Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.8 L (4.29%)Admitted-Finance | ₹1.2 Cr+₹4.8 L (4.29%) | L2 | Admitted-Finance |
| 3 | L3₹8.2 Cr+₹7.1 Cr (640.5%)Admitted-Finance C 111 STATION PLAZA STATION ROAD STATION ROAD BHANDUP W MUMBAI 400078 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹8.2 Cr+₹7.1 Cr (640.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 5 | Rejected-Technical 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S NIRAKAR ENGINEERING L2 | Mercury Ship Repairs Pvt Ltd L1 | shine industries L3 |
|---|---|---|---|---|---|---|
| 1.01 | IN Ships and Yard Crafts:-
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 325 | Nos | 1,000 ₹3,25,000 Lowest | 1,200 ₹3,90,000 | 5,000 ₹16,25,000 |
| 1.02 | Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 325 | Nos | 500 ₹1,62,500 | 300 ₹97,500 Lowest | 5,000 ₹16,25,000 |
| 1.03 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 275 | Nos | 1,200 ₹3,30,000 Lowest | 1,200 ₹3,30,000 Lowest | 5,000 ₹13,75,000 |
| 1.04 | Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 275 | Nos | 600 ₹1,65,000 | 450 ₹1,23,750 Lowest | 5,000 ₹13,75,000 |
| 1.05 | IN Submarines:-
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 2,750 | Nos | 1,000 ₹27,50,000 Lowest | 1,200 ₹33,00,000 | 6,000 ₹1,65,00,000 |
| 1.06 | Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 2,750 | Nos | 500 ₹13,75,000 | 300 ₹8,25,000 Lowest | 6,000 ₹1,65,00,000 |
| 1.07 | Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 2,750 | Nos | 1,530 ₹42,07,500 | 1,400 ₹38,50,000 Lowest | 6,000 ₹1,65,00,000 |
| 1.08 | Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos | 2,750 | Nos | 600 ₹16,50,000 | 300 ₹8,25,000 Lowest | 6,000 ₹1,65,00,000 |
| 1.09 | Safety Net all around Scaffolding (between Submarine and Scaffolding/ staging). Safety net will be provided by Contractor. | 1,700 | Sqm | 360 ₹6,12,000 Lowest | 800 ₹13,60,000 | 6,000 ₹1,02,00,000 |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
4 Jul 2024, 11:00 amClosed
THE ADMIRAL SUPERINTENDENT
NAVAL SHIP REPAIR YARD NAVAL BASE KARWAR 581308
RATE CONTRACT FOR ERECTION AND REMOVAL OF PIPE SCAFFOLDING AND CANTILEVERS ONBOARD IN SHIPS SUBMARINES AND YARD CRAFTS AT NSRY(KAR) FOR A PERIOD OF THREE YEARS
2024_NAVY_659431_1
ROT-0132-RC-ERPSC
Open Tender
Marine Services
Item Rate
1095 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KARWAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.7 L
Yes
OUTFITTING DEPARTMENT
30 Aug 2024
14 Jun 2024
5 Jul 2024
14 Jun 2024
4 Jul 2024
15 Jun 2024
24 Jun 2024
Amount
IN Ships and Yard Crafts:- Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
IN Submarines:- Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 1 to 6 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Erection of Pipe Scaffolding & cantilevers, working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Removal/Dismantle of Pipe Scaffolding & cantilevers working platform with metallic gratings, Accessories at the height up to 7 to 12 mtrs (includes all accessories) for IN Ships and Yard Crafts. (Steel Stage will be on volume basis i.e LxBx H. Length, breadth & height will be considered in multiple of 2mtr, 1.25mtr & 3mtr. Therefor the least count will be 2 x 1.25x 3=7.5 cum will be 01 unit value =01 Nos
Safety Net all around Scaffolding (between Submarine and Scaffolding/ staging). Safety net will be provided by Contractor.
M/S NIRAKAR ENGINEERING (BID ID -3048079)
shine industries (BID ID -3048786)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .