Tender Value
₹1.8 L
EMD Value
₹3,530
Closing Date
2 Sept 2026, 6:00 pm4d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_322473_17
88 REW Samba of 2026-27 Dated-27-08-2026
Open Tender
Civil Works
Percentage
30 days
Sumb
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹3,530
28 Aug 2026
28 Aug 2026
3 Sept 2026
28 Aug 2026
2 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth and disposal of surplus excavated earth as directed by engineer incharge | 5.21 | cum | 479.3 | ₹2,497.15 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded crushed stone aggregate 40mm nominal size | 1.58 | cum | 4,826.5 | ₹7,616.22 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size a) concrete 80% | 3.77 | cum | 5,733.6 | ₹21,615.67 |
| 4 | b) 20% boulder | 0.94 | cum | 700 | ₹660.8 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.69 | cum | 9,821.86 | ₹16,598.94 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand and extra above plinth level to floor five to superstructure | 5.61 | cum | 9,333.05 | ₹52,358.41 |
| 7 | 15mm cement plaster of mix 1:4 ( 1 cement :4 fine sand) | 21.37 | sqm | 327.85 | ₹7,006.15 |
| 8 | 12mm Cement plaster of mix:. 1 : 4 ( 1 cement : 4 fine sand) | 33.82 | sqm | 283 | ₹9,571.06 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 126.75 | kg | 123.2 | ₹15,615.6 |
| 10 | formwork a) plinth | 23.51 | sqm | 286.35 | ₹6,732.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_1082984.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].