| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹43.3 L+₹22,953.83 (0.53%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹43.4 L+₹32,083.57 (0.74%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | smart communications and Constructions L2 | ANAND SINGH L3 | Sarfaraj Farniture Fabrication and Contrector L1 |
|---|---|---|---|---|---|---|
| 1.00Excavation | ||||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1 . 5 m in width or 1 0 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 121.65 | Cum | 260 ₹31,629 | 260 ₹31,629 | 258 ₹31,385.7 Lowest |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 17 | Cum | 195 ₹3,315 Lowest | 198 ₹3,366 | 195 ₹3,315 Lowest |
| 4.00 | Treatment of soil under existing floors using chemical emulsion @one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement: 2 Coarse sand) to match the existing floor:
2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1 % concentration | 25.21 | Sqm | 308 ₹7,764.68 | 310 ₹7,815.1 | 305 ₹7,689.05 Lowest |
| 5.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 2.52 | Cum | 2,122 ₹5,347.44 | 2,121 ₹5,344.92 | 2,120 ₹5,342.4 Lowest |
| 6.00 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 6.3 | cum | 700 ₹4,410 Lowest | 705 ₹4,441.5 | 700 ₹4,410 Lowest |
| 7.00CONCRETE Work | ||||||
| 8.00 | 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.69 | cum | 6,810 ₹18,318.9 | 6,785 ₹18,251.65 | 6,780 ₹18,238.2 Lowest |
| 9.00REINFOR ED CEMENT CONCETE WORK | ||||||
| 10.00Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana I Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | ||||||
Tender Value
₹43.6 L
EMD Value
₹1.1 L
Closing Date
29 Aug 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishad, Narendra Nagar
Construction of Dev Bhoomi Rajat Jayanti Park
2026_NPNN_98548_1
532/etender/NPP Date 01-08-2026
Open Tender
Civil Works
Item Rate
180 days
Nagar Palika Parishad, Narendra Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EO Nagar Palika Parishad
₹1.1 L
Nagar Palika Parishad, Narendra Nagar
24 Sept 2026
5 Aug 2026
31 Aug 2026
5 Aug 2026
29 Aug 2026
8 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1 . 5 m in width or 1 0 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 121.65 | Cum | 260.3 | ₹31,665.5 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 17 | Cum | 196 | ₹3,332 |
| 4 | Treatment of soil under existing floors using chemical emulsion @one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement: 2 Coarse sand) to match the existing floor:
2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1 % concentration | 25.21 | Sqm | 310.05 | ₹7,816.36 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 2.52 | Cum | 2,123.75 | ₹5,351.85 |
| 6 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 6.3 | cum | 700.5 | ₹4,413.15 |
| 7 | CONCRETE Work | - | - | - | - |
| 8 | 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.69 | cum | 6,812 | ₹18,324.28 |
| 9 | REINFOR ED CEMENT CONCETE WORK | - | - | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse
aggregate and fine aggregate derived from natural sources, Portland Pozzolana I Ordinary Portland /Portland Slag cement, admixtures in
recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following
grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content
in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TermsConditions.pdf
Tender Documents • 2.44 MB
BOQ_116270.xls
BOQ • 0.33 MB
Corrigendum.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .