| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | -5.19% | ₹2.5 Cr | L1 | Admitted-Finance |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
19 Dec 2022, 4:00 pmClosed
Sr. Regional Manager
RIICO, Bhiwadi Unit-II, Rest House Road, RIICO Chowk, Bhiwadi, Distt. Alwar (Rajasthan)
Construction of RCC CWR and OHSR and Demolition of existing CWR and OHSR at I/A Khushkhera
2022_RIICO_307629_1
2022-2023/33
Open Tender
Civil Works
Percentage
270 days
I/A Khushkhera
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
RIICO Ltd
₹5.3 L
RIICO Ltd Bhiwadi-II
5 Jan 2023
28 Nov 2022
22 Dec 2022
28 Nov 2022
19 Dec 2022
28 Nov 2022
6 Dec 2022
Amount
Dismantling/Demolishing of partially Underground CWR of capacity 1800 KL using barricading,scaffolding etc whenever necessary.The contractor will have to deposit pipes and sluice valves etc in RIICO store to store in- charge in good condition before breaking off structure. However the broken cement concrete and reinforcement of demolished structure shall be property of contractor.He has to dispose off these serviceable/un serviceable material away from industrial area or in dumping yard and fill the CWR with sand/earth work available at site.The site shall have to be leveled and cleared after demolishing complete in all respect.The reinforcement taken out after dismantling will also be property of contractor.Rate to be quoted by agency as complete job.Contractor should take all safety measures as per site requirement at the time of dismantling of CWR.The whole safety measures should be on the part of Contractor.Department shall not be liable for this.Work is to be done as per instructions given by Engineer-In-Charge.
Dismantling/Demolishing of elevated service reservoir situated of capacity 900KL using barricading,scaffolding etc whenever necessary.The contractor will have to deposit pipes and sluice valves etc in RIICO store to store in- charge in good condition before breaking off structure. However the broken cement concrete and reinforcement of demolished structure shall be property of contractor.He has to dispose off these serviceable/un serviceable material away from industrial area or in dumping yard.The site shall have to be leveled and cleared after demolishing complete in all respect.The reinforcement taken out after dismantling will also be property of contractor.Rate to be quoted by agency as complete job.Contractor should take all safety measures as per site requirement at the time of dismantling of SR.The whole safety measures should be on the part of Contractor.Department shall not be liable for this.Work is to be done as per instructions given by Engineer-In-Charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderReportEditor.pdf
Tender Documents • 0.96 MB
tandc.pdf
Additional Documents • 0.30 MB
BOQ_545298.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .