Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
12 Oct 2026, 6:30 pm4d left
EXECUTIVE ENGINEER
TENDER FOR ERECTION OF HT, LT AND TC UNDER ALL SCHEME AS PER ATTACHED SCHEDULE AND REQUIREMENT UNDER DHARI-1 SUB DIVISION.(HVDS,ND,ZP,SPA,SCP, SKJY, Etc. SCHEME).
350192
210/AMCO-11/2026/16
Open
Electrical Works
Works
Amreli
14 documents required · 8 mandatory · 6 optional
₹1,475
PGVCL, AMRELI DIVISION-2
₹30,000
1 Oct 2026
1 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
2 Estimated cost in Rs.
3 Tender Fee in Rs. ( non-
refundable) with 18 % GST (Rs. 1250 + 18% GST) (By RTGS/NEFT/ONLINE Only)
Earnest Money Deposit 30,000.00/-
4 amount in Rs. (Payment through NEFT/ RTGS/ONLINE Only)
(1 % of Tender Amount)
Bid Document 01.10.2026
Downloading Start Date
6 On line ( E - tendering ) 12.10.2026 up to 18:00 hours only
tender offer submission
9 Date of opening of On Line 13.10.2026 @ 11:00 hours (if possible)
fee , EMD cover of bid at
10 Date of opening of On 13.10.2026 @ 11:10 hours (if possible)
Line/Off Line Technical
11 Date of on line opening of 13.10.2026 @ 12:00 hours (if possible)
On Line /Off Line Price bid,
12 Validity of Bid 120 days
Tender Papers & Specifications may be down-loaded from website
https://pgvcl.nprocure.com (For view, download and online
submission) and PGVCL website www.pgvcl.com (For view, download
only). Tender fee and EMD fee must be paid by
RTGS/NEFT/ONLINE and acknowledgement should be attached
along with submission of respective tender. PGVCL Amreli-2 A/C
No. 00000030617860769, IFS Code: SBIN0060030. All the relevant
documents of tender to be attached online. If any tender is received
physically it will not be considered and the tender of the bidder will be
disqualified. PRICE BIDS WITH ALL DOCUMENTS TO BE
SUBMITTED ON-LINE ONLY.
Executive Engineer
PGVCL, Division Office, AMRELI-2
CHECK LIST OF DOCUMENT ATTACHED
SR DOCUMENT NAME VALIDITY / ATTACHED
(FILL BY BIDDER)
1 TENDER FEE EMD RECEIPT
2 VENDOR REGISTRATION VENDOR REGISTRATION NO:___________________
3 LETEST GST CHALLAN
4 LETEST PF CHALLAN
5 GROUP INSURANCE POLICY VALIDITY FROM:___________ TO ___________
6 20% BANK SOLVANCY VALIDITY FROM:___________ TO ___________
7 300 RS NOTARIEZ STAMP PAPER
BAHEDHARI FOR COURT CASE
8 PARTNERSHIP DEED (IF APPLICABLE)
9 TENDER SIGNED COPY WITH FILLED
DETAILS OF ALL ANNEXURES
10 ELECTRIC CONTRACTOR LIACANCE
11. FILLED DETAILS OF ALL
Annexure – I TO Annexure-XI
12 TABLE -2 & CERTIFICATE -A
14 Work Completion certificate (by Order
Issuing Authority only) with copies of
Work Orders for the similar works
NOTE: FILL ABOVE DETAILS AND SEND WITH TECHNICAL BID OF TENDER. TICK RIGHT
MARK WHICH DOCUMENT ATTACHED BY BIDDER
Sign & Stamp of the Bidder
Sr. No. Particulars Page No.
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
4 General Instructions to the successful
TERMS & CONDITIONS REGARDING
5 INDUSTRIAL LAWS AND OTHER RELATED
6 SECTION V: TAXES
SECTION VI: General Terms &
Annexures I to XI, BG Formats for EMD and,
SD, Agreement and Indemnity Bond
9 SECTION VIII Schedule B
10 SECTION IX Technical Specifications
11 NEW Amended Conditions
12 SECTION X Drawings
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Executive Engineer Amreli-2 Division, PASCHIM GUJARAT
VIJ COMPANY LTD., having its corporate office at Nanamava Main Road, Laxminagar,
Rajkot. With expression shall unless repugnant to the context include its permitted
assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been
accepted by the PGVCL for award of the contract and shall include his authorized
representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as
Engineer-in-Charge to supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with
Performa, schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the bidder
that his tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions,
schedules, drawings and any other conditions specifically agreed between the parties
forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement
as per order placed by the PGVCL and calculated from the quantities indicated in the
1.9 The "Completion Period" shall mean the period starting from the date of issue of
"Order" and required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to
inspect the works under the contract and/or duly authorized representative of the
PGVCL “Letter of Award” shall mean the official notice issued by the PGVCL notifying
the contractor that his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been
1.13 “Month” shall mean the calendar month day or days unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
1.16 Electricity Rules: - All the works shall be carried out in accordance with latest rules
under Electricity Act-
1.17 Testing: - After completion of work execution required Tests are to be taken in
presence of Engineer in Charge whenever required.
1.18 Definition of “Similar work” for overhead network: Erection of overhead
electric Network up to voltage level 22 KV
Sign & Stamp of the Bidder
1.19 Definition of “Similar work” for underground network: Laying of HT / LT
Underground Power cable network for Distribution system.
2 PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1.1 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and
having experience of erection & maintenance of overhead HT/LT lines,
Transformers, underground cable work, along with satisfactory work completion
certificate regarding execution of work, including work order outward number
along with its value, from order issuing authority, for last 3 (three Years) _
ending last day of month previous to the one in which tenders are invited., of
any DISCOM of GUVNL or any Govt. / Private DISCOM of any state of India. The
work executed through open / advertised tender shall only be considered for
experience of work. The work done through limited tender shall not be
considered for experience.
These bidders will be considered as an experience bidder.
2.1.2 Bidders fulfilling eligibility criteria as mentioned in section 1 Clause No.2 and
sub clause No. 2.2 and not possessing any experience of erection &
maintenance of overhead HT/LT lines, Transformers, underground cable work
can also participate in tender for erection & maintenance of overhead HT/LT
lines, Transformers, underground cable work. These bidders will be
considered as an NEW bidder.
2.2 Following documents are mandatory for the Bidders.
Work Completion certificate (by Order Issuing Authority only) with copies of
Work Orders for the similar works executed.
Memorandum of Association or partnership deed.
Document showing P.F. Number obtained by the bidder.
Power of attorney if any for signing the bid documents.
Latest solvency certificate issued by Nationalized or scheduled bank for a sum
of Minimum 20% of Tender cost
Registration Number under Shop and Estt. Act (If as case may be applicable)
PF Code Number allotted by concerned PF Authority
Labour License (If as case may be applicable)
Registration under ESIC (If as case may be applicable)
Type test certificates for Cable Box, Straight through Joints (In Case of UG Work
E. P. F. Registration in the name of bidder.
GST Registration Certificate in the name of bidder
PAN card in the name of bidder
Valid Labour Insurance Policy in the name of bidder
Latest bank solvency certificate from any Nationalized/Scheduled bank
Adhar Card (Optional) (In case of Bidding is done on Individual name)
Sign & Stamp of the Bidder
3 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS
3.1 Bidders willing to participate in tender will have to get themselves registered on
website www.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate /
Digital Signature as per Information technology Act 2000 using which they can sign
their electronic bids. Bidders can also procure the same from (n) code solutions,
a division of GNFC Ltd., who are licensed certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in the
tender document.
3.3 For details regarding digital certificate and related training the below mentioned
address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev,
3.4 Bidders who already possess valid Digital certificate need not procure a new
digital certificate.
3.5 Bidders can prepare and edit their offers number of times before tender
submission date and time as mentioned in this tender details table no1. After
tender submission date and time, bidder cannot edit their offer submitted in any
case. No written or online request in this regard shall be granted.
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic
format on website www.nprocure.com before the validity period mentioned in
tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers only in physical form will not be accepted in any case.
4 UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND
4.1 All interested parties are requested to understand this Tender Document in
detail in order to comply with PGVCL’s requirements including but not limited
to the Tender fees, EMD and deadlines, selection criteria, selection
methodology, scope of work, and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and documents and
fully inform himself as to all the conditions and matters which may in any way
affect the Work or the cost thereof. If any Bidder finds discrepancies or
omissions in the specifications and documents or is in doubt as to the true
meaning of any part, he shall at once request in writing in advance before
filling in the tender, within the time limit as per Table no 1, for an
interpretation / clarification by the PGVCL Amreli-2 Division office & Amreli
Sign & Stamp of the Bidder
Then The PGVCL Amreli-2 Division office or Amreli Circle Office will issue
interpretation and clarifications as he may think fit of such interpretations and
clarifications, the Bidder may submit his bid but within the time and date as
specified in the Table no1. All such interpretations and clarifications shall form
a part of the specifications and documents, and accompany the bidder's
proposal. In case of difference of opinion about interpretation of specification
etc. the decision of Superintending/Executive Engineer, Amreli-2 Division will
be final and shall be binding to the contractor.
4.3 Verbal clarifications and information given by the PGVCL or his employee(s) or
his representative(s) shall not in any way be binding on the PGVCL.
4.4 All interested parties requested to strictly abide by all terms prescribed in this
RFP Document and provide accurate information to the best of their knowledge
without misleading PGVCL to be considered for participation in this Project.
4.5 Bidders should be in touch with websites https://pgvcl.nprocure.com
&www.pgvcl.com for information regarding revision / corrigendum /
Amendment in the Tender Document till due date of online / off line
submission and thereafter. No separate information shall be sent in this
regards and also not publish in newspaper.
5 TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in
force during this Tender Period.
5.1 The Tender fees is payable, as per following Table, between the dates mentioned
in Table no 1 , by cash & DD or Banker’s Cheque if total amount of Tender fees
in Table no 1 , by cash & DD or Banker’s Cheque if total amount of Tender fees
plus applicable GST is less than Rs 10,000/- or only by Demand Draft (DD), if the
said amount is more than Rs 10,000/, in favour of the Paschim Gujarat Vij
Company Limited payable at ___________ on any Nationalized /Scheduled banks
Tender Fees Present rate Total Tender
Sr. No. Tender Amount
in Rs. of GST Fee
Above Rs 5,00,000/-
5.2 The tender fees once paid for tender document will not be refunded under any
circumstances or not transferred to other bidder.
Sign & Stamp of the Bidder
5.3 The Tender Fees is Non-refundable under Normal Circumstances. However, if
purchaser Company decides to scrap/cancel the Tender, by one or another
reason, in which Bidders are not responsible for cancellation/scarp of Tender
fee without GST amount may be refunded to bidder(s), at sole discretion of the
Purchaser Company.
6 EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates mentioned in Table no 1, by cash if total amount
6.1 The EMD payable, between the dates mentioned in Table no 1, by cash if total amount
of EMD is less than Rs 10,000/- or by Demand Draft (DD) or Banker’s Cheque, if the
said amount is more than Rs 10,000/-, in favour of the Paschim Gujarat Vij Company
Limited payable at ___________ on any Nationalized /Scheduled banks or by Bank
guarantee from any Nationalized/Scheduled nationalized bank decided by
Government of Gujarat time to time only. The EMD Amount is 1 % of the Tender
Estimated Cost.
6.2 The money receipts of payment of Tender fees and EMD or DD or BG for tender fees
& EMD should be submitted in sealed cover & this cover shall be clearly marked
“Tender fees & EMD Cover for Tender no. __” along with the name and stamp of
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will be
returned after the award of the contract.
6.4 EMD of the successful bidder to whom a contract is awarded will be returned after
the said bidder pays the security deposit and signs the contract agreement.
6.5 If the successful bidder fails to submit a Security Deposit within 15 days from the
date of LOA of the contract or fails to sign the contract agreement then the EMD
amount will be forfeited in favour of PGVCL without any notice or and action for
“Stop deal” will be initiated as decided by tender inviting authority
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 EMD can be exempted as per Industries & Mines Department, GoG New Purchase
Policy Resolution No. SPO/1095/2636(97)/CH dated 23.09.1997 for Small and Micro
Scale Industries.
6.8 In cases, where EMD need not to be paid, valid exemption Certificates duly notarized
has to be produced/attached in place of EMD documents as per the Tender Terms
and Conditions.
6.9 The Micro and Small Scale Industrial (manufacturing) Units registered under Small
Scale Industries of Gujarat State and holding subsequent registration with
NSIC/DGS&D, Registration Certificates for the item under Tender will be eligible for
exemption from payment of EMD on submission of attested copies of their SSI (SSI/
MSME Part-II) & NSIC/DGS&D Registration Certificates and Udhyog Adhar
Certificate/Memorandum in EMD Cover. The Certificates should indicate the
manufacture/service/works of items/work offered. This benefit of exemption will
not be admissible if they take part in the tender indirectly either through their
dealers, agents, distributors or other intermediates.
6.10 Tenders submitted without Earnest Money Deposit by the firms, who are not eligible
for any exemption, will be rejected without entering in to further correspondence in
this regard and no reference will also be made.
Sign & Stamp of the Bidder
7 In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.1.1 Following documents are mandatory and to be in submitted through sealed
cover. This cover should be clearly marked “Technical & Commercial Bid Cover
for Tender no. __________” along with the name and stamp of bidder
1 Attested Copy of successful work Completion certificate, as mentioned on
page no 5 point no 2.11 of this document.
2 Attested copy of Memorandum of Association or partnership deed.
3 Attested copy of document showing P.F. Number obtained by the bidder.
4 Attested copy of power of attorney if any for signing the bid documents.
5 Attested copy of latest solvency certificate issued by Nationalized or
scheduled bank.
6 Attested Copy of registration Number under Shop and Estt. Act (If as case may
7 Copy of PF Code Number allotted by concerned PF Authority
8 Copy of Labour License (If as case may be applicable)
9 Copy of Registration under ESIC (If as case may be applicable)
10 All Annexures of this tender documents , duly signed by the bidder, in
chronological order only
11 Certificate – A
12 Copy of Tender Document duly signed and stamped on each page.
13 Type test certificates for Cable Box, Straight through Joints (In Case of UG
Work Involved).
14 The contractor shall have a separate provident fund code of RPFC and the
Contractor who do not possess separate P.F. Code shall not be considered for
acceptance of tender.
15 Contractor has to submit such certificate showing separate P.F. Code along
16 List of available safety gadgets, as per annexure XI, with the bidder.
17 Copy of documents mentioned in Section 1, Clause No. no 2.2 of this tender.
7.2 Commercial / Price Bid:
7.2.1 The bidder must clearly quote their rates in Schedule – B of this tender, in
percentage above than, below than or equal to, the tender rate in figure as
well as in words. The bidder should specify whether the quoted rates are with
or without prevailing taxes, if applicable, in force at that time, The bidder
must work out the total price of their tender offered accordingly and the total
amount should be clearly written in words & figure, in case of any discrepancy
whatever written in words shall prevail. Company shall at liberty to decide
the matter as it deem fit.
7.2.2 In case of non SOR rate, Item wise rate should be mentioned and item wise
rate will be consider for the lowest party.
Sign & Stamp of the Bidder
7.2.3 Further bidders, for “On line tenders”, are requested to submit price – bid
on-line only and not to submit the price bid in physical form. This is
mandatory. If price bid is submitted in physical form, same will not be opened
and only on-line submitted price bid will be considered for evaluation. In On
Line price Bid, GST is to be mentioned in separate raw/Column.
PGVCL reserves the right to reject any OR all tenders without assigning any reasons
8 In case of Off line Tenders
8.1 Technical Bid cover
8.1.1 All the documents as specified in Section I Sr. no. 7.1 are mandatory and to
be in submitted through sealed cover. This cover should be clearly marked
“Technical Bid Cover for Tender no. __________” along with the name and
stamp of bidder
8.2 Commercial / Price Bid cover:
8.2.1 All the documents as per Section 1 Sr. No. 8.2.2 & 8.2.3 are mandatory
and should be submitted in sealed cover. This cover shall be clearly
marked “Commercial Bid Cover for Tender no. ______” along with the
name and stamp of bidder
8.2.2 The bidder must clearly quote their rates in Schedule – B, attached with this
tender, in percentage above than, below than or equal to, the tender rate in
figure as well as in words. The bidder should specify whether the quoted rates
are with or without prevailing taxes, if applicable, in force at that time, The
bidder must work out the total price of their tender offered accordingly and
the total amount should be clearly written in words & figure, in case of any
the total amount should be clearly written in words & figure, in case of any
discrepancy whatever written in words shall prevail. Company shall at liberty
to decide the matter as it deem fit.
8.2.3 In case of non SOR rate, Item wise rate should be mentioned and item wise
rate will be consider for the lowest party.
8.2.4 No deviation in terms & condition in Schedule-B and Technical Specification
will be entertained. All the documents related to this Tender shall be final
and binding to all the bidders. Any ignorance for this shall not relieve the
contractor from their contractual liability arising as per Tender documents.
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for the
bidding. Hence bidders should ensure themselves of their credentials before
submitting their offer.
11. Superintending/Executive Engineer, PGVCL, _______________ Circle/Division
reserves the right to spread the order if required.
12. Does not anticipate change in the PGVCL ownership during the proposed period of
Sign & Stamp of the Bidder
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in
Table1, PGVCL may, for any reason, whether at its own initiative or in
response to a clarification requested by a respective bidder, modify the
bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & n-procure website
in case of on line tender, PGVCL will bear no responsibility or liability arising
out of noncompliance of the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and will
be given due consideration by the bidders while they submit their bids and
invariably enclose such documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for submission and
no any further communication in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their
tenders and the information called for is given in totality. A set of complete
tender documents is required to be submitted duly signed and stamped by
authority competent to sign on behalf of bidder on each page as a token of
unconditional acceptance to the conditions of various clauses of tender
documents. The bidder's bid and the documents attached there to shall be
considered for forming part of the contract documents.
14.2 For “On Line Tenders”
14.2.1 Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line submission)
and PGVCL web site www.pgvcl.com (For view & down load only).
14.2.2 The bidder has to follow instruction given in this section point no 4 to
Both these covers, as mentioned in this section point no 6.2, 7.11, should be
submitted in one main cover, this cover shall be clearly marked “EMD
Cover, Technical _Commercial bid covers for Tender no. __________”
along with the name of the Bidder and his address.
This main cover must be submitted physically, within time limit as mentioned
in table no 1 Sr. No. 8, by registered Post A.D. or Speed Post only
“NO COURIER SERVICE OR HAND DELIVERY” will be allowed, to following
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Amreli Division-2,
Address: 1 st floor, power house compound, chital road, Amreli.
Price bids to be submitted ON LINE only before time limit specified in
“Tender Details” Table no1 of this document.
Sign & Stamp of the Bidder
14.3 For “Off Line Tenders”
14.3.1 Tender Papers & Specifications may be down-loaded from PGVCL web site
www.pgvcl.com (For view & down load only).
14.3.2 The bidder has to follow instruction given in this section point no 4 to 8. All
these three covers, as mentioned in this section point no 6.2, 7.11, 8.2 ,should
be submitted in one main cover, this cover shall be clearly marked “EMD
Cover, Technical , Commercial bid covers for Tender no. __________”
along with the name of the Bidder and his address.
This main cover must be submitted physically, within time limit as
mentioned in table no1, by registered Post A.D. or Speed Post only,
“NO COURIER SERVICE OR HAND DELIVERY” will be allowed, to following
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Amreli Division-2,
Address: 1 st floor, power house compound, chital road, Amreli.
15. REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions,
schedules and other details called for in this specification and keep himself
fully informed about all which may, in any way, affect the work, or cost
thereof. The bidder should sign on each page of tender documents , as
mentioned in Section 1 point no. 2.15, failure to furnish the required
information or submission of tender not as per the specification will be at the
Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies
(PGVCL, UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under
criminal investigation for any kind of fraud for public and theft of material
or/and with handlings the material and any civil and/or criminal case pending
at any stage than offer of such bidder /firm will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set out
in the Table no1, shall be rejected.
15.5 Any deviation found in Data/Details/Documents between online offer (e-
tendering) and physically submitted documents of bidder, offer of the same
shall be liable for rejection at the discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or
manuscript in the bid shall be ignored and will not be considered authentic
unless same are signed with Bidder's Stamp/Seal as mentioned in Section
15.7 Conditional bids shall not be accepted.
Sign & Stamp of the Bidder
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no 1, in
any case which are received after due date and time of the receipt of
tender irrespective of delay due to postal services of any other reasons
and company shall not assume any responsibility for late receipt of tender.
Any correspondence in the matter will not be entertained.
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall
be accompanied by its translation in English. Failure to comply with this may
disqualify a bid. In the event of any discrepancy in meaning, the English language
copy of all documents shall govern.
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business of
the person or persons making the bid and must be signed and sealed by the
bidder with his usual signature. The name of all persons signing should also be
typed or printed below the signature.
17.2 Bids by corporation/ company must be signed with the legal name of the
corporation/ company by the President, Managing Director or by the Secretary
or other person or persons authorized to bid on behalf of such corporation/
company in the matter.
17.3 A bid by a person who affixes to his signature the word 'President', 'Managing
Director' 'Secretary', 'or other designation without disclosing his principal will
17.4 Satisfactory evidence of authority of the person signing on behalf of the Bidder
shall be furnished with the bid.
17.5 The Bidder's name stated on the tender shall be exact legal name of the firm.
17.6 Erasures or other changes in the bid documents shall be over the initials of the
person signing the bid.
17.7 The bidder should sign, as described above, on each page of tender documents
& then they have to submit this tender documents.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening
of the technical bid.
20. EVALUATION AND COMPARISION OF TENDERS
1. Generally the qualifying price bids, Bid price shall mean the bid price quoted by
each bidder in his bid for the complete scope of works including all duties and
Taxes, will be evaluated by the PGVCL to ascertain the best and lowest
evaluated bid in the interest of the PGVCL, for the complete works covered
under these specifications and documents.
Sign & Stamp of the Bidder
2. As per requirement of Company, Amt./Qty. of tender can split in more than
one bidder subject to price matching with lowest bid. In this matter during
splitting of tender Qty./Amt. in first stage proportionate part of tender
Qty./Amt. is to be allotted to L1 and L2,L3..etc. are invited for price
matching with L1. After completion of price matching process,
proportionate part of tender may issue to L2,L3….etc. Failing in this matter
rest proportionate part of tender Qty./Amt. may issue to L1 after receiving
performance from SDO
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will
prevail. If there is discrepancy between the unit price and the total price which is
obtained by multiplying the unit price and quantity, or between sub-total and the
total price, the unit or sub-total price shall prevail, and the total price shall be
corrected. In case of discrepancy between sub-total price obtained by adding
various prices in the schedule and the sub-total price indicated for that particular
schedule, the sub-total obtained by addition of various arithmetically corrected
prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the
prices arrived at from various schedules, identified for that purposes, in the bid
proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will be
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful
bidder by the PGVCL.
22.2 The contract will be awarded to the best qualified and responsive bidder
offering the lowest evaluated bid in conformity with requirements of these
specifications and documents and PGVCL shall be the sole judge in this
regard and subject to the provisions of these instructions to bidders and
other terms and conditions detailed out in these documents and
specifications. A responsive bid is one which accepts all terms and conditions
of these specifications and documents without any modifications.
22.3 PGVCL Reserves the right to award separate contract to two or more parties
in line with the terms and conditions specified in the specification.
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL Amreli-2 Division office may ask bidder
to submit required documents other than mentioned in section I Point no 2.2, if
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this
Tender consist ________ Days. The commencement date of Order shall be Date of
issue of the Order.
Sign & Stamp of the Bidder
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Postal Address
4 e-mail address & URL
Type of Company
Attach Proof of Company Registration
Proprietorship/ Partnership/ Private
5 along with a copy of the Partnership
Limited/ Public Limited
Deed/ Article of Association and
Memorandum of Understanding
Name and designation of the
representative of the Bidder to whom
all reference shall be made to
expedite technical co-ordination.
7 Office Address
Stores Address where materials issued
by PGVCL will be stored
Store Documents to be submitted
10 Office Telephone/Fax no.
11 Office e-mail address
12 Permanent Account Number(PAN),
15 Labour License No.
Insurance Policy No. and for nos. of Nos. of Labours Insured in this
Labours in the name of bidder policy_______
17 Solvency Certificate No.
18 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and
belief. If any information found to be concealed, suppressed or incorrect at later date, our
tender shall be liable to rejected and our company debarred from executing any business
Sign & Stamp of the Bidder
1.0 For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual Cable/Conductor
length. Cable length must be measured before laying. Cable joints are to be done as
per requirement only and length of cable must be utilized accordingly.
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads, sewers,
drains, pipes, cables, structures, places and things shall be reasonably secured against
risk of injury and shall be carried out to the satisfaction of the authorities concerned.
However, if any, damages to existing services made, Contractor shall arrange and pay
for any necessary repair, to make good the damages.
4. When the excavation of the trenches has been accurately executed, the contractor
shall inform engineer in-charge for approval. Lying of cables shall not be started until
engineer in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes having
_both sides smooth surfaces, 25.4 mm thick, 152.4 mm inner diameter, 1000 mm long
and well cured and good quality; Sand from river bed, HDPE Pipes, GI Pipes and sundries
material if any (As per Schedule B) are to be supplied by Bidder at his own Cost. All
such material must be approved from concerned Engineer-in-charge before utilization
and it must be ISI marked where ever applicable.
6. Cable laying work must be executed as per prescribed in Schedule B. sand filling in
Trench must be done as mentioned in Schedule B. Megger test of Cable must be taken
in presence of Engineer-in-charge before laying and Bidder has to maintain separate
Records duly signed by Engineer-in-Charge for each results. After laying the Cable in
trench it is to be covered with half round pipe of RCC as prescribed in Schedule B and
approved sample. Each Half round Pipe must be marked with “PGVCL” with solid Red
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay Cable
in the stretch on small pulleys kept in the Trench so that it can be prevented from any
scratches on Cable. Drum must be fixed on Drum Machine while stretching and to be
kept on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand.
Leveling with Road is to be done after complete sand filling. No any stones or any other
debris are to be utilized in filling of Trench. The contractor shall dispose of surplus
material at his own cost.
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also be
laid. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS GUJARATI)
as “CAUTION: 11000 VOLTS PGVCL CABLE” and to be placed at about 300 mm To
mm depth from ground level along the route of cable.
10. Trench route is to be made as per instructions of concerned Engineer-in-Charge and
then laying of cable in this trench accordingly.
Sign & Stamp of the Bidder
11. Cable Laying with Mechanical Boring across the Road without disturbing the asphalt is
to be done instructions of concerned Engineer-in-Charge with prior approval and work
is to be executed as per Specifications in Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type test
certificate not older than Seven years and as per relevant IS 13573:2011 with latest
amendment if any along with sample before installation of cable kit at concern Division
office. GTP is to be submitted with Technical Bid.
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must have
all the modernized equipment i.e. Erath Cracker JCB etc. to execute the required
Trench. Such area must be certified by a formation of Committee at Division Level
headed by Executive Engineer and to be executed in presence of Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per specifications in
Schedule B The marker should incorporate the following relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road
crossing, Cable Joints etc. of cable route as per requirement over and above specified
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost and Risk
after successful completion and Execution of work. Otherwise Recovery will be
proposed as per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing must
be carried out with help of Voltage Surge Testing Kit as per IE Act by applying 22 KV
for continuous Five Minutes and Cable must hold the satisfactory Results. Bidder must
have such testing facility. Following Pre commissioned Tests are also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of 10 KV DC
for one minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the
e) Continuity & Phase confirmation
17. During the Execution if any deficit found in allotted material OR in case of any theft
of PGVCL allotted material, then PGVCL will recover the cost of such material from
Bidder as per the prevailing Market Rates.
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the Bidder.
20. During Execution of work for Trench and Cable Laying authorized representative of
Bidder who is in knowledge of Engineer-in-Charge must remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility
necessary for the Tendered work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of any
dispute and holds the power to decide the final verdict.
Sign & Stamp of the Bidder
23. GST and cess as applicable as per prevailing rates are applicable to Bidder for this
24. In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network will be
provided as per availability or convenience of the PGVCL which shall be acceptable to
the contractor & contractor shall try to complete the work in minimum time.
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at Contractor’s
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and
PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
2.0 For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual Conductor
length. Conductor length must be measured before Stringing.
2. E/o Poles must be according to RE Standards. Pole Pit, stringing installation of
Fabrication must be done as per standards and esthetically.
3. Earthing of Poles and Transformers must be as per Drawings and RE Standards. The
Coal and Salt composition must be followed as per rules. The Earth Pit must be kept at
a distance mentioned in Standard form the Pole. Earth Pit must be as per Drawing.
4. Concreting of Poles/Guys are to be carried out as per site situation and as per
instructions of Engineer –In-Charge.
5. Construction of Transformer Structure must be as per standard with all required
accessories like LA, Box and Fuse etc.
6. Delta Type Three Earthing are compulsory for each Transformer Centre.
7. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
8. Wherever required, Guarding as per standard must be done.
9. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision officers
has to submit the proposal to the division office with all justification before
commencement of work. Committee of Executive Engineer, DE Tech of Division office
has to verify the submitted proposal and decide whether concreting is required or not.
After the approval of committee work of concreting should be process as per
specification attached herewith.
10. Bidder must have records of each work carried out with every material inventory and
account thereof issued to him.
11. Bidder must have the well-drawn sketch of each work and to be submitted with
Inventory sheet within 15 Days of work completion.
12. All the fabricated material and Girder Poles must be painted with Coats of
Silver Oxide and without this work, work completion will not be accepted.
13. Pole Numbering must be completed within week time as per Engineer-in-Charge
14. Bidder must have proper pole accounting for the work carried out by him. He must
have the location details from where the poles are lifted and where these poles are
utilized for each work. A separate Register is to be maintained by him and details are
required to be submitted with Inventory and Sketch submission.
Sign & Stamp of the Bidder
15. Necessary shutdown for connection/jumper of newly erected line with existing
network will be provided as per availability or convenience of the PGVCL which shall
be acceptable to the contractor & contractor shall try to complete the work in
16. Successful Bidder must have ensured for that the safety Gadgets are issued to his
Labour, by him, and required regulations of Safety will be followed while carrying out
the line erection work.
17. The Work for the erection of of Poles, Guys, Earthing, Transformer and Concreting,
Stringing and Guarding must be done as per attached Specifications and Drawings.
18. The material which is dismantled from site during the execution of work must be
credited to respective Divisional stores immediately after completion of work with
complete inventory and measurement details and length to weigh conversion
19. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be
initiated against the Contractor
20. In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
Sign & Stamp of the Bidder
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful
Bidders indicating the quantity allocated to them and the security deposit amount to be
deposited by them with PGVCL. Short listed Bidders will be required to deposit the
requisite security deposit within 15 days from issuance of LOI / LOA.
2. Security Deposit:
2.1 Security deposit will be accepted in Cash if the amount is less than Rs.
and, if the amount is more than Rs. 10000.00 then will be payable by Demand Draft
(DD) OR Banker’s Cheque OR Bank Guarantee (BG) from Nationalized / Scheduled
Banks as per Govt. GR No. EMD / 10 / 2014 / 570 / DMO dated 01.04.15 will be
acceptable. DD should be drawn on any Nationalized /Scheduled banks in favour
of Paschim Gujarat Vij Company Ltd. payable at Amreli or by Bank guarantee from
any Nationalized/Scheduled nationalized bank decided by Government of Gujarat
time to time only. Cheque will not be acceptable
2.2 The successful Bidders will be required to deposit the requisite security deposit
within 15 days from the date of issuance of LOA of an amount equivalent to 5 % of
the value of the work to be allotted to him and as mentioned in LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a clear one
time validity till the completion of awarded work of this work order. Bank
Guarantee for interim period will not be allowed. Security Deposit shall be suitably
extended time to time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then
supplier should undertake to renew the Bank Guarantee at least one month before
the expiry of the validity failing which PGVCL will be at liberty to encase the same.
CORPORATE GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful Bidders
will be required to deposit additional Security Deposit on prorate basis within two
weeks of the issuance of LOA for the additional order quantity.
2.7 In the event of failure to carry out work offered by successful Bidders and as
accepted by them while receiving the order within given time period, will lead to
forfeiture of the Security Deposit up to 100% and will lead to disqualification of the
bidder to transaction business with PGVCL for at least TWO years or the time
duration as may be decided by the Managing Director, PGVCL.
2.8 Security deposit will be returned on after completion of awarded work.
2.9 If the successful Bidders fails to pay security deposit within given time limit then
the letter of intent will stand cancelled. EMD amount will be forfeited in favour of
PGVCL without any notice or and action for “Stop deal” will be initiated as decided
by tender inviting authority.
Sign & Stamp of the Bidder
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt
of LOI/LOA, on Stamp Paper of Rs 100/-as per Company’s rules in the prescribed form
of the P.G.V.C.L. attached with this Tender. The cost Rs.100.00 of the Stamp Paper
will have to be borne by the successful Bidders.
4. For the Tendered work, other than turnkey work, entire material will be issued by
PGVCL. Any other related material required to carry out work mentioned in Schedule
A is to be brought by Bidder. No any extra cost will be paid towards such material.
5. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required
tools and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and also
responsible to any type damages to any property and any kind fatal/non-fatal accidents
to anybody during the execution of work. Insurance of all workers is compulsory, who
are involved in Execution of Tendered work. There will be no any financial liabilities
of PGVCL for damage charges paid such way. Copy of valid Labour Insurance Policy in
the name of bidder is to be submitted with Tender Documents.
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be granted
and Penalty with applicable GST with cess as applicable and other taxes in force at
that time will be levied on delayed portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA.
Security Deposit (In form of DD/BG) and Insurance Policy is also to be submitted with
Agreement within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a month
after completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 100/- Stamp Paper and cost
of stamp paper is to be borne by Bidder. Solvency Certificate is to be submitted as per
PGVCL rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthing work, and
work to be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to be
duly certified also.
15. No idle Labour charges will be paid by the PGVCL in case such occasion of idle Labour
arises, due to want of any materials or any other situations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
17. Bidder has to submit the Performance Certificates under whom the similar kind of
Tender work has been executed. Such Certificates must not older than 3 Years
from Date of submission of the Bid. Such Certificate must be duly signed by Cadre
Executive Engineers and above only.
Sign & Stamp of the Bidder
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force
in India, including any such laws passed or made or coming into force during the period
of the Contract.
2. Wages to be paid at the time of payment etc.by the contractor
2.1 The successful bidder shall pay minimum prevailing rates per day, as may be specified
here after, or rates fixed under the Minimum Wages Act, whichever is higher. The
wages of every contract labour employed by him under this contract shall be paid by
him before the expiry of 7th day of the month irrespective of which the wages are
payable i.e. wages of a last month have to be paid by him in the first week of the next
month). The contractor shall have to make wages to his workers through bank only.
The agency shall have to submit the copy of a letter given to the Bank advising for
crediting wages in individual account of the workmen along with photocopy of the
cheque showing total payment to be made to all such workmen whose accounts are
operated in that branch. (If there is more than one Branch, the agency will have to
submit separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the company
so that in case of labour trouble etc. the contractor can be contacted. The contractor
shall arrange to have his office outside the factory premises and the contractor shall
keep himself present through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As
the case may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them. In
absence of such license, the contract shall be liable to be terminated without assigning
any reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep
the PGVCL indemnified in respect thereof. Some of the major liabilities under various
labour and industrial laws which the Contractor shall comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident
fund, administrative charges etc. at the rates made applicable from time to time
by the Government of India / Government of Gujarat or other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate with
the office of the commissioner of labour as per the Contract Labour (Regulation
and abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and abolition)
Act rules framed there under depending upon the number of workmen.
7.4 Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per
industrial Dispute Act. Any payment to the Contractor's employee arising out of any
claim of disputes under the Industrial Dispute Act 1947 or any other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
Sign & Stamp of the Bidder
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed
or any government Contractor under any of the provisions of the Minimum wages
act, Payments of wages Act, Employee's compensation Act, Contract Labour
regulation abolition Act, Employee provident fund or any other law due to act of
omission of the Contractor, the PGVCL may make such payment and shall recover
the same from the successful bidder's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such amount as
may be necessary to cause of observe, or for non-observance of the provisions
stipulated in the notifications/byelaws/Acts/Rules/Regulations/ including
amendments. If any, on the part of the Contractor, the PGVCL shall have the right
to deduct any money due to the successful bidder under this contract or any other
contract with the PGVCL including his amount of security deposit for adjusting the
payment. The PGVCL shall also have right to recover from the Contractor any sum
required or estimated to be required for making good the loss or damage suffered
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation fund
and under the liabilities insurance. The Contractor will arrange insurance policies for
arranging payment to his staff injured / met with accident (Fatal / nonfatal) on duty
of sufficient amount as per Labour laws. In case of any such happening Contractor will
be liable for any other payment to workers / staff engaged as per existing rules.
Contractor will not make any such payment to the Contractor's staff or any
compensation etc. during the pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and conditions of
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to
other liabilities prescribed under the various labour laws, in force from time
to time, from statutory authorities like GOI-GOG, which the Contractor shall
have to comply with.
10. It should be ensured that before commencing the said work, the successful bidder
should submit the details of their labourer such as a full name, address and age with
proof and subsequently changes of workers details are submitted accordingly.
Sign & Stamp of the Bidder
11. The successful bidder shall employ adequate number of an experienced staff at site
for daily supervision and for maintenance of various register and records required
under the law and contract. No payment for supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or
regulations that have to be observed by the contractor for carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No
female worker shall be employed in the night shift between 07.00 p.m. and
14.2 Contractor shall maintain a valid labour license under the Contract Labour
(Regulation and abolition) Act for employing necessary manpower required by him.
In the absence of such a license, the contract shall be liable to be terminated
without assigning any reason thereof. Contractor should also employ qualified and
experiences persons as per requirement of Electricity Act and rules for carrying out
supply and erection work under this contract.
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any
Government agency under any of the provisions of the Minimum Wages Act, Payment
of Wages Act, Employee Compensation Act, Contract Labour Regulation Abolition
Act, Employee Provident Fund or any other law due to act of omission of the
Contractor, PGVCL may make such payment and shall recover the same from the
Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect
of each concerned employee The contractor's contribution and the workers’
contribution towards Provident Fund and Family Pension Scheme shall be done at
the rate made applicable by the Government from time to time and deposited by
the contractor with Regional Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who
are members of the Provident Fund as the contribution to the Deposit Linked
Insurance Scheme with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited
by the Contractor with Regional Provident Fund Commissioner, Rajkot at the rates
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the
Contract Labour shall be provided by the Contractor to his, workers. He shall
maintain Leave Records, Leave Cards for individual labourer which shall be duly
verified, approved and certified by the Authorized Officer of PGVCL. Remuneration
for such leave period shall be fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the
performance of this contract.
Sign & Stamp of the Bidder
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per
rates fixed under the Minimum Wages Act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the expiry of
7th day from the last day of the month in respect of which the wages are payable
(i.e. wages of a month have to be paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor
shall be punishable to the extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so
that, in case of labour trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office within working area and the contractor keep himself
present throughout the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor
and if it is not taken, offer of the firm will not be considered. The attested
documentary evidence to be submitted along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be
ensured that all the contract labourers are covered under the provident fund scheme
and employees’ pension scheme and their contributions are remitted regularly to
the concerned RPFC. The photo copies of the Chelan in this regard should be
collected from the concerned contractor and kept in the file of the concern
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid
price shall include all the costs in fulfilling all the insurance liabilities under the
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as
may be pertinent to the Works and obligatory in terms of law to protect his interest
and interests of the PGVCL against all perils detailed herein. The form and the limit
of such insurance as defined herein together with the under-writer in each case shall
be acceptable to the PGVCL. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall
not relieve him of any of his contractual responsibilities and obligations. The
insurance covers to be taken by the Contractor shall be in the name of the Contractor.
The Contractor shall, however, be authorized to deal directly with Insurance Company
or Companies and shall be responsible in regard to maintenance of all insurance
covers. Further the insurance should be in freely convertible currency.
23. Any loss or damage to the equipment during handling, transportation, storage,
erection, putting in to satisfactory operation and all activities to be performed till
the successful completion of commissioning of the equipment shall be to the
account of the Contractor. The Contractor shall be responsible for preference of
all claims and make good the damages or loss by way of repairs and/or replacement
of the equipment, damaged or lost. The transfer of title shall not in any way
relieve the Contractor of the above responsibilities during the period of Contract.
The Contractor shall provide the PGVCL with copy of all insurance policies and
documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the PGVCL immediately after such insurance
coverage. The Contractor shall also inform the PGVCL in writing at least sixty (60)
days in advance regarding the expiry/cancellation and/or change in any of such
documents and ensure revalidation, renewal etc., as may be necessary well in time.
Sign & Stamp of the Bidder
24. The perils required to be covered under the insurance shall include, but not be limited
to fire and allied risks, miscellaneous accidents (erection risks) workman
compensation risks, loss or damage in transit, theft, pilferage, earth quake, riot and
strikes and malicious damages, civil commotion, weather conditions, accidents of all
kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including
delivery of goods and other costs till the equipment is delivered at Site. The insurance
policies to be taken should be on replacement value basis and/or incorporating
escalation clause. Notwithstanding the extent of insurance cover and the amount of
claim available from the underwriters, the Contractor shall be liable to make good
the full replacement/rectification value of all equipment/materials and to ensure
their availability as per project requirements.
25. All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL
may from time to time, during the pendency of the Contract, ask the Contractor in
writing to limit the insurance coverage, risks and in such a case, the parties to the
Contract will agree for a mutual settlement, for reduction in Contract price to the
extent of reduced premium amount. The Contractor, while arranging the insurance
shall ensure to obtain all discounts on premium which may be available for higher
volume or for reason of financing arrangement of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements for the
portion of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in
special case, if any.
28. The successful bidder has to engage required strength of skilled persons for
execution of work and proper supervisor to avoid complication and unnecessary delay
to complete work timely. The successful bidder will be solely responsible for labour
claims arising out of the labour employed for this job.
29. The successful bidder should furnish details of past experience of such job of similar
nature completed by him satisfactorily within the time limit in PGVCL will be
30. The successful bidder will be abide by and fulfil all the terms and provisions of the
“Tender and contract” for works as applicable and in case of any default there to
the PGVCL Company shall forfeit the S.D. or any other action as may be decided by
Superintending/Executive Engineer _____________ Circle/Division.
31. The successful bidder will certify that he has complied with the provisions of
Industrial & Labour Laws including PF Act, ESI Act etc. as may be applicable.
Copy of challans of PF related to be submitted along with bill.
32. The successful bidder will governed by the PGVCL general conditions of works
contract. The Booklet will be available in the concerned office in any working days.
In the event of placing order, the successful bidder will be bound to the terms &
conditions of the booklet. All the usual terms and conditions of the Company though
the same might have not been mentioned in this specification or contractor booklet
will applicable to this contract, and the decision of the Executive Engineer,
_________ Division shall be binding on the Contractor.
Sign & Stamp of the Bidder
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a
given taxable goods and/or services. The amount and % of GST and Cess as applicable
should clearly be indicated separately. (GST/Cess means all applicable Tax/Cess
under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Composition
Scheme under GST Act, which should be clearly indicated in the price bid. COMPANY
may at its discretion consider such offer with presumption of highest applicable rate of
VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
4. If the Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer. In no case additional amount towards tax or otherwise
will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will
not be applicable in case of Supplier / Contractor has opted for Composition Scheme
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further,
any additional liability of GST (later on due to wrong mentioning of GST rate, mis-
interpretation of HSN/SAC Code, etc.) over and above as charged in the invoice shall be
borne by the Supplier/Contractor. However, any refund received by the supplier /
contractor on account of GST charged from the company; such refund shall have to be
passed on to the company, along with interest if any. Such refund along with interest
needs to be passed on suo-moto by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid/short paid to the government
or fail to upload the details or uploads inaccurate particulars on GSTIN portal by the
Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to
inclusion of any other additional item of their inputs / input services under the ambit of
the Input Tax Credit provisions under the GST Act, subsequent to the date of submission
of the offer, the same should be passed on to COMPANY and you should inform such
changes to COMPANY from time to time. PGVCL’s GST Registration No.is
24AADCP1453C1ZZ.
Sign & Stamp of the Bidder
8. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed
against the PGVCL or the Contractor in pursuance of the Contract. In addition the
Contractor shall be responsible for payment of all Indian duties, levies and taxes lawfully
assessed against the Contractor for his personal income & property only.
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance
with the provision of Income-Tax Laws and to that effect a certificate will be issued to
the contractor, however added as contractor has to submit separate invoice for supply
parts item as well as works part item separately, otherwise TDS will be deducted on
entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay the
same to the respective Govt. Department. Tax will be deducted as per applicable
statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS,
welfare cess or any other taxes applicable time to time etc. All other statutory
liabilities towards this contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within
the contract period will not be considered except GST. No statutory variation will
be given for this work except GST. However, if any decrease takes place
within/after the contractual delivery date, the advantage will have to be passed on
12. The Contractor shall be fully responsible for deducting the P.F. of the
employees/labour Working under him as per statutory regulations and depositing
the same with the concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person
employed of the Contractor or his subcontractors for the purposes of the Works.
Sign & Stamp of the Bidder
GENERAL TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers,
drawings, etc. attached & if has any doubt as to the meaning of any portion of any
condition / specification, etc. he shall before signing the contract submit the
particulars thereof to PGVCL in order that such doubts are removed.
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer,
assign or sublet the work under this contract or any substantial part thereof to any
1.3 The execution of work should be commenced as per the instruction of the Engineer
In Charge as per actual requirement and should be completed within the time limit
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the
work altogether or reduce or cut it down. If the work is stopped altogether, the
Bidder shall only be paid for work done. If the work is cut down the Bidder shall not
be paid for the work as so cut down, but in neither case shall be paid any
compensation what so ever for the loss or profit which he might have made if he
had been allowed to complete all the work included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered
post or telegram or telex or any other way of communication to the successful
bidder at his specified address shall be deemed to have been delivered to the
successful Bidder. The work shall be carried out by the successful bidder with prior
approval of PGVCL. Work carried out without PGVCL’s approval shall not be
accepted and the PGVCL shall have right to reject it and to recover the cost from
the successful bidder. He will be liable against all losses, expenses or claims arising
in connection with the death of or injury to any person employed by the successful
bidder or his subcontractors for the purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment during
transit due to improper or inadequate packing, handling, loading and unloading. The
cases containing easily damageable material shall be very carefully handled.
Adequate protection must be provided for outdoor storage at site in tropical humid
climate, wherever necessary. The successful bidder without any extra cost shall
supply any material found short inside intact store area.
1.7 If the successful bidder neglects to execute the work with due diligence and
expedition or refuses or neglect to comply with any reasonable orders within two
days’ notice given in writing to the successful bidder and if he fails to comply with
the notice, then in such a case PGVCL shall be at liberty to get the work or any part
of it, executed through any other agency/Bidder in the manner and on the terms it
thinks proper. If the cost of executing the work as aforesaid shall exceed the balance
due to the Bidder, and the Bidder fails to make good the deficiency, PGVCL may
recover it from the Bidder in any lawful manner.
1.8 PGVCL shall have at all reasonable time access to the works being carried out by
the Bidder under this contract and stores where material issued by PGVCL is stored.
All the works shall be carried out by the Bidder to the satisfaction of PGVCL.
Sign & Stamp of the Bidder
1.9 The quantities mentioned in the accompanying schedule B are only approximate
same may decrease or increase. The PGVCL reserves the right for revising or
omitting any of the quantities. The actual work executed by the successful bidder
will be calculated at the rate given in the contract schedule of the rates binding to
the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-
up/closed due to whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any account
whatsoever through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be applicable
to this work contract.
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge
and for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should contact our
Engineer In Charge as well as Division Office, ____________ daily for the availability
of materials required for this work, failing to which this work order shall be
terminated without giving any notice.
1.15 The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of
Engineer in Charge.
1.16 In case of any dispute doubt, the decision of Executive Engineer Amreli Division-2
shall be unchallengeable and final, which will be binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of
guaranteed period if any.
1.18 All legal complication of disputes is subject to Amreli jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered value
will have to be produced by the contractor and party has to submit attested copy of
solvency certificate to the company before commencing of work.
1.20 The successful bidder will be solely responsible for any accident/damage either to
equipment or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.22 The successful bidder will have to make his own arrangement for required all kinds
of tools, tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill. The
assessment of which will be done by Engineer In Charge in consultation with division
office, and his sole discretion and his decision shall be binding to the successful
bidder and shall be considered as final and unchallengeable.
1.24 The successful bidder will have to give indemnity bond to PGVCL against any possible
claim of compensation for damage to Contractor’s equipment or staff or any of third
parties during the execution of work as per attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in Schedule-
B of contract awarded to him, as per directive and instruction of Engineer In Charge.
If he fails to do so entire work will be carried out at the risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock,
exclusively for execution of work.
1.27 Specification in any items mentioned in tender are subject to change without any
prior notice and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all
relevant Govt. Authorities from the bill.
Sign & Stamp of the Bidder
1.29 If the work is required to be carried out during fix outage then the successful bidder
has to deploy adequate man power, material, tools etc. well in advance and has to
complete the entire work during this specific outage period only, failing to which
Company shall be at liable to deduct the amount of revenue loss due to prolong
1.30 The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for
completion of work. The contractor will not be eligible for any extra payment in
respect of such minor accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time and it
will be his sole responsibility to execute and complete this work as per the
instruction of Engineer In Charge.
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall be
made from you, on the basis of prices of the materials (prevailing on the date of
settlement of materials account) plus 15% supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised and
latest provision under I.E. Rule Act made there under and as per instruction of
Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on same day
and to be preserved in safe custody failing to which PGVCL shall initiate Police
action. Similarly as per instruction of Engineer In Charge, you have to credit the
material at PGVCL store without any loss of time failing to which PGVCL shall initiate
1.35 Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by Executive Engineer, Amreli
Division-2 shall be recovered from successful bidder’s bill as a penalty with
applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.37 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL
does not take any responsibility in case of accident or injury to the workers. The
safety, security of men, materials and equipment shall be sole responsibility of the
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules etc.
and that of local body is a must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra
amount towards any type of claim except for the description indicated in Schedule –
A. The party has to carry out all other additional required activities / work as
directed by Engineer In Charge which is not mentioned in Schedule but required to
be completed as per the site condition and for this work no extra payment shall be
1.40 The contractor should employ as a Supervisor with sufficient qualification and
experience who could supervise the execution of work throughout. He should always
be present on the site.
1.41 The contractor shall be responsible for breakages, losses and a theft of material
during transit or erection after the materials issued from the stores till the
completion of work and is taken over by the PGVCL.
Sign & Stamp of the Bidder
1.42 As regard damages to the materials, equipment, successful bidder himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN”
Compensation Act or any other statutory provisions, the same will be paid by
contractor directly. If he thinks fit, he may take necessary insurance covering at his
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement etc.
as early as possible and he shall fulfil the entire requirement which is necessary to
finalize the accounts.
1.44 The competent authority can delete any item in schedule of the tender if he feels
that the rate quoted by the contractor for the item is abnormally high when
compared to the estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time and it
will be his sole responsibility to execute and complete this work as per the
instruction of Engineer In Charge.
1.46 The erection work should be carried out according to the specification as per
instructions and programmed laid out by the Engineer in charge. Contractor has
to ensure safe shifting and erection of all accessories / equipment as per standard
1.47 The Bidder shall not display the photograph of the work and shall not take advantage
through publicity of the work without written permission of PGVCL.
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of
completing the work confirming to the requirement of this contract.
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to the
line and Electrical Equipment until the successful completion as defined elsewhere
in the Bid document.
1.50 All demurrage, wharf age and other expenses incurred due to delayed clearance of
the material or any other reason shall be to the account of the Contractor.
1.51 The law applicable to the contract shall be the laws in force in India. The courts of
Rajkot shall have exclusive jurisdiction in all matters arising under the contract.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm
price basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of the PGVCL,
for the complete works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they willhave to match
their end cost with end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting
Authority) may go to the L-2, L-3 and so on depending upon the requirement. If PGVCL
(tender Inviting Authority) feels that there is lack of serious competition or any other
reasons, PGVCL (tender Inviting Authority) may negotiate with the L-1 party. PGVCL’s
(tender Inviting Authority) decision shall be final and binding on all the parties.
3 QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who
have confirmed /fulfilled pre eligibility criteria, as mentioned in Section 1 Sr. No.
2 , will only be considered for price evaluation. PGVCL will not consider the, price
bid of any contractor who does not confirm / fulfil the eligibility criteria as
mentioned in Section 1 Sr. No
Sign & Stamp of the Bidder
3.1.1 While placing the order, the quantity distribution to each new contractors /
new firms shall be restricted up to 30 % of the tender amount/Qty. for all
such new bidders provided the price of New contractor is lower than the
regular/experienced contractor. New contractor / new firm will be
considered as a regular contractor only after full filing experience criteria
as mentioned in Bidders qualifying criteria as per point no. 2 in Section I.
3.1.2 The new contractor will be asked to match the L-1 prices of the new contractor
only and the Regular contractor has to match the L-1 price of the
Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor
is very high, the above condition no. 2.11 shall be suitably relaxed by PGVCL.
L-1 regular contractor however will get heavy weight age in order
3.2 For laying of Under Ground Cable work:
3.2.1 While placing the order, the quantity distribution to each new contractors /
new firms, Section 1 Sr. No. 2, shall be restricted up to 10 % of the tender
amount/Qty. for all such new bidders provided the price of new contractor
is lower than the regular/experienced contractor. New contractor / new
firm will be considered as a regular contractor only after full filing
experience criteria as mentioned in Bidders qualifying criteria as per point
no. 2 in Section I.
3.2.2 The new contractor will be asked to match the L-1 prices of the new
contractor only and the Regular contractor has to match the L-1 price of the
Regular/experienced contractor only. But if there are no Regular contractor
OR if the rate of Regular contractor is very high, the above condition no.
2.21 shall be suitably relaxed by PGVCL. L-1 regular contractor however will
get heavy weight age in order placement. The Contractors who have
confirmed /fulfilled pre eligibility criteria will only be considered for price
evaluation. PGVCL will not consider the price bid of any contractor who does
not confirm / fulfil the eligibility criteria. L-1 regular contractor however
will get heavy weight age in order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each
concerned Divisions under above locations. The planning for each location has to be prepared
in consultation of the Deputy Engineer of the concerned Sub Division under whose control
the work is allocated. The work must be carried out under Supervision of concerned S/dn
Head or Authorized Staff appointed by SDO.
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store Centres
of PGVCL jurisdiction and successful bidder has to take delivery from these stores at his
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued
Fourth Sub Work Order only after the submission of Inventory sheet with sketch and
material account statement for any of the three previously issued Sub Work Orders.
Sign & Stamp of the Bidder
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the respective
sites and will be fully responsible for any damage to or loss of all materials at any stage
during transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe custody
of all the stored materials at his own cost. Material which is to be allotted by PGVCL is
to be carted, loaded and unloaded at Bidder’s cost and risk from PGVCL’s respective
Stores. PGVCL must have access to such Store/s at any time of Day thought the
contractual period and Contractor will cooperate for verification of such store/s and
Inventory accounting. Failing to which actions may be initiated after issuance of required
Notice to the Contractor. Store address/s is to be mentioned in the “General information
about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make
suitable security arrangements at his own cost to ensure the protection of all materials,
equipment and works from theft, fire pilferage and any other damages and loss. It shall
be the responsibility of the contractor to arrange for security till the works are finally
taken over by the PGVCL
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the
extent of 100 % cost of materials, which are required to complete the work. Contractor shall
have to take comprehensive insurance policy equivalent to the Order Value against any loss,
damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over by PGVCL. The Contractor shall deal directly
and pursue the claim with the Insurance Company and shall be responsible in regard to
maintenance of all insurance coverage as well as for settlement of claim. The proof of
insurance policy taken by the successful Contractor shall be furnished to Engineer-In-Charge.
In absence of the above insurance policy, R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible
to lodge, pursue and settle all the claims with the Insurance Company for all items, materials
and the PGVCL shall be kept informed about it. Contractor shall replace the lost / damaged
materials / items promptly irrespective of the settlement of the claims by underwriter and
ensure that the work progress is as per agreed schedule. The loss, if any, such replacement
will have to be borne by the Contractor and PGVCL will not entertain any claim /
representation in this regard. However it will be contractor's responsibility to insure the
entire project is taken over by the PGVCL.
8. Account of material issued:
8.1 The successful bidder shall have to maintain accurate day to day item wise account
of use of issued materials which shall be got checked from time to time by the
Engineer In Charge of the Company. The contractor will be responsible for custody
and preserving the issued materials till the work is hand over by the contractor after
8.2 The successful bidder has to maintain site register, covering all the daily details of
material receipt and utilization, progress of work etc. This register shall be checked
and signed by Engineer In Charge/Deputy /Executive Engineer,of respective
Sdn/Division during the site visit as per requirement and exigency of work if deem
8.3 After completion of the work against each Sub Work Order, all the surplus materials
issued by the PGVCL shall be returned by you to the respective divisional /Regional
stores only at contractor’s cost. Such Material Shall not be credited in S/Dn store.
Sign & Stamp of the Bidder
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the
ordered work within ____ Days from the Date of issue of Work Order.
9.2 Time limit of each sub work order should not be maximum up to 60 Days.
8.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due
to heavy rains or other reasonable causes, such facts should be immediately brought
to notice of the Engineer In Charge. If the reasons for stopping the work are genuine
the Engineer In Charge may ask the successful bidder to start the work again as per
condition. The period of such stoppage will not be considered as a part of working
days moreover the successful bidder cannot claim compensation for such stoppage.
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer
In Charge and Executive Engineer____________. If found that the work is
unsatisfactory or not progressing as per schedule then any action would be taken by
the PGVCL as may deemed fit to see that work is completed at the risk and cost of
contractor. The completion time allowed for each Sub work Order shall be strictly
9. Time limit extension will be given, as per Clause No. 12 of this section, if material
is not supplied in time and in any case of objection not cleared in time. But if
materials given in time and there is no any objection, then no time limit extension
will be granted and penalty with applicable GST with Cess will be imposed as per
11 CHANGE OF QUANTITY:
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or
decrease the quantities of items under the Contract but without any change in unit
price or other terms & conditions. Such variations unless otherwise specified in the
accompanying GCC and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the
Contract shall be limited to the extent of 30% (Thirty Percent) of the contract price by
way of suitable amendment to the contract.
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in
the Contract for the change in quantities as above. The base unit rates, as identified
in the Contract shall however remain constant during the currency of the Contract, In
case the unit rates are not available for the change in quantity, the same shall be
subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor.
Responsibility of material will be that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If the
work is not completed within the scheduled period as prescribed in Sub Work
Order, penalty with GST and cess as applicable at the rate of 0.5 % per week
or part thereof on delayed portion subject to maximum up to 10 % of the sub
work order Value with GST and cess as per applicable rate. This will be
deducted from the bills payable either against this contract or any bank
guarantee or any other amount payable under any other contract with the
PGVCL. For Penalty calculations or Time limit Extension, following points are
to be observed.
Sign & Stamp of the Bidder
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on
which the first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store
In-charge/Store Keeper must be taken against the particular item by the
12.4 In Case of non-availability of Material, contractor must visit the respective store
every fortnight and no stock material details are to be submitted to respective
Executive Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents produced by
12.6 Time limit Extension must be given as per F & A Letter No. PGVCL/F&A/5083/14-
12.7 At the time of submission of Bill against SWO, all such Documents are to be
submitted by contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
12.9 During the execution of Work, if Contractor/Labour are found violating OR Braking
the Safety rules and Regulations, then Engineer-in-Charge will serve the warning
Notice on first Instance. On second Instance the amount of Fine will be Rs.
500.00 or 0.1 % of amount of SWO (Whichever is high) with GST and cess. Even
If after above two instances, still Contractor found breaking of Safety Rules and
Regulations then Procedures for Stop dealing must be initiated against him as per
rules and regulations.
13. Payment terms shall be as follows:
13.1 Payment will be made against Invoice value and shall be paid against actual execution.
The bills should be submitted in Duplicate to respective Superintending/Executive
Engineer, Circle/Division Office along with following documents:
• Measurement Report of each site by PGVCL authorized inspection Officer (not below
the rank of Deputy Engineer)
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
• Copy of Insurance Policy against the Material equivalent to the Order Value as per
Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from the
actual date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
13.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise
only final bill shall be paid.
13.3 The time limit for the work may be reduced and contractor should make all his
efforts to complete the work within stipulated time limit as may be given by the
Engineer In Charge depending upon emergency of work.
14 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
14.1 War and other hostilities, (whether war be declared or not), invasion, act of
foreign enemies, mobilization, requisition or embargo;
14.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
14.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or
from any nuclear waste from the combustion of nuclear fuel, radioactive toxic
explosive, or other hazardous properties of any explosive nuclear assembly or
nuclear components thereof;
Sign & Stamp of the Bidder
14.4 Riot, commotion or disorder, except where solely restricted to employees of
the Contractor.
14.5 Neither party shall be considered to be in default or in breach of his obligations
under the Contract to the extent is that performance of such obligations
prevented by any circumstances of Force Majeure that arise after the date of
the Notification of Award.
14.6 If either party considers that any circumstances of Force Majeure have
occurred which may affect performance of his obligations he shall promptly
notify the other party.
14.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor
shall endeavour to continue to perform his obligations under the Contract so
far as reasonably practicable. The Contractor shall notify the Engineer-in-
Charge of the steps he proposes to take including any reasonable alternative
means for performance, which are not prevented by Force Majeure. The
Contractor shall not take any such steps unless directed so to do by the
Engineer-in-Charge.
14.8 If circumstances of Force Majeure have occurred and shall continue for a period
of 180 days, notwithstanding, the Contractor may by reason thereof, having
been granted an extension of Time for Completion of the Works, either party
shall be entitled to serve upon the other, 30 days’ notice to terminate the
Contract. If at the expiry of the period of 30 days Force Majeure shall continue,
the Contract shall terminate.
15 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules
& procedure. Any extra cost involved due to incompleteness of work or bad
workmanship found out subsequently shall be set right with and by you at your own
16 HANDING OVER OF ASSET
16.1 After successful completion of the lines and Transformers or any other
electrical equipment the entire newly created network is to be handed over to
the concern Deputy Engineer of PGVCL. The handing over note covering the
details of all the materials used and total work executed must be signed jointly
by the bidder and PGVCL Engineer. Copy of handing over note must be attached
along with bill.
16.2 The contractor shall arrange to hand over the complete work immediately on
completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by
contractor due to non-availability of particular item/material for long period of time
and TLE cannot be approved for that work beyond certain time limit Or such item if
not required to be installed at particular location, then Recovery is to be made as
mentioned below for not carrying out that work from SWO issued for that work.
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other
Recovery should be made other than above Work.
Sign & Stamp of the Bidder
18 CONTRACT QUALITY ASSURANCE:
18.1 The Bidder shall include in his proposal the Quality Assurance Program containing
the overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
18.2 At the time of Award of Contract, the detailed Quality Assurance Program to be
followed for the execution of the Contract. PGVCL reserve the right to inspect the
work at any stage of contract i.e. during the execution and after the execution of
18.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out
items (if any) are being supplied. Such details shall be accompanied by their list of
previous supplies made performance reports etc. However, in case of orders are
placed, specific approval shall be obtained from the PGVCL for the vendor supplied
materials. The quality assurance program shall be furnished for each material
separately for approval.
19 TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
19.1 In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to
cancel the order without giving reasons thereof and forfeit the security deposit.
19.2 The PGVCL reserves the right to terminate the Contract either in part or in full due
to reasons other than those mentioned under clause entitled ‘Contractor’s Default.
The PGVCL shall in such an event give fifteen (15) days’ notice in writing to the
Contractor of his decision to do so.
19.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall
discontinue the work on the date and to the extent specified in the notice, make all
reasonable efforts to obtain cancellation of all orders and Contracts to the extent
they are related to the work terminated and terms satisfactory to the PGVCL, stop
all further sub-contracting or purchasing activity related to the work terminated,
and assist PGVCL in maintenance, protection, and disposition of the works acquired
under the Contract by the PGVCL. In the event of such a termination the Contractor
shall be paid compensation, equitable and reasonable, dictated by the
circumstances prevalent at the time of termination.
19.4 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless the PGVCL is satisfied that the legal representatives of the
individual Contractor or of the proprietor of the propriety concern and in the case
of partnership, the surviving partners, are capable of carrying out and completing
the Contract the PGVCL shall be entitled to cancel the Contract as to its in
completed part without being in any way liable to payment of any compensation to
the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of
the PGVCL that the legal representatives of the deceased Contractor or surviving
partners of the Contractor’s firm cannot carry out and complete the Contract shall
be final and binding on the parties. In the event of such cancellation the PGVCL shall
not hold the estate of the deceased Contractor and/or the surviving partners of the
estate of the deceased Contractor and/or the surviving partners of the Contractor’s
firm liable to damages for not completing the Contract.
Sign & Stamp of the Bidder
20 ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder,
in connection with this agreement except as to matters, the decision for which has
been specifically provided, either party may forthwith give to the other notice in
writing of existence of such questions, dispute, difference and the same shall be
referred to the sole arbitration of a person nominated by Managing Director, PGVCL.
This reference shall be governed by Indian Arbitration Act prevailing at the time of
dispute and the rules made there under. The award in such arbitration shall be final
and binding on all the parties. Work under the agreement shall continue during the
arbitration proceedings unless the PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents
forming part of the enquiry or Contract are property of PGVCL and shall not be used
for any other purpose, except for the execution of the contract. All rights related to
the technical specifications, drawings and records are reserved by PGVCL only and no
part or partial should be reproduced, copied or alter without prior permission to
PGVCL in writing. In the event of the breach of this provision, PGVCL can claim the
damages caused by such events.
22 Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
22.1 Has submitted fake, false or forged documents/certificates
22.2 Has revised/withdrawn price bid after opening of Techno: commercial
bid, until and unless it is sought for
22.3 Has refused to accept Letter of Acceptance/Purchase Order/Work
Order after the same is issued by the Company within the validity
period and as per agreed terms and conditions
22.4 Has committed breach of contract or has failed to perform a contract
or has abandoned the contract
22.5 Has failed to provide suitable expertise for the work as per
prescheduled program
22.6 Has failed to submit all the necessary Test reports/documents within
time schedule / as per Company's time limit, as mentioned in the LOA,
if the Letter of Acceptance (LOA) is placed subject to submission of
type reports / documents to the firm.
22.7 Has indulged in construction and erection of defective works.
22.8 Has substituted materials In lieu of materials supplied by the Company
or has not returned or has short returned or has unauthorised disposed
of materials/ documents/ drawings/ tools or plants or equipment
supplied by the Company
22.9 Has involved in malpractices such as bribery, corruption, fraud,
canvassing and pilferage
22.10 Has unauthorised obtained official company information or copies of
documents, in relation to the Tender/Contract
22.11 Has failed to follow the stipulated mode of communication, if specified
by the tendering authority/ purchaser.
22.12 Any other ground for which in the opinion of the Company makes it
undesirable to deal with the Firm, and
22.13 In case the State Government directs the Company to place a firm in
stop dealing/ banned for business dealing/ blacklisting
Sign & Stamp of the Bidder
22.14 The firm, stop deal and/or banned for business dealing and/ or
blacklist by GUVNL or any subsidiary Companies of GUVNL shall be
considered as a stop deal and/ or banned for business dealing and/ or
blacklisting for all Companies.
23. Effect of putting a proprietor/firm for Stop dealing/Banned for business
dealing are as below:
23.1 The proprietor/all the partners/directors of the stop deal/ banned for
business dealing/ blacklisting firm shall also be considered for stop deal/
banned for business dealing.
23.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm
appears in the list of Stop dealing / Banned for business dealing in any
Company of GUVNL and its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid
submitted by the Firm shall be returned.
23.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the
firm is put on Stop dealing/ Banned for business dealing by GUVNL or any of
its subsidiary Companies, during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be
treated as “Disqualified Bid” and automatically stand as “Rejected
Bid” at the time of scrutiny of Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price
bid of the Firm should not be opened and the bid submitted by the Firm
will be treated as “Disqualified Bid” and automatically stand as
“Rejected Bid” at the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be ignored and
will not be further evaluated. The Firm will not be considered for issue
of order even if its price is the lowest. In this situation, the next lowest
bidder shall be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be returned
after obtaining confirmation from GUVNL and its other subsidiary
Companies that there are no outstanding dues recoverable from the
23.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company
and is already executing work and/ or Letter of Acceptance/ purchase order
awarded to them by another Company, then the firm should be allowed to
complete such awarded work / supply.
23.5 The amount of EMD/SD/ any payment against supply withheld at the
instance of GUVNL or any of its subsidiary Companies shall be appropriated
against the dues recoverable from the firm by GUVNL or any of its subsidiary
Companies. EMD/ SD/ PG in the form of bank Guarantee shall be encashed
and appropriated.
23.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and
when a Firm is put on Stop dealing/ Banned for business dealing, all the
manufacturing works of the Firm shall be on Stop dealing/ Banned for
business dealing for GUVNL and its Subsidiary Companies & for all Services
23.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a
Proprietary Concern, then all the Concerns of the same Proprietor shall also
be considered to be on Stop Dealing/ Banned for business dealing.
Sign & Stamp of the Bidder
23.8 The Board of Directors of the concerned Company may however, if he
considers it to be in the interest of the Company, remove the ban in respect
of any specific Service from any Contractor for that Company only.
24. Every bidder should, at the time of submission of bid, give a declaration as per
Annexure VI attached with this Tender, that bidder and/or proprietor/ partner/
director of the firm has not been placed on Stop dealing / Banned for business
dealing / blacklisting by GUVNL and it’s any Subsidiary Companies.
25. JURISDICTION:
All questions, disputes, or differences arising under out of or in connection with
Tender/Contract if concluded shall subject to the exclusive jurisdiction of the Court
under whose jurisdiction the place from which Tender/Acceptance if Tender is
issued, is situated i.e. respective Location’s Court.
Sign & Stamp of the Bidder
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Item Time required for work Mentioned in Tender
1 Labour work for Laying of
Underground cable and E/o HT
LT Line and Transformers and
Sign & Stamp of the Bidder
Details of work experience in last three years
(To be completely filled by the Bidder)
Company with full Ref. & Work
Sr. Details of order
address, phone, Work Description date of Order
fax and name of the order Value
• Copies of MAJOR Work orders along with Work completion certificates should be attached with
this information.
• If necessary, separate sheet may be used to submit the information
Sign & Stamp of the Bidder
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Ref. & Work completion with
Sr. full address,
Work Description date of Order Certification of
No. phone, fax and
the order Value Order issuing
name of contact
• Copies of Resumes and appropriate certifications should be attached with this information.
• If necessary, separate sheet may be used to submit the information.
Sign & Stamp of the Bidder
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of PGVCL at
_______________________ (designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent Department
i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below
in this sheet. If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to
Chapter No, Clause No. of Deviation offered
the tender document
Sign & Stamp of the Bidder
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. Name of equipment Date of purchase Date of calibration Utility
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped for
each quoted item of the tender along with the Technical Bid.
M/s_________________________________________________ is not stop deal/black listed by
GUVNL and or any subsidiary companies viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for
the tendered item.
Seal & Signature of the Tenderer/Firm
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Type Test Tests Carried Rating & Type / Name of the Results
Sr. No Report No. & out at (Name Designation of test Of the
Date of Laboratory) Item / Equipment Conducted Tests.
Sign & Stamp of the Bidder
List of Performance Certificate:
Sr. Name of the Authority by Reference No. &
Details of items
No. whom certificate is issued Date
Sign & Stamp of the Bidder
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five
Sr. Type Of Accident Brief Reason for
Fatal/Nonfatal Affected
No. (Electrical/Mechanical) the Accident
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR
MISHANDALING OF MATERIAL
M/s_____________________________________________ hereby declare we will provide
______ nos of labours to carry out this tenders scope of work. We are having Labour Insurance
Policy No.____________________ for ________ nos. of our labours. We declare that, as
mention below table, we are having following safety gadgets of our own and they all are in
good condition.
Seal of the Firm Signature of the Tenderer with Designation
List of Safety Gadgets Owned by Bidder
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Sign & Stamp of the Bidder
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having
their registered office at _____________________________________ (Address of the firms
Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank Guarantee
for (hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid till _________
(Mention here date of validity of this Guarantee which will be 5 (FIVE) months beyond initial
validity of Tender’s offer) which is required to be submitted by the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank Guarantee)
having our registered office at ______________________ (Address of Bank’s registered office)
hereby give this Bank Guarantee No.________________ dated _________ and hereby agree
unequivocally and Unconditionally to pay immediately on demand in writing from the Paschim
Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any amount not exceeding
to the said Paschim Gujarat Vij Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender
or part thereof by the Tenderer within its validity or Non submission of Security Deposit by the
Tenderer within one month from the date tender or a part thereof has been accepted by the
Paschim Gujarat Vij Company Ltd. would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encashed amount is
liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of ____________________
(Mention here the date of validity of Bank) and shall not be terminable by notice or by Guarantor
change in the constitution of the Bank or the firm of Tenderer Or by any reason whatsoever and
our liability hereunder shall not be impaired or discharged by any extension of time or variations
or alternations made, given, conceded with or without our knowledge or consent by or between
the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted
Our Guarantee shall remain in force till _________ (Date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before_______ (Date
of Validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are
(i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij Company
Ltd. or any Officer authorized by it in this behalf any amount up to and not exceeding _______ (in
words) Rupees ___________________ to the said Paschim Gujarat Vij Company Ltd. on behalf of
M/s. _________________________________________________who have entered into a contract for
the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of ______________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given conceded
or agreed, with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs.___________ (Rupees ___________________________ only). Our guarantee shall
remain in force until ____________________ (Date of validity of the Guarantee). Unless demands
or claims under this Bank Guarantee are made to us in writing on or before_______ (Date of validity
of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s Authorized Signatory with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which
are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
This agreement is made at ___________the ___ day of ______month _______Year between the
Paschim Gujarat Vij Company Ltd. & __________________________ (hereinafter referred to as
“the Contractor “which expression shall unless excluded by or repugnant to the context included
its successors or permit assigns) of the one part and the Paschim Gujarat Vij Company Ltd. Having
its Regd. and Corporate Office at Laxminagar, Off Nanamava Road, Rajkot, 360004 (hereinafter
called “The Company” which expression shall unless excluded by or repugnant of the context
include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work
LOA No. ____________________, Dated ___________, hereinafter called “The works and more
particularly desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer, , Circle/Division, PGVCL on behalf of
the Company, a list where of is made out in the schedule here under written and all of which said
documents are deemed to form part of this contract and include in the expression “The works
“wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and Underground cable up on the terms and subject to the
conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable necessary
for the completion of the works as mentioned and at the time in the manner and subject to
the terms conditions and stipulation contained in this contract and in consideration of the
due provision, executions, construction and completion of the works agreed to by the
contractors as aforesaid the company both hereby covenant with the contractor to pay all
the claims of money as and when they become due and payable to the contractor under the
provisions of the contract such payment to be made at such times in such manner as is
provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of
the conditions and the covenant as stipulated in the general conditions specifications form
Or tender schedule drawing etc. attached with the Company LOA No.
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his
Supervisors and labours to execute the work mentioned in Tender. On violating or breaking
the Safety Rules and Regulations, and if Supervisors/Labours are found without Safety
Gadgets, “The Company” reserves the right to take actions as per the terms and conditions
mentioned in Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s
Default’. The PGVCL shall in such an event give fifteen (15) days’ notice in writing to the
Contractor of his decision to do so.
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to
the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Company, stop all further sub-contracting or purchasing activity related
to the work terminated, and assist “The Company” in maintenance, protection, and
disposition of the works acquired under the Contract by the Company. In the event of such
a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners dies
then unless “the Company” is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership, the
surviving partners, are capable of carrying out and completing the Contract “the Company”
shall be entitled to cancel the Contract as to its in completed part without being in any way
liable to payment of any compensation to the estate of deceased Contractor and/or to the
surviving partners of the Contractor’s firm on account of the cancellation of the Contract.
The decision of the Company that the legal representatives of the deceased Contractor or
surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall
be final and binding on the parties. In the event of such cancellation the Company shall not
hold the estate of the deceased Contractor and/or the surviving partners of the estate of
the deceased Contractor and/or the surviving partners of the Contractor’s firm liable to
damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may
be altered by mutual agreement and if so altered shall not be deemed or constructed to mean and
to effect or alter other terms and conditions of the contract and the contract so altered or revised
shall be and shall always be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the COMPANY
having given contract for the work of _________________________________
No. __________________________, dated _______________ and all future contract that may
be awarded to me in the next one year and in terms of the condition in clause 33 of the COMPANY’s
tender and contract for work.
I residing at by this Bond bind myself responsible for
and shall pay compensation to my workmen payable under the workmen’s compensation ACT –
(viii of 1923) hereinafter called the said Act for death or injuries caused to the workmen engaged
by this presents, if such compensation is paid by the COMPANY as principal under such sub-section
(1) of section 12 of the said Act on behalf of me, to pay such amount of compensation on demand
within 48 hours to the COMPANY that it might have to spend as legal and other incidental charges
in defending any suit or action arising out of the death of injuries in regard to compensation paid
to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death
or injuries to the workmen engaged by me. During the execution of work of said contract and all
future contracts that may be awarded to me in the next one year is filed by the worker against the
COMPANY, I shall imbrues to the COMPANY such sum that the COMPANY
is required to spend as legal and other incidental charges in defending such suit or action and also
the amount that may be ordered to be paid to the worker / or his heirs as compensation and that
the above written bind shall remain in full force and virtue till the COMPANY is required to defend
such suit or action filed by the workers and or heirs against the COMPANY. Further it is applicable
on death of contractor himself also. No any compensation will be claimed by legal heirs of
Signature of the Executant
LABOUR RATES ATTACHED IN PDF
Sign & Stamp of the Bidder
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work 11 KV and
L.T. Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the PGVCL. The
inferior and unsatisfactory work is liable for rejection and to be rectified at the cost of contractor.
The work will have to be carried out as per programmed laid down by department and under the
entire instruction of engineer-in-Charge and contractor should employ supervisor who could
supervise the works through out and he should remain present on site. No tools & Tackles will be
supplied by the department.
(A) Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done by the
contractor at his cost. The Company will assist the contractor in getting necessary permission
for tree cutting etc. Any claim for compensation in above respect will have to be borne by
(B) Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and will be
shown to the contractor. He should adhere to these locations in all circumstances unless directed
by the department to make any change. The Poles from One site to other site or at proposed
locations must be carted by loading on Tractor or Hand-Cart. The Poles shall not be carted by
toeing/Dragging with Tractor or Cart or with any other means.
(C) Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height of the pole
and for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet. The poles and guys
must not be set at the edge of cuts/at shore/embankment where the soil is liable to be washed
or eroded out of such setting should be avoided. While back filling, earth must be packed tight
and in no case earth be dumped to greater depth more than four inches without being rammed,
hard before the next layer is thrown in. Extra earth should be packed around the poles and
The cost of damage done to the pole during erection will be recoverable from the contractor.
No pole, which is out of plumb or out of alignment shall be accepted. The pole will be in his
safe custody till erected and he is liable to compensate to the Company the full cost of pole
along with supervision charges, if the pole is broken during erection, or stolen from his custody.
He should be able to render full account of the poles entrusted to him whenever the Supervising
Officer demands to scrutinizes the same.
(D) Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the
village, excavation of pit, erection in position (with base plate where required), of 8/10 meter
PSC poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps and cross arms
and fabricated materials, fixing of caution board, anti-climbing device etc. complete as per
drawing and specification inclusive of painting, numbering. Generally vertical formation will be
used on each pole. However horizontal formation will have to be used in special circumstances
as per instruction at Engineer in change.
Sign & Stamp of the Bidder
(E) Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or
telephone line crossing, terminal structure for distribution transformer centre comprises of
Excavation suitable pits and refilling of earth, erection in position of two Nos. of 8/10 meter
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps, cross arms, bracing
cross arm bracing etc. as per drawing/ standards with mounting D.O. fuses/A.B. switches/HT
metering equipment’s etc., painting, Pole numbering, fixing of caution Board and anti-climbing
The D.P. must be properly aligned and must be in plumb. Special structure if included will be
erected as per drawing supplied. Each Shackle Points must have “D” type Jumpers only.
(F) Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT pin
and strain insulators, binding on insulators, jumpers, the jointing in HT line will be done by
twisting sleeve joints as per standard practice. Care must be taken in handling the conductor to
protect against cuts, scratches or kinks. The conductor must not be drawn over rough or rocky
ground, when it is liable to be damaged. AAA/ACSR conductors must be drawn on wooden or
aluminium pulley only. Wastage and cutting should be avoided as far as possible. Not more than
3 % sag will be accepted in the materials account. The sag and spans will be maintained as per
drawing/standard. The cross arms insulators must be so fixed that neither tilts nor bands from
position. The sagging should be uniform for all conductors and uneven sagging will not be
allowed. The ground clearance to be maintained as per IE Rules 2010 Clause No. 58 as mentioned
For lines of voltage not exceeding 650 Volts 5.8 Meters
Across a street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
For lines of voltage not exceeding 650 Volts 5.5 Meters
street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
If bare - 4.6 Meter
Elsewhere For lines of voltage up to and including
than along or 11,000 Volts
street For lines of voltage exceeding 11,000 Volts
but not exceeding 33 kV
An overhead line shall not cross over an existing building as far as possible and no building
shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause
No. 60 from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof
(a) When the line passes above the building a vertical clearance of highest part of building
immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters from
the nearest point
Sign & Stamp of the Bidder
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or terminates
on any building, the following minimum clearances as per IE Rules 2010 Clause No. 61 from
any accessible point, on the basis of maximum sag, shall be observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above the
building a vertical clearance of highest part of building immediately under such line
meters from the highest point,
(b) When the line having voltage 650 V and up to and including 11000 V passes adjacent to
the building a horizontal clearance between nearest Conductor and any part of such
building on the basis of maximum deflection of wind must be 1.2 meters
(iii) Minimum clearances in meters between lines crossing each other as per IE 2010 Clause No.
69 are as below.
Nominal System 110-132
1 Low and Medium 2.44 3.05 4.58 5.49
In case of illegal construction / structure on the line under erection, the same is to be put
in written notice to the Engineer-In-charge.
(G) Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of
suitable pit size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay wire. The
stay insulators must be inserted in the stay wire on all stays as per drawing. The wrapping of
the Guy wire strands at both ends the stay insulator must be even and must presents neat
appearance and good workmanship. No stay should be left loose but should be tight and straight
to withstand in say cyclone or sand storm, the item includes refilling of earth and painting of
fabrication material. If stays are not required to be concreted, a pre casted cement concrete
block will be supplied by the department from his division store which the contractor will have
to transport at his own cost to the site of work and will have to use for fixing of anchor rod at
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing is required
to be carried out. The earthing pipe/earthing plate/earthing coil supplied by the company shall be
used as per specification and drawing. GI wire no. 8 SWG for earthing should be bolted with earthing
pipe/earthing plate/earthing coil. G. I. Wire must be passed through PVC rigid Pipe which must be
buried at least 0.5 Meter in ground and to be kept 2.0 Meters above ground along the Pole. The
earthing are to be done at place as indicted in the pole schedule or as selected by the field
Engineer. The coke and salt will have to be supplied by the contractor at his cost. Erection of
earthing should be carried out under the supervision of the Engineer in charge or nominated
Supervisors. At least 20 KG of salt and 20 KG of coal per earth on alternate layers (as per drawing)
will be used by contractor. No amount will be paid if the work is not done in accordance with these
The guarding will have to provide at crossing of lines, telephone line crossing, road crossing and
any accident prone places as indicated by the Engineer in Charge. The work comprises of fixing of
guard cross arms, eye bolts, guard cradle as per design, GI cross lacing wires complete. Any special
type of guarding if required will be designed by the department. Binding cross arms must be used
where the HT line crosses the road. The ground clearance, line to line clearances etc. to be
maintained as per IE Rules 2010 69 and 70. The poles for road crossing may be concreted as
instructions of the Engineer In-charge. The work has to be carried out as instructions of the Engineer
Sign & Stamp of the Bidder
(J) Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminium paint. All fabricated material will also be painted with two coats of
approved aluminium paint and there should be sufficient interval between every coat of
painting in order to allow for drying. The bolts and must shall be dipped in anticorrosive oil
before insertion. The lower portion of steel poles up 3 foot above ground level shall be cleaned
of all dust and rust. This surface should be given a base coat of red lead and an additional coat
of black bituminous paint before inserting in the ground. The good quality paint will be supplied
by the contractor and should be of I.S.I mark and will be got approved from Executive Engineer,
prior to starting work.
Name of the feeder and pole number has to be written on all the poles in English/Gujarati as
per instruction of Engineer In-charge. The colour of back ground and name/number must be of
contras colour. Prior to apply Colour for Numbering on P.S.C poles, it should be properly
cleaned and all accumulations of earth, dirt etc. should be removed.
(K) Concreting:
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC Pole/Guys
to be concreted without any special reason. The Concreting of PSC Poles must be approved by
concerned Executive Engineer prior to execution as per Tender Condition mentioned under
Section III Clause No. 2 and sub clause No. 8. Certificates for special Reason and approvals
must be submitted with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by
Engineer In-Charge as and where required. Concreting should be with one part of cement, two
part of specified quality sand and four parts of well burnt Brice bats (1:2:4). The mixture
should be prepared on GI sheet and should be free from the dust. Cement, river sand and metal
should be used by contractor at his own cost. The finishing coat of cement plaster shall be
applied on outer surface Concreting and boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for stay 2 x 2x
1 Feet (0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet (h) (2’ above and 1'
below ground) (0.15 cmt).
(L) Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on two poles
structures as per standard drawing and 5 KVA Transformers are to be on Single Pole. This work
include erection of special two pole structure as per Item No. 2 and fixing of all fabricated
material for support of line, L.A., HG Fuse/AB Switch, Transformer, LT Dist. Box, cable wiring,
anti-climbing devices etc. The works includes of transportation and hoisting of transformer,
numbering and painting of all fabricated materials. For transformer having capacity of 100 KVA
and above MS channel shall be utilize which will be supplied by the company. Three Earthing
are to be provided on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on other side.
3) For neutral, two separate Earth wire on both side of Transformer and to be common at
All three earthing are to be done as in Delta Formation as shown in the attached Drawing. All
earthing wires are to be connected by proper size of lug and bolted at each earthing points
properly. The Earthing of Transformer Body must be done with lug only.
Sign & Stamp of the Bidder
Looping or winding with Earthing Bolt on Transformer Body is not allowed. Earthing wire
Lugs are to be brought by Contractors. No any extra cost will be paid for this material.
Extra payment for hard soil or rock is payable as per SOR as per committee report to be
formed to decide hard soil or rock which shall consists of Concerned SDO, Deputy Engineer
(Tech) and Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is recoverable from
Before starting the work (new, alteration or addition) and during the works the contractor
must obtain line clear wherever necessary for the concerned officer of this office of other
Office. For any damage done to the Men, Materials and/or property due to non-observance of
rules, the contractor will be solely responsible.
Sign & Stamp of the Bidder
NEW Amended Conditions
Utilization of Pole Erection device (PED machine) for erection of all poles.
The erection and maintenance work of HT / LT line and transformer centres are
carried out by various contractors. In order to ensure the quality in erection of poles,
in scheme works it is decided that the pits should be digged by using the POLE
ERECETION DEVICE (PED Machine). Hence all line contractors should have POLE
ERECETION DEVICE (PED Machine).
Only registered vendor in PGVCL shall be entitled for participating in tender process.
No Offline submission is require only online submission is allowed.
Bidder has to upload scanned copies of original (Notarized/self-attested copies of
original - as specified in this tender) with bid, no physical documents to be called from
bidder. It shall be sole responsibility of the bidder that the uploaded scanned
documents (in PDF form) remain legible and should not be password protected.
Payment of tender fee and EMD cab be accepted through on line RTGS/NEFT in PGVCL
"the details of bank account is the details of bank account is SBI, IFSC code: -
SB1N0060070 and name of account holder paschim Gujarat Vij Company Limited"
Bidders willing to participate in tender should have valid digital certificate I Digital
Signature as per Information technology Act 2000 using which they can sign their
electronic bids. Bidders can also procure the same from (n) code solutions, a division
of GNFC Ltd., who are licensed certifying authority by Govt. of India.
If during one year following the work completion any maintenance is felt necessary, for
example straitening of pole, cross arms, Conductor stringing, Tightening of Guy etc.
then such work will have to done by the bidder free of cost.
A bidder shall not have conflict of interest with other bidders for particular quoted
item. Such conflict of interest can lead to anti-competitive practices to the detriment
of Procuring Entity's interests.
Bidder shall have to complete the work as per the given time limit in sub order and if
any work order/sub work order is delayed beyond 120 days from the eligible time limit
mentioned. If bidders are failed to compete the work in this time period then
name/firm is not eligible for further orders till all allotted works are finalized.
The time will be extended as per provision laid dawn in Delegation of Powers
(Committee level) Clause no 5.0 Power relating to Contractors and sub clause no 5.5 B
as "Extension of time limit for works contract if applied before or after the expiry of
contract period with penalty"
For erecting poles the pits should be digging by using Pole Erection Devise (PED
Machine). Where ever it is not possible to use the PED machine in the area lick hard
rock, small streets etc. the permission of the engineer in charge shall be obtained for
digging of pits as per the conventional method.
Sign & Stamp of the Bidder
Check-list for Work Cross Verification
Sr. No. Check list for work as per specification Comment
1 Pole pit up to mark
2 Pole earthing with pipe end buried under ground
3 MS Fabrication as per drawing
4 Structure Alignment (Pole/DP), Pole facing
5 Pin Insulator bottom nut tightened
6 MS Fabrication painted with Red oxide + silver oxide coat
7 Proper stringing
No unsafe crossing and crossing with guarding/AB cable at
9 No double power on any structure
Proper Clearance as per norms with nearby structures,
buildings, lines, ground.
Providing proper earthing in transformer(3 Nos. separate)
and HT line pole as per specification
Earthing wire of Transformer centre must be provided
through proper size of lugs
13 Tightening of Guy-set
14 S/S set as per drawing
15 Proper rating of DO fuse with alignment
Lightening arrester fixing with proper jumpering and
17 Separate Delta earthing for DTC
Proper laying of incoming/outgoing LT cable from
distribution box to service pole of LT line
19 D-type jumpers
20 Breather in DTC
Arcing horns with "as is" clearance and position on
22 Pole number painting
23 MCB of DTC must be properly installed
24 Nut-Bolt as per requirement and fastening with washer
25 Separate pole & earthing pits
26 Coal & salt as per specification for earthing
27 Credit of Conductor scrap
28 Credit of Scrap other materials
Name of scheme :
Location/Feeder :
Cross verified by (Name, Design., Office) :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
16 SCHEME DHARI-1.pdf
Labour Rates for FY 2026-27 Annexure 1 to 7.pdf
SPECIAL NOTE FOR BIDDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .