |
| 1.00 | OD261320/2025-2026:Hire and labour charges of red woolen/ carpet including all fixing/spreading charges and<br>removing after function as per the direction of Engineer in charge. | 500 | sqm | 38.67 ₹19,335 | 37.08 ₹18,540 |
| 1.00 | OD261319/2025-2026:Supplying, stacking and spreading of white sea sand including cost of materials and labour charges for spreading as per the direction of site engineer in charge. | 5 | cum | 875.03 ₹4,375.15 | 839.07 ₹4,195.35 |
| 1.01 | OD261321/2025-2026:Supplying loose good qaulity Arali flowers in red and white colour as per the direction of site engineer in charge | 4 | kg | 335.77 ₹1,343.08 | 321.97 ₹1,287.88 |
| 1.01 | OD261318/2025-2026:Supplying and fixing Thumpikai mala with Jamanthi flowers of various colours as per the direction of Engineer in charge | 4 | each | 712.23 ₹2,848.92 | 682.96 ₹2,731.84 |
| 1.01 | OD261316/2025-2026:Supplying and fixing arch with Jamanthi flowers of various colours as per the direction of Engineer in charge | 50 | metre | 432.43 ₹21,621.50 | 414.66 ₹20,733 |
| 1.01 | OD261317/2025-2026:Hire charges for providing mull cloth ceiling with required white/ colored frills in correct level,<br>including all fixing charges and removing after function as per the direction of Engineer in charge. | 95 | sqm | 20.35 ₹1,933.25 | 19.51 ₹1,853.45 |
Tender Value
₹3.9 L
EMD Value
₹9,856
Closing Date
20 Jan 2026, 3:00 pmClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer,Roads Sub Division Thiruvananthapuram
GENERAL Martyrs Day 2026-State FunctionGeneral Civil Work
2026_PWD_827321_1
PWD/RB/TR/23845/2025_5_1_1/1
Open Tender
Civil Works - Roads
30 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹870
Yes
₹9,856
Yes
4 Feb 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
20 Jan 2026
14 Jan 2026
Repairs Works
8.6:Mirror polishing on marble work/ granite work/stone work where ever required to give high gloss finish complete.
13.71:Lettering with black Japan pint of approved brand and manufacture
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
OD261320/2025-2026:Hire and labour charges of red woolen/ carpet including all fixing/spreading charges and<br>removing after function as per the direction of Engineer in charge.
OD261319/2025-2026:Supplying, stacking and spreading of white sea sand including cost of materials and labour charges for spreading as per the direction of site engineer in charge.
OD261321/2025-2026:Supplying loose good qaulity Arali flowers in red and white colour as per the direction of site engineer in charge
OD261318/2025-2026:Supplying and fixing Thumpikai mala with Jamanthi flowers of various colours as per the direction of Engineer in charge
OD261316/2025-2026:Supplying and fixing arch with Jamanthi flowers of various colours as per the direction of Engineer in charge
OD261317/2025-2026:Hire charges for providing mull cloth ceiling with required white/ colored frills in correct level,<br>including all fixing charges and removing after function as per the direction of Engineer in charge.
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Daily labours
OD261322/2025-2026:Daily labour for engaging petty works
OD272141/2025-2026:Supplying fixing and placing of temporary sheds of area not more than 9 sqm for various purposes and dismantling and removing after use including all loading and unloading charges
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
IntegrityPact.pdf
Tender Documents • 0.05 MB
FormofTender.pdf
Tender Documents • 0.03 MB
PreliminaryAgreement.pdf
Tender Documents • 0.08 MB
newaffid.pdf
Tender Documents • 0.26 MB
epaymenynew.pdf
Tender Documents • 0.01 MB
BOQ_1388654.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid