Tender Value
₹76.5 L
EMD Value
₹76,500
Closing Date
12 Aug 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Zone-6, Vadodara
Construction of New Sub Center (G+1) at Village Jekot & Khodva Ta.Dahod Dist.Dahod. (Total 2 Sub Centers)
329718
2026-27/61/04
Open
Civil Works - Buildings
Works
Panchmahal
1 document required · 1 mandatory
₹2,400
PIU-GENERAL FUND A/C 11-114-Gandhinagar
₹76,500
1 Aug 2026
1 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
Name of Work :- Construction of New Sub Center (G+1) at Village Jekot & Khodva Ta.Dahod Dist.Dahod.
(Total 2 Sub Centers)
Memorandom showing items of works to be carried out
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words According to
be more or less Estimated
1 268.60 Cum Excavation for foundation upto 1.50 mt depth including sorting out 160.89 Rupees One Cum
and stracking of usefulmaterials and disposing the excaveted Hundred Sixty And
stuff upto 50 mt lead (B) Dense or Hard Soil Paise Eighty Nine
2 91.00 Cum Excavation for foundation upto 1.50 mt depth including sorting out 275.33 Rupees Two Cum
and stracking of usefulmaterials and disposing the excaveted Hundred Seventy
stuff upto 50 mt lead (C ) Hard Murrum Five And Paise
Thirty Three Only
3 51.60 Cum Excavation for foundation upto 1.5 M. depth including sorting out 284.69 Rupees Two Cum
and stracking of usefulmaterials and disposing off the excaveted Hundred Eighty
stuff upto 50 mt lead (D) Soft rock not requiring Blasting Four And Paise
Sixty Nine Only
4 51.60 Cum Excavation for foundation for depth from 1.5 m to 3.0 m 309.04 Rupees Three Cum
including sorting out and stacking of useful materials and Hundred Nine And
disposing off the excavated stuff upto 50 Meter lead. (D) Paise Four Only
Soft rock not requiring Blasting
5 84.00 Cum Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse 2679.92 Rupees Two Cum
sand : 8 hand broken stone aggregate 40mm nominal size) and Thousand Six
curing comoplete excluding cost of form work in (a) foundation Hundred Seventy
and plinth Nine And Paise
Ninety Two Only
6 29.40 Cum Providing and laying controlled cement concrete M250 work with 4623.42 Rupees Four Cum
curing etc. complete including the cost of form work but excluding Thousand Six
cost of Reinforcement for RCC work in Hundred Twenty
(A) Foundation footing base of columns and mass concrete. Three And Paise
7 4.80 Cum Providing and laying controlled cement concrete M250 work with 6818.05 Rupees Six Cum
curing etc. complete including the cost of form work but excluding Thousand Eight
cost of Reinforcement for RCC work in Hundred Eighteen
(B) Column upto Plinth And Paise Five
8 10.20 Cum Providing and laying controlled cement concrete M250 work with 6979.96 Rupees Six Cum
curing etc. complete including the cost of form work but excluding Thousand Nine
cost of Reinforcement for RCC work in Ground Beam Hundred Seventy
Ninety Six Only
9 6.50 Cum. Providing and laying controlled cement concrete M200 work with 7859.89 Rupees Seven Cum.
curing etc. complete including the cost of form work but excluding Thousand Eight
cost of Reinforcement for RCC work in Column (G.F.) Hundred Fifty Nine
And Paise Eighty
10 152.50 Cum P & L Brick work using common burnt clay Building bricks having 3853.23 Rupees Three Cum
crushing strength not less than 35 Kg/ Sq.Cm. In foundation and Thousand Eight
plinth in cement mortar 1:6 (1 Cement: 6-Fine sand) with curing Hundred Fifty
etc.comp. (b) Conventional Three And Paise
Twenty Three Only
11 70.80 Cum Providing and laying cement concrete 1:2:4 (1- Cement : 2- 3653.61 Rupees Three Cum
Coarse sand : 4- graded stone aggregates excluding cost of Thousand Six
formwork in20 mm nominal size) and curing complete Hundred Fifty
(A)Foundation and Plinth Three And Paise
12 213.40 Cum Filling available excavated earth (excaluding rock ) in trenches. 137.47 Rupees One Cum
Plinth, sides of foundation etc. in layers not exceeding 20cm. in Hundred Thirty
depth consolidating each disposited layer by rammng and Seven And Paise
watering . Forty Seven Only
13 102.40 Cum Filling in foundation and plinth with murrum or selected soil in 273.07 Rupees Two Cum
layers of 20 cm. thickness including watering, ramming and Hundred Seventy
consolidating etc. Complete. Three And Paise
14 180.00 Cum Earthwork of embankment including breaking clods,dressing with 173.31 Rupees One Cum
all lead and lift (exuding watering and consolidation) (E)From Hundred Seventy
Borrow area within 3.0 km lead Three And Paise
Thirty One Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 1 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
15 129.50 Sqm. Applying general insecticide pest control treatment to floors, 54.39 Rupees Fifty Four Sqm.
cupboards etc including labour material etc. complete. Using And Paise Thirty
Heptachloride 20 EC. As Per 6113_pests Consentration Weight Nine Only
0.50 percent is recommended one litre chemical emulsion dillute
with 39 liter of water will give. Total dillute concrentration will be
40 litre inclusive of one litre chemical emulsion appication
Litre chemical / Sqm of surface is recommended as per I.S
16 1.90 Cum Providing and laying controlled cement concrete M-200 with 7744.19 Rupees Seven Cum
curing etc. complete including the cost of form work but excluding Thousand Seven
the cost of reinforcement for R.C.C. work in Lintel. (G.F.) Hundred Forty
17 2.00 Cum Providing and laying controlled cement concretee M-200 for 6288.57 Rupees Six Cum
chhajjas not exceeding 10 cm thickness up to floor two level Thousand Two
Including cost of formwork and curing complete excluding cost of Hundred Eighty
reinforcment (G.F.) Eight And Paise
Fifty Seven Only
18 8.50 Cum Providing and laying controlled cement concrete M-200 with 6934.16 Rupees Six Cum
curing etc. complete including the cost of form work but excluding Thousand Nine
the cost of reinforcement for R.C.C. work in Beam for up to floor Hundred Thirty
two level. (G.F.) (b) beam Four And Paise
19 13.90 Cum Providing and laying controlled cement concrete M-200 finishing 7084.27 Rupees Seven Cum
with curing complete including the cost of form work but excluding Thousand Eighty
the cost of reinforcement for R.C.C. work in Ground Floor Slab. Four And Paise
Twenty Seven Only
20 2.80 Cum Providing and laying controlled cement concrete M-200 with 8257.94 Rupees Eight Cum
curing etc. complete including the cost of form work but excluding Thousand Two
the cost of reinforcement for R.C.C. work up to floor two level Hundred Fifty
(G.F.)(A) Stair case Seven And Paise
Ninety Four Only
21 117.16 Cum Brick work using common burnt clay building bricks having 4141.66 Rupees Four Cum
crushing strength not less than 35 Kg/ Sq.Cm. In Super Structure Thousand One
above plinth level up to floor two level in cement mortar 1:6 (1 Hundred Forty
Cement: 6-Fine sand) with curing etc. (b)Conventional. for G.F. One And Paise
22 27.60 Sqm. Half brick masonary in common burnt clay conventional bricks 645.73 Rupees Six Sqm.
having crushing strength not less than 35 Kg/ Cm2 in cement Hundred Forty
mortar 1:4 (1 cement : 4- Coarse sand) in super structure above Five And Paise
plinth level up to floor two level (b) Conventional (for GF) Seventy Three
23 6.50 Cum Providing and laying controlled cement concrete M200 work with 7898.55 Rupees Seven Cum
curing etc. complete including the cost of form work but excluding Thousand Eight
cost of Reinforcement for RCC work in Column (F.F.) Hundred Ninety
Eight And Paise
Fifty Five Only
24 1.80 Cum Providing and laying controlled cement concrete M-200 with 7782.85 Rupees Seven Cum
curing etc. complete including the cost of form work but excluding Thousand Seven
the cost of reinforcement for R.C.C. work in Lintel. (F.F.) Hundred Eighty
Eighty Five Only
25 2.20 Cum Providing and laying controlled cement concretee M-200 for 6327.24 Rupees Six Cum
chhajjas not exceeding 10 cm thickness up to floor two level Thousand Three
Including cost of formwork and curing complete excluding cost of Hundred Twenty
reinforcment (F.F.) Seven And Paise
Twenty Four Only
26 6.80 Cum Providing and laying controlled cement concrete M-200 with 6972.82 Rupees Six Cum
curing etc. complete including the cost of form work but excluding Thousand Nine
the cost of reinforcement for R.C.C. work in Beam for up to floor Hundred Seventy
two level. (F.F.) (b) beam Two And Paise
Eighty Two Only
27 12.50 Cum Providing and laying controlled cement concrete M-200 finishing 7122.93 Rupees Seven Cum
with curing complete including the cost of form work but excluding Thousand One
the cost of reinforcement for R.C.C. work in First Floor Slab. Hundred Twenty
Ninety Three Only
28 2.80 Cum Providing and laying controlled cement concrete M-200 with 8296.60 Rupees Eight Cum
curing etc. complete including the cost of form work but excluding Thousand Two
the cost of reinforcement for R.C.C. work up to floor two level (A) Hundred Ninety
Stair case (F.F.) Six And Paise
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 2 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
29 48.60 Cum Brick work using common burnt clay building bricks having 4180.17 Rupees Four Cum
crushing strength not less than 35 Kg/ Sq.Cm. In Super Structure Thousand One
above plinth level up to floor two level in cement mortar 1:6 (1 Hundred Eighty
Cement: 6-Fine sand) with curing etc. (b)Conventional. for F.F. And Paise
30 60.40 Sqm. Half brick masonary in common burnt clay conventional bricks 651.63 Rupees Six Sqm.
having crushing strength not less than 35 Kg/ Cm2 in cement Hundred Fifty One
mortar 1:4 (1 cement : 4- Coarse sand) in super structure above And Paise Sixty
plinth level up to floor two level (b) Conventional (for FF) Three Only
31 2.20 Cum Providing and laying controlled cement concrete M200 work with 7937.22 Rupees Seven Cum
curing etc. complete including the cost of form work but excluding Thousand Nine
cost of Reinforcement for RCC work in Column (S.F.) Hundred Thirty
Seven And Paise
Twenty Two Only
32 1.60 Cum Providing and laying controlled cement concrete M-200 with 7011.48 Rupees Seven Cum
curing etc. complete including the cost of form work but excluding Thousand Eleven
the cost of reinforcement for R.C.C. work in Beam for up to floor And Paise Forty
two level. (S.F.) (b) beam Eight Only
33 2.40 Cum Providing and laying controlled cement concrete M-200 finishing 7161.60 Rupees Seven Cum
with curing complete including the cost of form work but excluding Thousand One
the cost of reinforcement for R.C.C. work in S.F. Floor Slab. Hundred Sixty
34 21.00 Cum Brick work using common burnt clay building bricks having 4180.17 Rupees Four Cum
crushing strength not less than 35 Kg/ Sq.Cm. In Super Structure Thousand One
above plinth level up to floor two level in cement mortar 1:6 (1 Hundred Eighty
Cement: 6-Fine sand) with curing etc. (b)Conventional. for S.F. And Paise
35 134.60 Sqm. Providing 10 mm thick cement plaster in single coat on Ceilling 229.17 Rupees Two Sqm.
and sofits of stairs up to floor level for interior plastering upto Hundred Twenty
floor two level and finished even and smooth in cement mortar Nine And Paise
1:3 (1 cement : 3 sand) including finishing with a floating coat a Seventeen Only
neat cment slurry. (GF)
36 131.00 Sqm. Providing 10 mm thick cement plaster in single coat on Ceilling 253.63 Rupees Two Sqm.
and sofits of stairs up to floor level for interior plastering upto Hundred Fifty
floor two level and finished even and smooth in cement mortar Three And Paise
1:3 (1 cement : 3 sand) including finishing with a floating coat a Sixty Three Only
neat cment slurry. (FF)
37 17.20 Sqm. Providing 10 mm thick cement plaster in single coat on Ceilling 283.06 Rupees Two Sqm.
and sofits of stairs up to floor level for interior plastering upto Hundred Eighty
floor two level and finished even and smooth in cement mortar Three And Paise
1:3 (1 cement : 3 sand) including finishing with a floating coat a Six Only
neat cment slurry. (SF)
38 312.60 Sqm. Providing 15 mm thick cement plaster in single coat on 253.61 Rupees Two Sqm.
bricks/concret walls for interior plastering up to floor two level Hundred Fifty
and finished even and smooth in cement mortar 1:3 (1 cement : 3 Three And Paise
sand) including finishing with a floating coat a neat cement Slurry. Sixty One Only
39 310.00 Sqm. Providing 15 mm thick cement plaster in single coat on 278.07 Rupees Two Sqm.
bricks/concret walls for interior plastering up to floor two level Hundred Seventy
and finished even and smooth in cement mortar 1:3 (1 cement : 3 Eight And Paise
sand) including finishing with a floating coat a neat cement Slurry. Seven Only
40 146.80 Sqm. Providing 15 mm thick cement plaster in single coat on 307.50 Rupees Three Sqm.
bricks/concret walls for interior plastering up to floor two level Hundred Seven
and finished even and smooth in cement mortar 1:3 (1 cement : 3 And Paise Fifty
sand) including finishing with a floating coat a neat cement Slurry. Only
41 1526.76 Sqm. 20mm.thick sand faced cement plaster on walls upto height 10 353.98 Rupees Three Sqm.
meters above ground level consisting of 12mm. Thick backing Hundred Fifty
coat of CM.1:3 (1-cement:3-sand) and 8mm.thick finishing coat of Three And Paise
C.M. 1:1 (1-cement:1-sand) etc. complete. Ninety Eight Only
42 242.60 Sqm. Providing and laying polished Kota stone slab flooring over 20mm 1019.39 Rupees One Sqm.
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse Thousand
sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and Nineteen And
jointed with grey cement slurry mixed with pigment to match the Paise Thirty Nine
shade of slab including rubbing and polishing Size 600X600mm Only
etc. complete. (A) 25mm thick (upto 10 ton)
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 3 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
43 22.40 Sqm. Providing and laying polished kota stone slab 25mm thick in risers 1205.60 Rupees One Sqm.
of steps,skirting Dedo and pillars laid on 10mm thick cement Thousand Two
mortar 1:3 (1-Cement : 3 coarse sand) and jointed with gray Hundred Five And
cement slury mixed with pigment to match the shade of slab Paise Sixty Only
including rubbing and polishing etc. complete. (upto 10 ton)
44 14.40 Sqm. Providing and laying ceramic flooring tiles in flooring treads of 1017.30 Rupees One Sqm.
steps and landing laid on a bed of 12 mm. thick cement plaster Thousand
1:3 (1 cement : 3 coarse sand) finishing with flush pointing in Seventeen And
white cement. Paise Thirty Only
45 174.00 Sqm. Providing and laying Coloured glazed tiles of the Following size 1523.67 Rupees One Sqm.
300 mm X 450 mm X 8 mm in Skirting Risers of steps and dado Thousand Five
on 10 mm thick c.m 1:3 ( 1 Cement : 3 Coarse Sand ) & Jointed Hundred Twenty
with white cement slurry. Three And Paise
Sixty Seven Only
46 9.60 Sqm. Providing and laying Chequered precast concrete tiles 22 mm. 788.35 Rupees Seven Sqm.
thick with aggregate of sizes upto 6 mm. in floors, treads of steps Hundred Eighty
and landings on 20 mm. thick bed of C.M. 1:6 (1 cement: 6 sand) Eight And Paise
or like mortar 1:1.5 (1 Lime putty, 1.5 coarse sand) jointed with Thirty Five Only
neat cement slurry with pigment to match the shade of tiles. (B)
Dark Shades Using Ordinary Cement ( Up to 10 Ton )
47 45.60 Rmt. Fabricating, supplying and fixing in position S.S. Railing for 2593.45 Rupees Two Rmt.
staircase and balcony with brush finish and 304 grade as per Thousand Five
Indian Standrd and detailed drawing including grinding, cleaning Hundred Ninety
and filling the welded spots with S.S. finish. Three And Paise
Forty Five Only
48 21.90 Sqm. Providing and fixing flush door shutters, solid core construction 5629.91 Rupees Five Sqm.
with frame of first class hard-wood with cross band and face Thousand Six
veneer Or plywood face panels with teak wood Frame 12cm X Hundred Twenty
7cm Size including anodised alluminium fixtures and fastenings Nine And Paise
(as Per requirement) including primer Coat of approved quality Ninety One Only
and two coats of oil Painting etc Complete.( Decorative type
mm Thick flush door Shutters)
49 16.80 Sqm. providing and fixing 30mm thick Factory made solid panel HD 1146.37 Rupees One Sqm.
PVC door shutter consisting of frame out of PVC C channel of Thousand One
size 30mm X 50 mm formining stiles and 5 mm thick 75mm wide Hundred Forty Six
PVC sheets For a Top rail , Lock rail and bottom on either side And Paise Thirty
and 10mm (5mm X 2mm) Thick 20mm wide cross PVC sheet as Seven Only
gape insert for top rail and Bottomrails panneing of 5 stiles and
rail with 30mm wide X 5mm thick PVC sheets bedding on either
side jointing together with solvent cement adsheve and addtional
5mm thick PVC strip of 20mm width is to be stculk on interior side
of the C channel using PVC Solvent cement adsheve It is
completion as per direction of engineer in charge manufacture
specification and drawingncl, S.S fixtures and fastenings etc
50 34.80 Sqm. Providing and fixing window having extruded aluminum Colour 1583.95 Rupees One Sqm.
anodized section frame main outer size 95mm x 24mm x 1.17mm Thousand Five
(of Jindal Section no:2459 @ wt.of 0.738 Kg/mt), horizontal Three Hundred Eighty
track member size 92mm x 31.75mm x 1.30mm (of Jindal Section Three And Paise
no:8688,@ Wt.1.07 Kg/mt), vertical member of size 92mm x Ninety Five Only
31.75mm x 1.50mm (of Jindal Section no:8933,@ Wt.
Kg/mt) with sliding shutters of horizontal member size
mmx18mm x1.29mm (of Jindal Section no:8947@ wt.of
Kg/mt), vertical member of size 40mm x 18mm x 1.29 mm (of
Jindal Section no:8949 @ wt.of 0.456Kg/mt/ with 5 mm thick
transparent bronze colour tinted float glass with powder coated
aluminum fittings and fixtures and transparent silicon sealant
glass fixing to frame as per details etc
51 2.90 Sq.M Providing and fixing standared extruded of alluminium section of 1175.56 Rupees One Sq.M
size 63mm x 38.10mm x 1.2mm (Jindal Section :2434, @ Wt. Thousand One
0.643 Kg/mt) with colour anodized alluminium frame for ventilation Hundred Seventy
with 5 mm thick frosted glass as details etc complete for Five And Paise
Ventilation Fifty Six Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 4 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
52 1380.00 Kg. Providing and fixing M.S. grills of required pattern to wooden 110.31 Rupees One Kg.
frames of windows etc. with M.S. flats at required spacings and Hundred Ten And
frame alround, square or round bars with round headed bolts and Paise Thirty One
nuts or by screws (A) Plain Grill. (upto 10 ton) Only
53 2.00 Each Provdg. & fixing ball cock of approved quality as directed.(B) 137.89 Rupees One Each
Abonate metal. 50 mm dia Hundred Thirty
Seven And Paise
Eighty Nine Only
54 16717.13 Kg. Providing TMT Bar FE 500/500D reinforcement for R.C.C. work 77.29 Rupees Seventy Kg.
including Cutting, bending, binding and placing in position Seven And Paise
complete upto floor two level (For all floor) Twenty Nine Only
55 11.60 Sqm. Providing and fixing 0.60 meterwide and 0.80Metr high sand 5178.73 Rupees Five Sqm.
which type platform including supplying and fixing granite stone Thousand One
18 mm thick mirror polished stones in top and side position and Hundred Seventy
vertical strip at front over 25 mm thick polished kotah stone Eight And Paise
platform fixing in top and sides and intermediates supports fixing Seventy Three
with cement mortar and adhesive and finishing etc complete. Only
56 23.40 Sqm. Providing and fixing Godrej Type Steel cupboards in wall with 4683.37 Rupees Four Sqm.
steel frames and shutters using 18 gauge M.S. steel sheet Thousand Six
including necessary fixtures , fastening like locks handles, hinges Hundred Eighty
with approved shade of sparay painting etc complete as directed Three And Paise
Thirty Seven Only
57 1028.32 Sqm. Clearing and grubbing road land including uprooting rank 8.63 Rupees Eight And Sqm.
vegetation grass bushes,shrubs,sapling and trees girth up to 300 Paise Sixty Three
mm removal of stumps of trees cut earlier and disposal of Only
unserviceable materials. (A) By manual means in area of light
58 16.60 Sqm. Providing and laying machine cut free edges machine polished 1151.42 Rupees One Sqm.
Kota stone for shelves in cupboard and walls in single piece Thousand One
(Miximum 150) 25 mm including cutting grooves in walls and Hundred Fifty One
fixing the stone with neat cement slurry in true line and level as And Paise Forty
direct Two Only
59 976.20 Sqm. Distempering (two coats) with oil bound washable distemper of 77.30 Rupees Seventy Sqm.
approved brands and manufacture & required shade on wall Seven And Paise
surface to give an even shade over and including a priming coat Thirty Only
with alkali resistance primer of approved brand after throughly
brushing the surface and other foreign matter and also including
preparing the surface even and sand parpared smooth.
60 1526.76 Sqm. Finishing wall with weather proof Apex exterior emulsion paint on 122.14 Rupees One Sqm.
wall surface (two coats) to give an required shape even shade Hundred Twenty
after thoroughly brushing the surface to remove all dirt, and Two And Paise
remains of loose powdered materials.etc complete. Fourteen Only
61 106.40 Sqm. Painting Two coats (including priming Coat) on New Steel And 138.78 Rupees One Sqm.
Other Metal Surface with enamel paint, brusing.shade including Hundred Thirty
cleaning of all dust, dirt and other foreign matter sand papering Eight And Paise
and stopping. Seventy Eight Only
62 103.60 Sqm. Providing and laying chaina mosic water proofing treatment on 1136.38 Rupees One Sqm.
terrace including applying neat cement slurry 2.75 Kg./Sqm. Of Thousand One
cement admixed with water proofing compound after cleaning the Hundred Thirty Six
surface (b) 'Providing and laying cement concrete flooring 1:2:4 (1- And Paise Thirty
cement : 2-coarse sand : 4-graded stone aggregate 20mm Eight Only
nominal size) laid in one layer and finished with a floating coat of
neat cement. (A) 50mm thick. (upto 10 ton) admixed with water
proofing compound over 20 mm thick layer of C.M. 1:5 to required
slope including rounding of junction of walls and slabs (a) after
two days providing and Laying chaina mosaic for terrace using
12mm to20mm broken pieces of glazed tiles to be Laid over CM-
1:3 to plane or slope and to be telmperd to bring mortar crème out
upto surface using white cement including rounding off Junction
and extending them upto 15cm along the wall clearing with water
and oxalic acid etc
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 5 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
63 60.00 Meter Providing laying and jointing in true line and level 15mm dia. 72.65 Rupees Seventy Meter
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings make Two And Paise
PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as Sixty Five Only
approved by Engineer In Charge. Pipe shall be fixed on the wall
with the help of clamp at every two metre C/C or shall be
concelled as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.[A] 15 mm.
64 90.00 Meter Providing laying and jointing in true line and level 25mm dia. 91.84 Rupees Ninety Meter
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings make One And Paise
PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as Eighty Four Only
approved by Engineer In Charge. Pipe shall be fixed on the wall
with the help of clamp at every two metre C/C or shall be
concelled as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.[B] 25 mm.
65 60.00 Meter Providing laying and jointing in true line and level 40mm dia. 148.12 Rupees One Meter
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings make Hundred Forty
PRINCE / SUPREME / ASTRAL / FINOLEX or equivalent as Eight And Paise
approved by Engineer In Charge. Pipe shall be fixed on the wall Twelve Only
with the help of clamp at every two metre C/C or shall be
concelled as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.[D] 40 mm.
66 60.40 Rmt. Providing and Fixing PVC ISI Mark pipe 6 kg. per Sqm. spigot 306.47 Rupees Three Rmt.
and socket waste and ventilating pipe of following nominal size. Hundred Six And
75 mm. dia. Paise Forty Seven
67 90.00 Rmt. Providing and fixing P V C SWR Pipe IS 13592 for drain spigot 751.45 Rupees Seven Rmt.
and socket soil waste and ventilating pipe of the following nominal Hundred Fifty One
size 160 mm dia. And Paise Forty
68 52.00 Meter Providing. & fixing on wall face 110 mm dia PVC rain water pipe 6 501.51 Rupees Five Meter
kg/ sq Cm of FINOLEX SUPRIME, KISHAN or PRINCE brand is Hundred One And
used incl. filling the joints with spun yarn soaked in neat cement Paise Fifty One
slurryand cement mortar 1:2 (1 cement : 2 fine sand) Only
69 4.00 Each Providing and fixing S.W. gully trap with C.I. grating brick 1292.19 Rupees One Each
masonry chamber and water tight C.I. cover with frame of 300mm Thousand Two
x 300mm size (inside) with standard weight.(i) Square mouth Hundred Ninety
traps. (A) 100mm x 100mm size P type. (upto 10 ton) Two And Paise
70 12.00 Each Providing and fixing PVC SWR Nahni trap IS 14735 for drain - 600.23 Rupees Six Each
100 mm diameter with jali of the following nominal diameter of self Hundred And
cleansing design with C.I scread down or hinged grating including Paise Twenty
the cost of cutting and making good the walls. Three Only
71 4.00 Each Providing and fixing wash down water closet (european type W C 2043.86 Rupees Two Each
pan) with integral P and S trap including jointing the trap with soil Thousand Forty
pipe in cement mortar 1:1 ( 1 cement fine sand) including Three And Paise
Providing and fixing Plastic Seat and cover for wash down water Eighty Six Only
closet with C.P. brass hinges and rubber buffers and also
includes provide and fixing jet wash Facilities complete
(A)Vitereous China Pattern:
(I) in White Colour
72 6.00 Each Providing and fixing Veterious China flat back wash basin with 2147.26 Rupees Two Each
single hole for pillar trap with CI or MS brackets painted with Thousand One
including cutting holes and making good the same including all Hundred Forty
necessary fittings in white colour.including pillar trap15mm Dia & Seven And Paise
Waste Pipe 32mm Dia Twenty Six Only
73 4.00 Each Providing and fixing ( 600 X 450 X 150 mm) size vitreous china 2473.32 Rupees Two Each
laboratory sink /Kitchen Sink with CI or MS brackets painted white Thousand Four
including cutting holes in wall and making good the same 40 mm Hundred Seventy
dia CP waste couplin rails etc. complete. Three And Paise
Thirty Two Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 6 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
74 14.00 Each Providing and fixing 15 mm dia brass chromium plated screw 186.83 Rupees One Each
down bib taps. Hundred Eighty
Eighty Three Only
75 4.00 Each Providing and fixing brass Cromiam Plated Sergical handle Cock 1404.91 Rupees One Each
of Size 15mm dia.etc. Thousand Four
Hundred Four And
Paise Ninety One
76 4.00 Each Providing and fixing brass Cromiam Plated brass half trun Flush 263.77 Rupees Two Each
cock of approved quality including fixing in pipe line etc Complete. Hundred Sixty
25mm dia. Three And Paise
77 4.00 Each Providing & fixing PVC or non-return full valve (C)25 mm dia 420.63 Rupees Four Each
And Paise Sixty
78 4.00 Each Providing & fixing PVC or non-return full valve (E) 40 mm dia 663.43 Rupees Six Each
Three And Paise
Forty Three Only
79 6.00 Each Providing and fixing 600mm x 450mm bevelled edge mirrror of 859.41 Rupees Eight Each
superior glass mounted on 6mm thick A.C. sheet or plywood Hundred Fifty Nine
sheet and fixing to wooden pluge with C.P. brass screws and And Paise Forty
washers. One Only
80 6.00 Each Providing and fixing C.P. brass towel rail comlete with C.P. brass 616.42 Rupees Six Each
brackets fixed to wooden plugs with C.P. brass scews.(B) 600mm Hundred Sixteen
x 20mm size. And Paise Forty
81 4.00 Each Providing and fixing in position PVC Cowel vent to pipes (ii) 75 154.24 Rupees One Each
mm. dia Hundred Fifty Four
And Paise Twenty
82 8.00 Each Constructing brick masonry chamber for underground C.I. 2932.93 Rupees Two Each
Inspection chamber and bends with briocks having croshing Thousand Nine
strength not less than 35Kg. Cm2 in C.M. 1:5 C.I. cover with Hundred Thirty
frame (Light duty) 455mm x 610mm intenal dimensions total Two And Paise
weight of cover with frame to be not less than 38Kg. (Wt. of cover Ninety Three Only
23 Kg.) and Wt. of frame 15Kg. ) (R.C.C. top slabe with 1:2:4 mix
(1-cement :2- coarse sand :4-graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside plaster 15mm thick with cement
mortar 1:3 finished smooth with a floating coat of neat cement on
walls and bed concrete etc. complete.(i) Inside dimensions
455mmx 610mm and 450mm deep for single pipe line. (upto
83 4000.00 Litre Providing erecting and fixing double coated Syntex PVC. (ISI) 3.95 Rupees Three Litre
water tank of required capacity each with all necessary fittings And Paise Ninety
and connection etc. complete on terrace. Five Only
84 18.96 Qtl Steel work welded in built up sections framed work including 9108.48 Rupees Nine Qtl
cutting, hoisting, fixing in position and applying a priming coat of Thousand One
red lead paint. [A.] In beams and joists, channels angles tees, Hundred Eight
flats with connecting plates or angle cleats as in main and cross And Paise Forty
beams, Hip and jack rafters, purlins connected to common rafters Eight Only
85 12.00 Each Providing and fixing 3mm thick PVC sheets as signage and 333.30 Rupees Three Each
display of health signs/information of required size having retro Hundred Thirty
reflective letters/design as per requirement, fixing the same Three And Paise
through approved adhesive etc. complete, work shall be carried Thirty Only
out as per instruction of engineer-in-charge. (Approved make
PVC foamed sheets only)(45 x 15 cms)
86 11.88 Cum Providing and laying controlled cement concrete M200 work with 5138.21 Rupees Five Cum
curing etc. complete including the cost of form work but excluding Thousand One
cost of Reinforcement for RCC work in copping Hundred Thirty
Eight And Paise
Twenty One Only
87 6.20 Sqmt (i) Half brick masonry in common brunt clay building bricks 590.01 Rupees Five Sqmt
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Hundred Ninety
mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and And Paise One
plinth (B) Conventional (upto 10 ton) Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 7 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
88 6.20 Cum Honey Comb Brickwork With Common Burnt Clay Building Bricks 2582.57 Rupees Two Cum
Having Crushing Strength Not less than 35 Kg / Sqmt (i) In Thousand Five
Cement Mortar 1:6 (1 Cement 6 Coarse Sand ) etc. Complete . Hundred Eighty
Fifty Seven Only
89 4.00 Nos Providing & fixing SFRC Cover With frame Size 600X 450 X100 1666.50 Rupees One Nos
mm thick with trasportation charge etc. complete Thousand Six
Hundred Sixty Six
And Paise Fifty
90 3.80 Cum Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 6888.15 Rupees Six Cum
2- coarse sand : 4- graded stone aggregates 20 mm nominal size) Thousand Eight
and finishing smooth with curing etc. complete including the cost Hundred Eighty
of formwork but excluding the cost of reinforsement for R.C.C Eight And Paise
work in (iii) Slabs having more than 10 cm and upto 13 cm. Fifteen Only
91 3.00 Rmt. Providing and fixing to wall, ceiling and floor 10.0 Kg f/cm2 339.05 Rupees Three Rmt.
working pressure polythelene pipes of the following outside dia. Hundred Thirty
high density, complete with special flange compression type Nine And Paise
fittings wall clamps etc. including making good the wall, ceiling Five Only
and floor 110mm
92 2.00 Each Providing and fixing in position PVC Cowel vent to pipes (i) 110 180.77 Rupees One Each
mm. dia Hundred Eighty
93 360.00 Meter Drilling of 215 mm dia. Bore in over burden strata (0-30) including 276.74 Rupees Two Meter
lowering and fixing of 175 mm nominal dia UPVC pipe/175 mm Hundred Seventy
dia ERW pipe upto required depth and further drilling of 165mm Six And Paise
dia bore hole in rocky strata by DTH rig. Seventy Four Only
94 36.00 Meter Manufacture, supply and delivery of ISI marked (IS-12818) with 915.06 Rupees Nine Meter
latest amendment. Hundred Fifteen
c) 175 mm nominal dia. "CS" type And Paise Six Only
95 2.00 Nos Single phase borewell submersible pump motor set 10857.50 Rupees Ten Nos
MOC: Casing: CI-FG260, Impeller: Bronze & Shaft: SS:410 Thousand Eight
Category Q-1.2, 20 LPM Discharge, 90 m Head, 1.5 HP Hundred Fifty
Seven And Paise
96 350.00 Meter Manufacture, supply and delivery of following ISI marked HDPE 55.55 Rupees Fifty Five Meter
pipes (IS:4984/1985 with latest amendment) having material And Paise Fifty
Grade PE-80 in approximate 100 meter coil length or as per Five Only
GWSSB requirement with SS- 316 nipple at both ends having
TPI threads as per specifications, press fitted and bolted having
nominal diameter as under as per detailed technical
specifications. DN 40 mm PN-10
97 440.00 Meter PVC insulated flat submersible cable as per detailed technical 58.58 Rupees Fifty Eight Meter
specifications of R/C of GWSSB conforming to IS 694, IEC 60227 And Paise Fifty
/ 60228. Eight Only
98 2.00 Nos Lifting or Lowering of single phase submersible pump set 707.00 Rupees Seven Nos
complete with required length of HDPE pipe & cable in bore well Hundred Seven
and fitting of control panel board including wiring work and Only
satisfactory testing as per instruction of Engineer-in-charge
including carting of material to site.
Up to 90 meter depth
ELECTRIFICATION WORK
99 64.00 Pt. Point wiring for Light / Bell with 2-1.5 sq.mm & earth wire of 1.5 582.77 Rupees Five Pt.
sq.mm (Green) both are of ISI marked 1.1 KV grade FRLS PVC Hundred Eighty
insulated multi strand copper wires up to 10 mtr length , in below Two And Paise
type of pipe erected with 6A Modular type switch / bell push & Seventy Seven
accessories and earth continuity of following type, erected on Only
PVC / Metallic/Wooden box, single mounting base frame covered
with textured/metallic/white front plate modules erected on / in
wall / ceiling as per pipe erected, with necessary Lamp
holder/ceiling rose / H.D.Connector as directed.(f) with medium
class Rigid PVC pipe and accessories erected concealed in
wall/ceiling complete
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 8 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
100 14.00 Pt. Point wiring for FAN with 2-1.5 sq.mm & earth wire of 1.5 sq.mm 809.01 Rupees Eight Pt.
(Green) both are of .ISI marked 1.1 KV Grade FRLS PVC Hundred Nine And
insulated multi strand copper wires up to 10 mtr length, in below Paise One Only
type of pipe erected with 6A Modular type switch and hum free
EME four or more step type electronic fan regulator with
separately mounted and accessories with earth continuity of
following type erected on PVC / Metallic/Wooden box, single
mounting base frame covered with textured/metallic/white front
plate modules erected on / in wall / ceiling as per pipe erected.
with necessary ceiling rose / H.D.Connector as directed.(f) with
medium class Rigid PVC pipe and accessories erected concealed
in wall/ceiling complete. Cat-IIIted.
101 14.00 Pt. Point wiring for Individual Plug with & earth wire of 1.5 sq.mm 612.06 Rupees Six Pt.
(Green) both are of ISI marked 1.1 KV grade FRLS PVC Hundred Twelve
insulated multi strand copper wires up to 10 mtr length, in below And Paise Six Only
type of pipe erected complete with Modular type switch & 5 pin
Plug erected on PVC / Metallic/Wooden box covered with
appropriate front plate modules erected on / in wall / ceiling as per
pipe erected with following type of accessories. [I] For 6A Plug
and 6 a switch with 2-1.5 sq.mm Cu. Wire from nearby
switchboard/mcb db board (f) with medium class Rigid PVC pipe
and accessories erected concealed in wall/ceiling complete
102 28.00 Pt. Point wiring for on board Looped Plug with 6A Modular type 309.06 Rupees Three Pt.
switch & 5 pin socket erected on PVC / Metallic/Wooden box, Hundred Nine And
single mounting base frame covered with textured / metallic/white Paise Six Only
front plate modules erected on / in wall / ceiling with following
type accessories III
103 0.00 Pt. Providing following type of Modular Type Accessories mounted 0.00 Rupees Nil Pt.
with PVC / metallic/Wooden box, single mounting base frame
covered with textured / metallic/white front plate , modules
erected with necessary connections as per site situation directed
by Engineer In charge.
104 14.00 Pt. (9) 16 Amp. SP one way switch 180.79 Rupees One Pt.
Seventy Nine Only
105 14.00 Pt. (10) 6/16Amp. Universal socket 199.98 Rupees One Pt.
Ninety Eight Only
106 200.00 Mtr Providing and erecting ISI mark Medium class RIGID PVC PIPES 24.24 Rupees Twenty Mtr
of following size complete to be erected on/in wall or ceiling Four And Paise
erected with necessary PVC fittings & Junction boxes fixed with Twenty Four Only
adhesive solution & Clamps with following dia of pipes, in
approved manner as directed (a) 20 mm
107 160.00 Mtr (ii) 25mm 33.33 Rupees Thirty Mtr
Three And Paise
Thirty Three Only
108 400.00 Mtr Providing and erecting Mains with 1.1 KV grade FRLS PVC 104.03 Rupees One Mtr
insulated ISI marked stranded Copper conductor wire in following Hundred Four And
type of pipe to be erected concealed in /flushed on wall/ceiling, Paise Three Only
with 1.5 sq. mm copper conductor FRLS PVC insulated stranded
wire of green colour for earth continuity of following size (A) with
medium class Rigid PVC pipe and accessories (B) 2 wire
109 160.00 Mtr providing and erecting Mains with 1.1 KV grade FRLS PVC 140.39 Rupees One Mtr
insulated ISI marked stranded Copper conductor wire in following Hundred Forty
type of pipe to be erected in / on wall / ceiling with 2.5 sq. mm And Paise Thirty
copper conductor FRLS PVC insulated stranded wire of green Nine Only
colour for earth continuity of following size(A) with medium class
Rigid PVC pipe and accessories(a) 2 wire 4 sq. mm
110 4.00 Ea. Decorative call bell Ting-tong box type 250 volts complete erected 71.71 Rupees Seventy Ea.
Seventy One Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 9 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
111 12.00 Ea. Approved make C.F.L. Retrofit 13/15/18 Watt erected if 137.36 Rupees One Ea.
required.Cat.III Hundred Thirty
Seven And Paise
Thirty Six Only
112 28.00 Ea. Supplying and erecting LED indoor fittings with LEDs of wattage 373.70 Rupees Three Ea.
0.2 Watt to 0.5 Watt assembled on single MCPCB, with housing Hundred Seventy
used as a heat sink shall be made of thick sheet Steel conforming Three And Paise
to IS: 513/CRCA polyester powder coated and high U.V. & Seventy Only
corrosion resistance with diffuser and/or Polycarbonate optics
with company mark/name 120 to 300 V,Power Factor more than
0.9, THD < 10 %, CCT 4000 K to 6500K, Uniformity ratio >0.7,
Luminaire efficiency> 85 lumens/watt , LED driver efficiency >
% CREE / OSRAM / PHILIPS Lumileds / NICHIA /
SEOUL/Bridgelux(U.S.A.) make LED used for luminaire. (Each
fitting required LM-79 & LM-80 Certificates) (A) Tube Light with
integral/ non-integral driver
(iv) 22-24 Watts, Surge -4 KV,IP-20, 4 feet, Cat-lll
113 8.00 Ea. Supplying and erecting LED street light / Flood light fittings with 2843.15 Rupees Two Ea.
High power White LEDs wattage of 1Watt and above assembled Thousand Eight
on single MCPCB, efficiency more than 130 lm/w and corrosion Hundred Forty
free High pressure die cast aluminum housing with smooth finish Three And Paise
powder coated and heat sink extruded aluminium with diffuser Fifteen Only
and Polycarbonate optics/ lenses with company mark/name
engraved or embossed 120 to 300 V,Power Factor more than
0.95, THD < 10 %, CCT 3000 K to 5700K, Uniformity ratio >0.45,
Luminaire efficacy> 100 lumens/watt . LED driver efficiency >
%.CREE / OSRAM / PHILIPS Lumileds / NICHIA / SEOUL/
BridgeLux (U.S.A.) make LED used for luminaire. ( fittings
required LM-79 & LM-80 certificates)(NOTE: Below description
have shown ranges of Wattage capacity of LED fittings.The
Engineer incharge may select any wattage capacity between the
ranges shown.)' (A) Street Light (IP-65), Surge protection -4KV
integral and ,Light must have 440VAC line supply with over-
voltage protection. (i) 36 - 47 watts
114 48.00 Ea. providing and erecting Miniature circuit breaker single pole 6A to 123.22 Rupees One Ea.
25A suitable to operate on 240 V A.C. system and having Hundred Twenty
breaking capacity 10 KA to be erected in existing box. confirming Three And Paise
to IS 8828/1996 with ISI Mark Cat.III Twenty Two Only
115 8.00 Ea. Providing & erecting 240 V MCB double pole switch for lighting 362.59 Rupees Three Ea.
Load (B Curve) having 10 KA breaking capacity & confirms to IS : Hundred Sixty
8828 in existing box having following capacity (B) 40 Amp.Cat.III Two And Paise
Fifty Nine Only
116 4.00 Ea. Plastic enclosure fitted with DIN rail suitable for incorporating 52.52 Rupees Fifty Two Ea.
One / Two nos. MCB And Paise Fifty
117 4.00 Ea. Providing and erecting Sheet Steel powder coated MCB 1492.78 Rupees One Ea.
distribution board - flush / surface mounted fitted with busbar, Thousand Four
neutral link, earth bar and DIN rail, Conforms to IS 8623-1 & 3, Hundred Ninety
IEC 61439-1 & 3 without MCB to house appropriate nos. of Two And Paise
MCBs.(The DBs should be used of same company of MCB to be Seventy Eight Only
used) suitable for (b) sheet steel double door (IP-43) (iv)12 way
118 20.00 Kg Providing and erecting HOT deep Galvanised iron strip/wire 77.77 Rupees Seventy Kg
4.064mm to 1.626mm. Seven And Paise
119 4.00 Ea. Supplying & erecting funnel type earthing having earth plate of 2311.89 Rupees Two Ea.
following size burred in specifically prepared earth pit 3 mtr. Thousand Three
below ground with 40 kg. charcoal and salt with alternate layers of Hundred Eleven
charcoal & salt, 20mm.dia. G.I. pipe with Funnel with a wire And Paise Eighty
mesh for watering & bricks masonry block, C.I. Cover complete Nine Only
as per para 7.3 of IS 3043 with necessary length of double
Galvanised Iron / copper earth wire No 6 SWG bolted with lug to
the plate and covered in 12 mm dia. G.I. pipe 2.5 mtr long
complete connected to the nearest switch gear with end socket
as per direction & duly tested by earth tester confirming to IS (As
per drawing) with following specification (A) With 30 x 30 x
cms: C.I. earth plate.
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 10 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
120 14.00 Ea. Providing & erecting Approved make Ceiling Fan with double ball 1738.21 Rupees One Ea.
bearing ISI mark with condenser A.C.230V 50 Hz. 1400 mm. Thousand Seven
sweep complete, canopy erected on existing hook or clamp with Hundred Thirty
earthing [ Make shall be approved by Engineer in Charge] Eight And Paise
Twenty One Only
121 14.00 Ea. Supplying & erecting fan hook box of 10 mm M.S. round bar 108.07 Rupees One Ea.
bounded to the RCC bars up to 50mm length each side and Hundred Eight
pierced through a 16 Gauge M.S. box / Heavy Duty PVC box And Paise Seven
complete erected concealed in Ceiling with necessary finishing. Only
122 8.00 Ea. Supplying & erecting approved make SMC press moulded 476.72 Rupees Four Ea.
composite FRP. loop-in, loop-out approx. 2mm thick box Hundred Seventy
complete with Bakelite connector strip 5way(3P+N+E),DIN rail for Six And Paise
mounting mob & hinged doors as per requirement having locking Seventy Two Only
arrangements with mounting clamp with nuts, bolts & washers
suitable for erection on pole with cable clamps& earth bolt of
following size of box ( c)150mm x 125mm x 100mm [deep]
123 8.00 Ea. Supplying and erecting B class galvanised iron pipe 32 mm 343.40 Rupees Three Ea.
outside dia 45 cm long duly welded on 20 cm x 20 cm x 3 mm Hundred Forty
thick M.S. base plate, erected on wall or corner for mounting Three And Paise
street light luminaire with necessary hardware materials duly Forty Only
124 180.00 Ea. Providing and erecting XLPE (IS:7098)(I)-88 ISI armoured cable 140.39 Rupees One Ea.
multistrand / Solid Aluminium conductor for 1.1 KV. to be laid on Hundred Forty
wall with necessary clamps or in existing trench / pipe of And Paise Thirty
following size of cables) (A) 4 core 4 Sq. mm Nine Only
125 2.00 Ea. Providing & erecting open well type horizontal mono block pump 8728.42 Rupees Eight Ea.
set with stainless steel body having following specification (A) Thousand Seven
0.5 H.P. Single phase open well motor pump set having Hundred Twenty
discharge of 75 LPM @ 15 Mtr. Head suitable for 32 mm dia. Eight And Paise
delivery pipe with control panel. Cat-II Forty Two Only
126 2.00 Ea. Supplying and erecting Direct - On - Line Starter with 18 A. rating 2100.80 Rupees Two Ea.
contactor and with 3.5 Amp. 18A range directly operated in totally Thousand One
insulated elegant enclosure for single phase operation up to 3 HP Hundred And
as per IS 13947 complete erected on P.W. Block with necessary Paise Eighty Only
connection. Cat-lll
127 2.00 Ea. Lowering of submersible motor pump set at the depth of following 856.48 Rupees Eight Ea.
,complete with required. Nos. and size of casing pipes erected by Hundred Fifty Six
means of proper chain pulley block & pipe wrenches after And Paise Forty
checking of threads of each pipe with coupling to take the load of Eight Only
the pump set and pipe assembly filled up with water (D)For Open
well Horizontal submersible pump set for sump well (i) 1 HP to
128 100.00 Mtr Providing and erecting ISI marked PVC insulated PVC Sheathed 65.65 Rupees Sixty Five Mtr
Flat flexible Submersible copper cable approved make of And Paise Sixty
following Size. (a) 3 Core x 1.5 Sq. mm Five Only
- 2.00 JOB Dismental material Please refer Note No. (6) as Given Below
Total cost of Civil+Electrical work Rs.
Rupees Seventy Six Lakh(s) Forty Six Thousand Three Hundred Ninety Six And Paise Fifty One Only
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 11 of
Item Quantities Items Description Estimated Rates Unit Total amount
Item Quantities Items Description Estimated Rates Unit Total amount
No. estimated but may In Figures In Words
be more or less Estimated
I/We am/are willing to carry out the work at % above/below percent (Should be written in figures and words) of the estimated rate
mentioned above. The amount of my/ our Bid works out as below.
Amount of My / our Tender Work out as under.
Estimated amount put to Bid ________________________ Estimated amount put to Bid
ADD___________% ABOVE Deduct.___________% below
Nett Amount Nett Amount
* (Please strike out whichever not applicable.)
1) All the works shall be carried out as per public work deptt. and book and other specifications of the division or as
2) di t dcolumns in the contractor be filled in ink and the total entries in the last columns should be struck by the
contractor under his signature.
3) Rate quoted include clearance of site ( prior to commencement of work and its close) in all respects and held good for
work under all conditions site moisture weather etc. )
4) GST at 2% Value of Workdone shall be Recovered from Contractors Bill
5) To be continued on additional sheets, if found necessary
6) Recovery Towards cost of dismantled material shall be made for Rs.6400.00 from the 1st R.A.Bill of Contractor.
Quantity, rates & wording of items are as per estimates and calculation in the schedule " B " are arithmetically checked and found
Deputy Executive Engineer Executive Engineer
Project Implementation Unit Zone-6 Project Implementation Unit Zone-6
DTP Sub Center Jekot-Khodva Ta.Dahod SOR 24-25 12 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6372 Make List new.pdf
BUILDING SPECIFICATION BOOKLET.pdf
Insurance Clause - Inclusion in SBD.pdf
Special Conditions of PIU-27-05-2026.pdf
Annexure-2 Sub Center Jekot-Khodva Ta.Dahod SOR 24-25.pdf
DTP Statement Sub Center Jekot-Khodva Ta.Dahod SOR 24-25.pdf
GR-Special Conditions All.pdf
ElectricalSpecification.pdf
SBD Sub Center Jekot-Khodva Ta.Dahod SOR 24-25.pdf
SCH.B Sub Center Jekot-Khodva Ta.Dahod SOR 24-25.pdf
Specification Sub Center G-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .