| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-Finance | ₹2.9 Cr | L1 | Accepted-Finance RESPONSIVE |
| 2 | L2₹2.9 Cr+₹4.3 L (1.47%)Rejected-Finance PANGARIA BHWAN TALLI CHANDMARI LOHAGHAT CHAMPAWAT UTTARAKHAND | CHAMPAWAT | UTTARAKHAND | 262309 | ₹2.9 Cr+₹4.3 L (1.47%) | L2 | Rejected-Finance NON RESPONSIVE |
| 3 | L3₹3.0 Cr+₹10.0 L (3.45%)Rejected-Finance MADLI POST CHAMPAWAT DISTT CHAMPAWAT UK | CHAMPAWAT | UTTARAKHAND | 262309 | ₹3.0 Cr+₹10.0 L (3.45%) | L3 | Rejected-Finance NON RESPONSIVE |
| 4 | L4₹3.2 Cr+₹24.4 L (8.39%)Rejected-Finance HATHRANGIYA LOHAGHAT CHAMPAWAT UTTARAKHAND | ₹3.2 Cr+₹24.4 L (8.39%) | L4 | Rejected-Finance NON RESPONSIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹3.6 Cr
EMD Value
₹7.1 L
Closing Date
23 May 2020, 1:00 pmClosed
Zonal Manager
NPCC Ltd,98-Nehru Colony, Near HDFC Bank
L041- Dhon road to Badoli, Stage-II
2020_CCUK_89817_1
UT0455
National Competitive Bid
Civil Works - Roads
Item Rate
450 days
Champawat
Please refer Technical Bid
4 documents required · 4 mandatory
₹5,000
NPCC Ltd
₹7.1 L
Yes
Dehradun
18 Jun 2020
15 Feb 2020
23 May 2020
15 Feb 2020
23 May 2020
17 Feb 2020
4 Mar 2020
Amount
Protection work.
Excavation in excavation foundation for cross drainage structure, retaining walls, brest walls & other similar structure in all types of soils and rocks as met as site with all leads lifts and disposal of surplus earth as directed by engineer-in-charge including supply of all material labour, T & P etc. required for proper completion of work in accordance with the MoRD as per Technical Specification Clause 305.1 & 300
For R/W & B/W
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 & 1203 of MoRD Specification
For R/W & B/W
Random rubble masonary laid dry in breast wall, retaining wall, parapets, scupper etc .Including supply of all materials, labour, T& P royality etc, complete as per direction of Engineer in charge (As per PWD Uttarakhand specification.)
For R/W & B/W
HP stone filling in back of walls including cost of all materials, royality, T&P etc. complete as per direction of Engineer in charge (As per PWD Uttarakhand specification.)
Parapet with base as per attached drawing
Excavation for Structures:- Earthwork in excavation for structure as per drawing and technical specification Clause 305.1 including setting out, construction of shorting and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable material upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as drawings and technical specificationClause 803,1202 & 1203 P.C.C grade M 10 check walls
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 & 1203 of MoRD Specification
Pointing with cement mortar (1:3) on brickwork as per drawing and technical
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing concrete for plain/reinforced concrete in substructure complete as drawings and technical specificationClause 802,804, 805, 806, 807, 1202 & 1204(For height upto 5 m ) P.C.C grade M 20 Nominal Mix 1:2:4 (Hand mixed)
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specification Clause 1915
Providing edge stone on valley side of formation as per drawing including supply of all materials, labour, T & P etc required for proper completion of the work as per MoRD Specification and as directed Engineer-in- charge
SIDE DRAIN
Construction of K C type Pucca drains as per drawing including supply of all material, labour T & P etc. required for proper completion of the work as directed by Engineer-in- charge MoRD Specification Clause 1606
Excavation for Structures:- Earthwork in excavation for structure as per drawing and technical specification Clause 305.1 including setting out, construction of shorting and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable material upto 3 m depth
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 & 1204 in cement mortar (1:5) of MoRD Specification
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Maintence of Drains The maintenance of drains include erosion, repair, clearing, cleaning,,reshaping,regarding, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Hume Pipe
Excavation for Structures:- Earthwork in excavation for structure as per drawing and technical specification Clause 305.1 including setting out, construction of shorting and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable material upto 3 m depth
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 & 1204 in cement mortar (1:5)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification Clause 802, 803, 1202 & 1203 Nominal Mix 1:3:6
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation , protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 (1000 mm dia)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular material)
Filling in foundation trenches as per drawing and technical specification Clause 305.3.9(Earth filling (For marhy soil))
For Catchpit
Excavation for Structures:- Earthwork in excavation for structure as per drawing and technical specification Clause 305.1 including setting out, construction of shorting and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable material upto 3 m depth
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 & 1204 in cement mortar (1:5) of MoRD Specification
Random rubble masonary laid dry in breast wall, retaining wall, parapets, scupper etc .Including supply of all materials, labour, T& P royality etc, complete as per direction of Engineer in charge (As per PWD Uttarakhand specification.)
Construction of Causeway
Construction of Causeway with plain cement concerte 1:3:6, CC 1:1.5:3 including supply and fixing of M S steel reinforcement and required excavation etc. completed all respect as per drawing approved by CE Level -1 PWD Uttarakhand
Providing concrete for plain/reinforced concrete in open foundations complete as drawings and technical specificationClause 802, 803,1202 & 1203 Nominal Mix 1:3:6
Providing concrete for plain/reinforced concrete in open foundations complete as drawings and technical specificationClause 802, 803,1202 & 1203 (P.C.C M 25)
Supplying, fitting , and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
SUBGRADE PREPARATION WORK
Repairs of damages caused by rains/spillage of water Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade , profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines. grades and cross-section, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (For making super elevation)
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadways cuttings and excavation from drain and foundation of other structures graded and compacted to meet requirments of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Sub Grade Preparation for Pattri fillings)
Construction of coolie walling including supply of all material, labour, T & P etc. tequired for proper completion of the work as per direction of Engineering- charge (As per PWD Uttarakhand specification
PAVEMENT WORK
Granular sub base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub- base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density compacted as per clause 401.4 as per Technical Specification Clause 408 (Using Gravel Mix soil)
WBM Grading 2 Providing ,laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 (By Mechanical Means)
WBM Grading 3 Providing ,laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (By Mechanical Means)
Low porosity: Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (Rapid setting RS-I Grade complying with IS 8887) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of cold mixed open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade Catonic Bitumen Emulsion (Medium Setting MS Grade complying with IS 8887) to required line, grade and levelto serve as wearing cousre on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Specification clause 506.2
Providing and laying seal coat by Bituminous Emulsion (SS-2) as binder for sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type B as per Technical Specification Clause 508
ROAD FURNITURE
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road of the road as per attached standard drawing duly painted and written as per the MoRD specification and direction given by Engineer in charge Clause 1701 and Annexure 1700.1
Providing & fixing of PMGSY logo Board at starting point,end point and every 2 Km distance of road length as per attached standard drawing duly painted and written as per MORD specification and direction by Engineer in charge. Technical Specification Clause 1701 and Annexure 1700.1
Providing & fixing of Maintenance board with PMGSY Logo at starting as per attached standard drawing dully painted and written as per the MoRD specification and direction of Engineer-in-charge
ENVIRONMENT PROTECTION WORK
Detail of Providing & Fixing Empty Maxphalt Drum Bio Engineering
Seeding and Mulching Preparation of seed bed on previously laid top soil. Furnishing and placing of seeds, fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per sqm and laying and fixing jute netting, including watering for 3 months all as per Technical Specification Clause 310.
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification 1301
Maintenance Activities: Emergency Maintenance Activities (For Opening Communication) Deploying Hydraulic Excavators of 0.90 Cum Bucket for clearance of major slip in all type of soil, rock and boulders including its operator, fuel, all other charge and taxes required for proper completion of work.
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90 ( For Opening Communication Only )
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Providing and Laying of Boulder apron laid in wire crates with 4 mm dia G.I wire conforming to IS : 280 & IS:4826 in 100 mm x 100 mm mesh ( woven diaonally ) including 10 % extra for laps and joints laid with stone boulders weighing not less than 25 Kg each As Per drawing and Technical Specifications clause 1301
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Major Slip Clearance in all type of soil, Rock and Boulders including cost of all material, machine, T & P and Taxes etc required for proper completion of work as per MORD specification, clause 1611
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
mrs panch ghaticonstruction
GANGA PRASAD PUNETHA
M/S DALIP SINGH ADHIKARI
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .