| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹73.2 L+₹5.0 L (7.30%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹79.9 L+₹11.7 L (17.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹81.0 L+₹12.7 L (18.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹85.9 L+₹17.6 L (25.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PEERZADA SAYED NISAR HUSSAIN SHAH L9 | M/s Gandotra Const Company L7 | Pardeep Singh L6 | NOOR AHMED L1 | Ajaz Ahmed L11 | VINOD KUMAR CONTRACTOR L10 | Mohd Ayoub Khan L4 | MS NAZIR HUSSAIN L2 | ZAFFAR AHMED L8 | ABDUL REHMAN BHAT L12 | Mohd shafi L5 | Bopinder Singh L3 | HWM Infratech L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in all kinds of soil including rock and disposal of surplus, excavated earth at dumping sites to be purchased by the contractor of his own and approved by the engineer - in-charge at site for safe disposal of same without damaging private/ public property and all required leads/lifts and carriage. (Complete job) | 1,500 | cum | 20 ₹30,000 Lowest | 240 ₹3,60,000 | 250 ₹3,75,000 | 98 ₹1,47,000 | 149 ₹2,23,500 | 133 ₹1,99,500 | 145 ₹2,17,500 | 115 ₹1,72,500 | 120 ₹1,80,000 | 150 ₹2,25,000 | 350 ₹5,25,000 | 220 ₹3,30,000 | 200 ₹3,00,000 |
| 2.00 | Earthwork in rough excavation, banking excavated earth (all kind of soil) in layers not exceeding 20 cm in depth, breaking clods watering , rolling each layer with half tone roller or wooden or steel rammers, and rolling every third and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions including all leads/lifts & carriage. (Complete job) | 1,875 | cum | 650 ₹12,18,750 | 240 ₹4,50,000 | 150 ₹2,81,250 | 199 ₹3,73,125 | 150 ₹2,81,250 | 183 ₹3,43,125 | 180 ₹3,37,500 | 180 ₹3,37,500 | 80 ₹1,50,000 Lowest | 200 ₹3,75,000 | 150 ₹2,81,250 | 370 ₹6,93,750 | 130 ₹2,43,750 |
| 3.00 | Providing and laying in position Cement concrete of specified grade including the cost of centering and shuttering–all work upto
required level in 1:5:10 (1cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job) | 90 | cum | 10 ₹900 Lowest | 4,500 ₹4,05,000 | 3,000 ₹2,70,000 | 11 ₹990 | 500 ₹45,000 | 3,400 ₹3,06,000 | 3,100 ₹2,79,000 | 111 ₹9,990 | 4,000 ₹3,60,000 | 4,000 ₹3,60,000 | 3,400 ₹3,06,000 | 3,500 ₹3,15,000 | 3,000 ₹2,70,000 |
| 4.00 | Providing and laying in position Cement concrete of specified grade in foundations, retaining wall, return walls, pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces courses, parapets, bed block, anchor block etc including cost of centering and shuttering – all work upto required level in 1:3:6 (1cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job) | 46 | cum | 7,000 ₹3,22,000 | 5,600 ₹2,57,600 | 4,500 ₹2,07,000 | 5,999 ₹2,75,954 | 6,500 ₹2,99,000 | 5,150 ₹2,36,900 | 5,000 ₹2,30,000 | 6,200 ₹2,85,200 | 3,500 ₹1,61,000 Lowest | 6,000 ₹2,76,000 | 8,600 ₹3,95,600 | 4,200 ₹1,93,200 | 5,200 ₹2,39,200 |
| 5.00 | Providing and laying in position Cement concrete of specified grade in foundations, retaining wall, return walls, pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces courses, parapets, bed block, anchor block etc including cost of centering and shuttering – all work upto required level in 1:3:6 (1cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 30 % plum using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job) | 312.5 | cum | 5,100 ₹15,93,750 | 4,200 ₹13,12,500 | 4,500 ₹14,06,250 | 3,999 ₹12,49,687.5 Lowest | 5,000 ₹15,62,500 | 4,400 ₹13,75,000 | 4,000 ₹12,50,000 | 4,200 ₹13,12,500 | 5,000 ₹15,62,500 | 5,500 ₹17,18,750 | 6,300 ₹19,68,750 | 4,000 ₹12,50,000 | 4,250 ₹13,28,125 |
| 6.00 | Dry random Rubble masonry with hard stone in foundation and plinths using nallah stone without bond stones including all leads/lifts, carriages, handling and re-handling (Complete job) | 835 | cum | 2,000 ₹16,70,000 | 2,000 ₹16,70,000 | 1,800 ₹15,03,000 | 1,799 ₹15,02,165 | 3,000 ₹25,05,000 | 1,890 ₹15,78,150 | 1,400 ₹11,69,000 Lowest | 1,900 ₹15,86,500 | 1,900 ₹15,86,500 | 2,800 ₹23,38,000 | 1,900 ₹15,86,500 | 1,500 ₹12,52,500 | 2,900 ₹24,21,500 |
| 7.00 | Stone filling hand packed including supply of stones behind abutment, approach walls and wing walls including all leads/lifts, carriages, handling and re-handling (Complete job) | 370 | cum | 500 ₹1,85,000 | 500 ₹1,85,000 | 400 ₹1,48,000 | 499 ₹1,84,630 | 500 ₹1,85,000 | 433 ₹1,60,210 | 150 ₹55,500 Lowest | 650 ₹2,40,500 | 500 ₹1,85,000 | 300 ₹1,11,000 | 400 ₹1,48,000 | 1,000 ₹3,70,000 | 1,400 ₹5,18,000 |
| 8.00 | Random Rabble masonry with nallah stones in foundation and plinth including, leveling up with cement concrete (1:6:12) 1 cement : 6 coarse sand :12 graded stone aggregate 20mm nominal size at plinth level in cement mortar 1:6. and pointing on stone work with cement mortar(1:3) mix as directed by engineer- in-charge at site including all leads/lifts, carriages, handling and re-handling (Complete job) | 840 | cum | 3,400 ₹28,56,000 | 3,600 ₹30,24,000 | 3,400 ₹28,56,000 | 11 ₹9,240 Lowest | 4,500 ₹37,80,000 | 4,300 ₹36,12,000 | 2,626 ₹22,05,840 | 111 ₹93,240 | 2,800 ₹23,52,000 | 4,100 ₹34,44,000 | 3,700 ₹31,08,000 | 2,200 ₹18,48,000 | 4,400 ₹36,96,000 |
| 9.00 | Filling available excavated earth excluding rock in trenches, plinth, sides of foundation etc .Layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including all leads/lifts, carriages, handling and re-handling
(Complete job) | 300 | cum | 345 ₹1,03,500 | 200 ₹60,000 | 200 ₹60,000 | 149 ₹44,700 Lowest | 300 ₹90,000 | 333 ₹99,900 | 200 ₹60,000 | 150 ₹45,000 | 150 ₹45,000 | 250 ₹75,000 | 450 ₹1,35,000 | 400 ₹1,20,000 | 150 ₹45,000 |
| 10.00 | Hand-packing stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120 mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 2.2 mm crates including supply of stones, cost of zinc coated gabions crates and all leads/lifts, carriages, handling and re-handling (Complete job) | 1,350 | cum | 1,200 ₹16,20,000 | 1,175 ₹15,86,250 | 1,300 ₹17,55,000 | 2,250 ₹30,37,500 | 2,500 ₹33,75,000 | 2,200 ₹29,70,000 | 1,700 ₹22,95,000 | 2,400 ₹32,40,000 | 2,200 ₹29,70,000 | 3,000 ₹40,50,000 | 100 ₹1,35,000 Lowest | 1,200 ₹16,20,000 | 2,900 ₹39,15,000 |
Tender Value
₹1.3 Cr
Closing Date
24 May 2021, 4:00 pmClosed
Execuitve Engineer
PWD(RnB) Division Rajouri
Protection work in Govt. Medical college at Mera Rajouri Allied works
2021_PWDJK_123739_1
NIT No 04 of 2021-22 Dated 03-05-2021
Open Tender
Civil Works
Item Rate
60 days
Rajouri
Plz refer NIT
3 documents required · 3 mandatory
₹6,000
Executive ENgineer
Exempted
28 May 2021
4 May 2021
25 May 2021
4 May 2021
24 May 2021
4 May 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in all kinds of soil including rock and disposal of surplus, excavated earth at dumping sites to be purchased by the contractor of his own and approved by the engineer - in-charge at site for safe disposal of same without damaging private/ public property and all required leads/lifts and carriage. (Complete job)
Earthwork in rough excavation, banking excavated earth (all kind of soil) in layers not exceeding 20 cm in depth, breaking clods watering , rolling each layer with half tone roller or wooden or steel rammers, and rolling every third and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions including all leads/lifts & carriage. (Complete job)
Providing and laying in position Cement concrete of specified grade including the cost of centering and shuttering–all work upto required level in 1:5:10 (1cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job)
Providing and laying in position Cement concrete of specified grade in foundations, retaining wall, return walls, pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces courses, parapets, bed block, anchor block etc including cost of centering and shuttering – all work upto required level in 1:3:6 (1cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job)
Providing and laying in position Cement concrete of specified grade in foundations, retaining wall, return walls, pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces courses, parapets, bed block, anchor block etc including cost of centering and shuttering – all work upto required level in 1:3:6 (1cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 30 % plum using crushed stone aggregate including curing, all leads/lifts & carriages. (Complete job)
Dry random Rubble masonry with hard stone in foundation and plinths using nallah stone without bond stones including all leads/lifts, carriages, handling and re-handling (Complete job)
Stone filling hand packed including supply of stones behind abutment, approach walls and wing walls including all leads/lifts, carriages, handling and re-handling (Complete job)
Random Rabble masonry with nallah stones in foundation and plinth including, leveling up with cement concrete (1:6:12) 1 cement : 6 coarse sand :12 graded stone aggregate 20mm nominal size at plinth level in cement mortar 1:6. and pointing on stone work with cement mortar(1:3) mix as directed by engineer- in-charge at site including all leads/lifts, carriages, handling and re-handling (Complete job)
Filling available excavated earth excluding rock in trenches, plinth, sides of foundation etc .Layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including all leads/lifts, carriages, handling and re-handling (Complete job)
Hand-packing stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120 mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 2.2 mm crates including supply of stones, cost of zinc coated gabions crates and all leads/lifts, carriages, handling and re-handling (Complete job)
MS NAZIR HUSSAIN
Bopinder Singh
Mohd Ayoub Khan
Mohd shafi
Pardeep Singh
M/s Gandotra Const Company
ZAFFAR AHMED
PEERZADA SAYED NISAR HUSSAIN SHAH
VINOD KUMAR CONTRACTOR
Ajaz Ahmed
ABDUL REHMAN BHAT
HWM Infratech
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_240888.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .