Muncipal Commissioner Nadiad
BID DOCUMENT FOR ANNUAL RATE CONTRACT FOR DIFFERENT TYPE OF RAIN WATER HARVESTING STRUCTURE UNDER JAL SANCHAY JAN BHAGIDARI SCHEME FOR NADIAD MUNICIPAL CORPORATION - NADIAD.
286128
20TH OF 13TH MARCH 2025/26
Open
Civil - All
Works
Kheda
3 documents required · 3 mandatory
₹4,248
MUNICIPAL COMMISSIONER NADIAD MUNICIPAL CORPORATION
₹2.5 L
13 Mar 2026
13 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Date of Technical Bid Opening Date 24/03/2026 & 18:00 Hrs.
Date of Price Bid Document Opening On Date 24/03/2026 & 18:10 Hrs.
Consulting Civil Engineer City Engineer
Dharmesh Deshani OPC Pvt Ltd. Nadiad Municipal Corporation
Ahmedabad Nadiad
Deputy Municipal Commissioner
Nadiad Municipal Corporation
Sr No Section Description Pg No.
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -6 Form of Bid
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The NADIAD MUNICIPAL CORPORATION invites bids for the construction of works detailed in the
The bidders may submit bids for any or all of the following works.
Packag Name of Approximate Bid Cost of Period of Class of
e No. work value of works security document completion Registration /
(Rs.) (Rs.) Category of
1 As Per NIT & 2,50,00,000/- 2,50,000/- 4,248/- 12 months “B” Class & Above
Details Given civil work
Name of Work: BID DOCUMENT FOR ANNUAL RATE CONTRACT FOR DIFFERENT TYPE OF RAIN
WATER HARVESTING STRUCTURE UNDER JAL SANCHAY JAN BHAGIDARI
SCHEME FOR NADIAD MUNICIPAL CORPORATION - NADIAD.
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.nprocure.com free of cost till the Time and Date as mentioned on online NIT at
website https://www.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee /
Tender Fee through Demand Draft only of any Schedule Bank payable at
NADIAD and in favour of ‘Municipal Commissioner, NADIAD MUNICIPAL CORPORATION. Once
the Bid is received online, Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee / DD against Bid
Security / EMD shall be submitted in electronic format through online (by scanning) while
uploading the bid, this submission shall mean that bid document / tender fee and Bid Security /
EMD has been received. Accordingly, the offer of only those shall be opened whose Bid
Document / Tender Fee and Bid Security / EMD have been received electronically. However, for
the purpose of realization of Demand Draft, and FDR / Bank Guarantee / DD bidder shall send
the same in original through R.P.A.D. so as to reach to ‘Municipal Commissioner, NADIAD
MUNICIPAL CORPORATION within mentioned in NIT (Days) from the last day of bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in original to
Municipal Commissioner / Tender Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online NIT
at website https://www.nprocure.com in the presence of the bidders or their authorized
representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will
be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on ………………………………at ………………………..hrs. at the office
of to clarify the issues and to answer questions on any matter that may be
raised at that stage as stated in clause 9.2 of ‘instructions to Bidders’ of the bidding
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the tender
submission date and time. After the tender submission date and time, the bidder cannot
modify / edit / withdraw their submitted offer in any case. No written or online request in
this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are
liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the bidder
will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format
given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly in
electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past, it
shall not be deemed to be a ground / reason for not giving required information for this
L. Information supplied for earlier projects shall not be considered while evaluation of this
bid. The Government will not ask for any other information, unless it is found absolutely
necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
INSTRUCTIONS TO BIDDERS (ITB)
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 8 19. Sealing & Marking of Bids
2. Source of Funds 8 20. Deadline for Submission of
3. Eligible Bidders 8 21. Late Bids
4. Qualification of the 8 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 16 E. Bid Opening and Evaluation
7. Site Visit 16 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding Documents 17 26. Examination of Bids and
Determination of
9. Clarification of Bidding 17 27. Correction of Errors
10. Amendment of Bidding 18 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 19 F. Award of Contract
13. Bid Prices 19 31. Award Criteria
14. Currencies of Bid and Payment 20 32. Employer’s Right to Accept
any Bid and to Reject any or all
15. Bid Validity 20 33. Notification of Award and
Signing of Agreement
16. Bid Security 20 34. Performance Security
17. Alternative Proposals By 21 35. Advance Payment and Security
18. Format and Signing of Bid 21 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as defined in
these documents and referred to as ‘the works”) detailed in the table given in IFB. The bidders may
submit bids for any or all of the works detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended completion date
specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives (bidder/
tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat / Govt. of India for
centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a statement that the
Bidder is neither associated, nor has been associated, directly or indirectly, with the consultant or any
other entity that has prepared the design, specifications, and other documents for the Project or
being proposed as Project Manager for the Contract. A firm that has been engaged by the Employer
to provide consulting services for the preparation or supervision of the works, and any of its affiliates,
shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a preliminary
description of the proposed work method and schedule, including drawings and charts, as necessary.
The proposed methodology should include a program of construction backed with equipment
planning and deployment duly supported with broad calculations and quality assurance procedures
proposed to be adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
4.2 In the event that Pre-qualification of potential bidders has been undertaken, only bids from
prequalified bidders will be considered for ward of Contract. These qualified bidders should submit
with their bids any information updating their original prequalification applications or, alternatively,
confirm in their bids that the originally submitted prequalification information remains essentially
correct as of date of bid submission. The update or confirmation should be provided in Section 2. A
copy of the original prequalification application and the letter of prequalification should also be
furnished. With the updated information, the bidder must continue to be qualified in accordance with
the criteria laid down in the prequalification document. All bidders shall also furnish the following
information in Section
(i) Evidence of access to or availability of credit facilities (minimum 10% of estimated cost)
certified by the bankers.
(ii) Undertaking that bidder would be able to invest a minimum of cost up to 25% of the contract
value of work, during implementation of contract.
(iii) Proposal, if any, for sub-contracting of elements of work, costing more than 10% of the bid
(iv) Power of attorney.
(v) Latest income tax clearance certificate from concerned department.
4.3 If the Employer has not undertaken prequalification of potential bidders, all bidders shall include the
following information and documents with their bids in Section 2:
(a) copies of original documents defining the constitution or legal status, place of registration, and
principal place of business; written power of attorney of the signatory of the Bid to commit the
(b) total monetary value of construction work performed for each of the last five years;
(c) experience in works of a similar nature and size for each of the last five years, and details of works
underway or contractually committed; and clients who may be contacted for further information on
those contracts;
(d) major items of construction equipment proposed to carry out the Contract;
(e) qualifications and experience of key site management and technical personnel proposed for
(f) reports on the financial standing of the Bidder, such as profit and loss statements and auditor's
reports for the past five years;
(g) evidence of access to line(s) of credit and availability of other financial resources facilities (10% of
contract value), certified by the Bankers (Not more than 3 months old)
(h) undertaking that the bidder will be able to invest a minimum cash up to 25% of contract value of
work, during implementation of work.
(i) authority to seek references from the Bidder's bankers;
(j) information regarding any litigation, current or during the last five years, in which the Bidder is
involved, the parties concerned, and disputed amount;
(k) proposals for subcontracting components of the Works amounting to more than 10 per cent of the
Bid Price (for each, the qualifications and experience of the identified sub-contractor in the relevant
field should be annexed); and
(l) the proposed methodology and programme of construction, backed with equipment planning and
deployment, duly supported with broad calculations and quality control procedures proposed to be
adopted, justifying their capability of execution and completion of the work as per technical
specifications within the stipulated period of completion as per milestones (for all contracts over Rs.5
4.4 Bids from Joint ventures are not acceptable.
Bids from prequalified firms or prequalified joint-ventures only will be acceptable.
4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail criteria
regarding the Applicant’s general and particular experience, personnel and equipment capabilities
and financial positions, as demonstrated by the applicant’s responses in the forms attached to the
letter of application ( specified requirement for joint ventures are given under para 4.6 below )
Subcontractors experience and resources shall not be taken in to account in determining the
applicants compliance with the qualifying criteria to qualify for more than one contract, the
applicant must demonstrate having experience and resources sufficient to meet the aggregate of
the qualification criteria for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year (2025-26)
Following enhancement factors will be used for the costs of works executed and the financial figure to
a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Applicant should indicate actual figures of costs and amount for the works executed by them
without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the above
enhanced multiplying factors will not be applied. Instead, the current market exchange rate (State
Bank of India BC Selling rate as on the last date of submission of the bid) will be applied for the
purpose of conversion of the amount in foreign currency into India rupees.
4.5.3. General Experience.
To qualify, each bidder in the same name and style should have achieved the following performances:
List of Mandatory documents to be submitted
a. Registration Class in Civil Work – B Class & Above civil contractor.
b. EMD and Tender Fee
c. Solvency Certificate
e. Bid Capacity (For the purpose of calculating Bid Capacity, the bidder must submit a Chartered Accountant
Certificate confirming their financial capacity, a list of ongoing works along with corresponding Work Orders,
and a notarized affidavit detailing the ongoing works, executed on a ₹300/- Non-Judicial Stamp Paper. Failure to
submit any of these documents in the prescribed format will lead to disqualification of the bidder from the
evaluation process).
f. Document supporting similar nature of work & physical criteria
g. ITR for Last 3 Year, PAN card, GST Certificate
h. ESIC/EPF Certificate
i. Site Visit Certificate authorised by Municipal corporation
j. Declaration of Non-Blacklisted / Debarred from Anywhere in Gujarat & also in India. The Declaration will be
on the Rs.300/- non-judicial paper should be submitted (Mandatory)
If bidder fails to submit above documents or mandatory criteria are not fulfilled, bidder shall be considered as
not qualified and their financial bid shall not be open. To qualify, each bidder in the same name and style should
have achieved the following performances:
a. Registration: A certificate of registration as approved contractor of concerned state government/Railway
/CPWD/ Government Bodies. The Applicant(s) who are registered with other government (State/Central), Board,
Corporation, & Government undertaking/ Organizations of state & central government in including all public
sector units shall submit proof of application for registration for “B” Class & Above in Civil work in Gujrat State
(Scanned Copy). Also, the bidder should have electrical Licence from R & B.
b. EMD and Tender Fees
As per tender notice.
c. Solvency Certificate
Bank Solvency of minimum Rs. 50,00,000/- Solvency Value Certificate of the organization should be of current
calendar Year issued by Nationalized Bank or Bank listed as per latest GR of. Finance Department GR. No:
FD/MSM/e file/4/2023/0057/DMO, Date: 21.04.2023. Such certificate should be issued on Banker’s letter head.
A valid Bank Solvency Certificate means it must be issued within 12 months prior to the last date of Tender
4.5.3.1 TURNOVER:
Bidder must have achieved minimum average annual financial turnover (at current price level) from
contract receipt of works (in all classes of civil engineering construction works only) of Rs 1,25,00,000/-in
Last three financial years i.e., from April 2022 to March
The details pertaining to turnover for the year April 2022 to March 2025 shall be certified by Chartered
Accountant on his own letter head and duly attested. Turnover of financial year 2025-26 shall be
considered subject to submission of provisional/audited certificate from chartered accountant by the
4.5.3.2 SIMILAR NATURE OF WORK:
The bidder must have completed similar nature of work i.e Any type of Civil work during last 7 years
ending last day of month previous to the one in which applications are invited should be either of the
One similar completed work costing not less than the amount equal to Rs. 2,00,00,000/-
Two similar completed works costing not less than the amount equal to Rs 1,25,00,000/-
Three similar completed works costing not less than the amount equal to Rs. 1,00,00,000/-
4.5.3.3 AVAILABLE BID CAPACITY
The Bidder who fulfils the qualifying criteria mentioned above shall be qualified only if he fulfils the
requirement of bidder’s capacity. The bidding capacity of any tender/ Bidder is required to be more than
or equal to the estimated cost of the work i.e., Rs.2,50,00,000/-. The bidder’s capacity shall be computed
as shown below.
Available Bid Capacity = [(A x N x 2.0) - B)]
Maximum value of construction works executed in any one year during the last Five years updated at
the financial year updated at 2025-26 Price level.
B = Value of the existing commitments as on date of bid submission for works (complete or partial) to be
completed in the next (12 months). The details shall be countersigned by the Executive Engineer or
the equivalent officer of the employer on whose behalf the firm is carrying out the works.
Also, declaration of financial liabilities, work on hand/completed projects on Rs.300/- non-Judicial
In the case of a Joint Venture (Not Applicable), parameters A and B shall be determined based on
details pertaining to such partners who propose to undertake physical execution of work and in
proportion to their participation/stake as specified in respective clause in the tender documents.
N = Years prescribed for completion of the work for which bids are invited. - (12 Months)
If the Tender has been invited as a Package/Slice Minimum aggregate required Bid Capacity shall be considered
and accordingly the Bidder may qualify for less number of Packages/Slices. In case of individual Tenders (not
invited in a single Basket) the Bidder may qualify for a particular work (based on his Technical Bid), but at the time
of evaluation of Price Bid, if a greater number of such individual Bids are evaluated simultaneously, aggregate Bid
Capacity shall be considered. In such a case, if the Bidder does not have adequate capacity for all the Bids in which
his Bid is the lowest responsive Bid, he may be considered for a smaller number of Bids. Decision of the Employer
based on the least cost combination as may be the most advantageous to Competent authority shall be final and
binding to all the Bidders.
(a) The statement showing the value and details of completed works, existing commitments and ongoing works
as well as the stipulated period of completion remaining for each of the work listed should be countersigned
by the officer not below the rank of an Engineer-In-Charge.
(b) The certificate for past performance should be as per prescribed Performa in Form11...
(c) The Bidders are required to upload latest client’s certificates in Form-11 (or in any format with yearly
breakup) obtained from the concerned authorities/ employers towards proof of their having executed
contracts satisfactorily along with their bids. The quantities involved should be certified by the top executive
of the firm in the prescribed Performa in Form 11 (or in any format with yearly breakup) of Volume-I.
(d) Physical and Financial Performance of Any Work Not Supported By Client Certificate in Form-11 or In Any
Form Will Not Be Considered For Qualification.
(e) The applicant Bidder must provide by uploading evidence of having adequate experience. The bid should
include supporting certificate or report relating to physical, financial, technical and other capability of Bidder
in their original language along with certified translation of relevant portion of the certificate/ report in
English. The Bidder should furnish the information about financial capability in Rupees only.
(f) Depending upon the actual bid capacity assessed and other qualifying requirements, the applicant will be
qualified for the work.
(g) The bidder is required to submit the declaration of his financial liabilities, work on hand/completed projects
on Rs.300/- non-Judicial stamp paper. In case of false statement/ declaration the bidder shall be liable for
penal action. Further, the details furnished in the relevant form as per tender should be in line to the
declaration by the bidder.
(h) The criteria mentioned above at shall be evaluated based on the details submitted with the documents. Such
bidder shall have to submit the details in the prescribed Performa which are applicable to them. Bidders
should read the note under each Form/Annexure carefully and submit the details accordingly.
(i) Turnover of previous year and cost of completed / executed similar nature of work/ O&M shall be given
additional weightage of ten percent per year to bring them to 2025-26 Price level to account for price
escalation as illustrated below:
Effective cost of executed work
Turnover/ Cost of Executed
Financial Year at previous completed financial
year’s price level
(i) Financial year means period beginning from the 1st April to 31st March of the next year.
(ii) The details pertaining to Turnover for the year 2019-20 to 2025-26 and the details pertaining to Net Cash
Accrual, Net Worth and Net Working Capital for the year 2019-20 to 2025-26 shall be certified by Chartered
Accountant on his own letter head and duly attested. The cost of material supplied by the Government/
Client shall not be taken into account for experience against Turnover & Similar nature of work.
PHYSICAL CRITERIA:
The bidder must have successfully carried out minimum quantities of the following work in any one
project during last Seven (7) i.e., 2019-20 to 2025-26 and up to one month prior to last date of submission
4.5.3.4 Pipeline Work
A. Metallic Pipeline:
Procure, Lowering, Laying, Jointing, Testing and Commissioning of minimum length (as under) of metallic
pipeline in any single project during last Seven (7) financial years i.e., 2019-20 to 2025-26 and up to one
month prior to last date of submission of the bid. If the pipeline work has been completed along with
successful hydro testing, such works shall also be considered for the evaluation based on the facts and
circumstances as certified by the client.
The material supplied by the client will not be considered for procurement purpose.
Type of Pipeline Min. Diameter Min. Length
Metallic ≥ 600 mm ≥ 0.95 Km
B. Non Metalic Pipeline
Procure, Lowering, Laying, Jointing, Testing and Commissioning of minimum length (as under) of non metallic
pipeline in any single project during last seven (7) financial years i.e., 2019-20 to 2025-26 and upto one
month prior to last date of submission of the bid. If the pipeline work has been completed along with
successful testing, such works shall also be considered for the evaluation based on the facts and
circumstances as certified by the client.
The material supplied by the client will not be considered for procurement purpose.
Type of Pipeline Min. Diameter Min. Length
Non metallic ≥ 110 mm ≥ 15.89 Km
4.5.3.5 Pumping Machinery:
The bidder must have experience of supply, installation, testing and commissioning of electro mechanical
works not less than 178 KW in single contract during last Seven (7) financial years i.e., 2019-20 to 2025-26
and up to one month prior to last date of submission of the bid.
4.5.3.6 ELEVATED STORAGE RESERVOIR:
Bidder must have experience in Construction of Elevated Water Storage Reservoir of at least 2.50 LL in single
completed project during last seven (7) financial years i.e. from 2019-20 to 2025-26 and up to one month
prior to last date of submission of the bid.
4.5.3.7.UG SUMP:
Bidder must have experience in Construction of Storage Sump of at least 7.50 LL(single capacity) in single
completed project during last seven (7) financial years i.e. from 2019-20 to 2025-26 and up to one month
prior to last date of submission of the bid.
Bidder must have experience in Construction of Storage Sump of at least 15.00 LL(cumulative capacity) in
single completed project during last seven (7) financial years i.e. from 2019-20 to 2025-26 and up to one
month prior to last date of submission of the bid.
4.5.3.8. Intake well:
Bidder must have experience of Construction of intake well with approach bridge in wet conditions in any
single contract during last seven financial year’s i.e. from 2019-20 to 2025-26 & up to one month prior to last
date of submission of the bid.
Bidder must have experience in Construction & Commissioning of Water Treatment Plant with all allied
equipment used in WTP of at least 6 MLD of single capacity in any single project during last seven (7) financial
years i.e. from 2019-20 to 2025-26 and up to one month prior to last date of submission of the bid.
The bidder who does not meet this requirement shall associate with another technology provider/
manufacturer having stipulated experience as mentioned above. The memorandum of understanding for the
said collaboration shall be executed on Rs. 100/- non judicial stamp paper duly signed by respective
authorized representatives and notarised. The experience certificate along with MOU shall be submitted with
the bidding document.
EXPERIENCE IN DESIGN, CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING:
The bidders must have experience of design and execution of WTP of any technology to the tune of at least
3.60 MLD, in any single completed project.
The Bidder shall provide the information about their general experience in this regard in Application Form
3(A). Bidders are required to substantiate the information by submission of appropriate client certificates.
All WTP as referred should have been completed during last Seven (7) financial years i.e., from 2019-20 to
2024-25 and up to one month prior to last date of submission of the bid and shall have been in successful
operation for at least one year immediately preceding one month prior to last date of bid submission. The
Bidder shall provide the information about the particular experience in this regard by submission of
appropriate client certificates. The WTP proposed should have been implemented in anywhere in India.
Bidders Experience Qualifying Requirement
For experience in WTP 3.60 MLD
4.5.3.10 Operation & Maintenance:-
The bidder shall have successfully commissioned at least one similar project (as narrated above) with operation
& maintenance for minimum 1 year after commissioning, inclusive of ` period, in single contract amounting to
Rs. 3,28,45,754/- in last Seven (7) years i.e., from 2019-20 to 2024-25 and one month prior to last date of
submission of bid.
Note: The amount of works shown above means project costs.
The bidder shall have successfully completed operation and maintenance for minimum 1 year in single contract
of similar nature (as narrated above) amounting to Rs. 2,03,254/- in last Seven (7) years from one month prior
to last date of submission of bid.
Note to 4.2 Physical Criteria:
I) The works for which bidder have not entered in to contract agreement will not be considered
II) The above experience shall be within last Seven (7) i.e., 2019-20 to 2025-26 and up to one month prior to last
date of submission of the bid for which Form -3A/11 must be submitted.
III) Experience as sub-contractor shall not be considered.
IV) The experience of works executed in Government (State/Central), Board, Corporation, and Government
Undertaking /Organizations of state & central government shall only be considered for evaluation. The
experience certificate from the client equivalent to not below the rank of Municipal Commissioner / Authority
shall be considered. The experience of sublet works shall not be considered.
V) The Bidder/JV MEMBER/MOU partners contract should not have been terminated/blacklisted/debarred in any
State Govt/ Municipal Corporations/ Central Govt./ Any state Govt Organization, Urban Local body and/or its
undertaking company or its SPV, Asian Development Bank/ World Bank or similar international funding
agencies organizations due to delay in projects during last five years.
VI) The works for which bidder have not entered in to contract agreement will not be considered.
VII) If the bidder claiming Technical/ Physical Eligibility Criteria for the works has completed any of the works in
joint venture with any other company then, along with the experience certificates, the firm shall submit the
joint venture agreement for that particular work. Experience certificates not accompanied by joint venture
agreement shall not be considered for evaluation. The credit for the bidder which has completed a work in
joint venture is allocated as follows:
(1) If the bidder has completed the work as a member in the project, then the bidder can claim credit for the
entire scope of the work in proportion to the stake (e.g., if the capacity of the ESR executed is 30 ML and if the
firm has executed the project as member with a 40% stake then the firm can claim credit for (40% x 30 ML)
ML works. A statutory auditor certificate specifying the payments received for the project should be
submitted. In the event of percentage participation in the project calculated through the statutory auditor
certificate differs from the percentage in the Joint Venture Agreement (If applicable), the percentage
participation calculated through payments received shall be considered for evaluation purposes.
Note: The above condition shall also apply to Clause No. 4.2.2 ‘Similar Nature of work’ under financial criteria.
5.0 Bidder should fulfil the following criteria mentioned under Clause 4.0, Minimum Qualifying Criteria. If not
fulfilled, he will be out rightly rejected.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per Appendix.
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment to
attain the completion of works in accordance with the prescribed construction schedule are
shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid, a detailed
construction planning and methodology supported with layout and necessary drawings and
calculations to allow the employer to review their proposals. The numbers, types and capacities of
each plant/equipment shall be shown in the proposals along with the cycle time for each
operation for the given production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and / or credit
facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must demonstrate
the soundness of the applicant’s financial position, showing long – term profitability including an
estimated financial projection for the next two years If necessary, the employer will make inquiries
with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting from
contracts completed or under execution by him over the last five years. A consistent history of
awards against the Applicant or any partner of a joint venture may result in failure of the
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if they
Made misleading or false representation in the forms, statements submitted, and / or Record of
poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non – performance of the contractor; consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy. The rescinding of contract of a joint
venture on account of reasons other than non – performance, such as Most Experienced partner
of joint venture pulling out, court directions leading to breaking up of a joint venture before the
start of work, which are not attributable to the poor performance of the contractor will, however,
not affect the qualification of the individual partners.
4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others) (Applicable only
for estimated project cost of 50 Crore and above) – JV NOT APPLICABLE
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para 4.5.3 & 4.5.6
above. The joint venture must collectively satisfy the criteria of para 4.5.3 & 4.5.6 above.
The experience of the other joint venture partners shall be considered if it is not less than
30 percent of the qualifying criteria in para 4.5.3 & 4.5.6 above.
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be submitted
with a copy of the joint venture agreement providing the joint and several liabilities with respect
to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners individually or as a
partner in any other joint venture. In case dissolution of a joint venture, each one of the
constituent firms may qualify if they meet all the qualification requirements, subject to the written
approval of the Employer.
4.7. Bid Capacity.
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be disqualified if
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or Record of poor
performance such as abandoning the works, not properly completing the contract, inordinate
delay in completion, litigation history, or financial failures etc.; and/ or participated in the
previous bidding for the same work and had quoted unreasonably high bid prices and could
not furnish rational justification to the employer.
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or participates in more
than one bid (other than as a subcontractor or in cases of alternatives that have been permitted or
requested) will cause all the proposals with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid, and the
Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the Site
of work and its surrounding and obtain all information that may be necessary for preparing the Bid
and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda issued in
accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
11 Extent of work VI
8.2. Volumes I, II, III, IV and VI are available online and documents to be furnished by the bidder in
compliance to section 2 will be prepared by him and furnished as Volume- V in two parts (refer
8.3. The bidder is expected to examine carefully all instructions, conditions of contract, contract data,
forms, terms, technical specifications, bill of quantities, forms, Annexes and drawings in the Bid
Document. Failure to comply with the requirements of Bid Documents shall be at the bidder’s own
risk. Pursuant to clause 26 hereof, bids which are not substantially responsive to the requirements
of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify the
Employer in writing or through E-mail at the Employer’s address indicated in the invitation to
bid. The Employer will respond to any request for clarification which he received earlier than
days prior to the deadline for submission of bids. Employer’s response will be published on
website including a description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will take
place at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any matter that
may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the Employer
not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website i.e.
www.nprocure.com. Any modification of the bidding documents listed in sub-Clause 8.1 which
may become necessary as a result of the pre-bid meeting shall be made by the Employer
exclusively through the issue of an Addendum pursuant to Clause 10 and not through the
minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by
issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will assume no
responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his discretion, extend as necessary the deadline for
submission of bids, in accordance with Sub-Clause 20.2 below.
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1) shall be in
two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e. technical as
well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
11 Extent of work VI
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the priced Bill
of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words) for all items
of the Works described in the Bill of Quantities along with total bid price (Both in figures and
words). Items for which no rate or price is entered by the bidder will not be paid for by the Bill of
13.3 All duties, taxes, and other levies except GST payable by the contractor under the contract, or for
any other cause shall be included in the rates, prices and total Bid Price submitted by the Bidder.
(GST will be paid extra)
13.4 The rates and prices quoted by the bidder are subject to adjustment during the performance of the
Contract in accordance with the provisions of Clause 47 of the Conditions of Contract (For contracts
more than12 Monthss period).
13.5 The rates and prices quoted by the bidder are subject to adjustment during the performance of
the Contract in accordance with the provisions of Clause 47 of the Condition of Contract
(Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All payments
shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 180 days after the deadline date forbid
submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may request
that the bidders may extend the period of validity for a specified period. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid, but will be required to extend the validity of his security for a period
of the extension, and in compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in column 4 of
the table of IFB for this particular work. This Bid security shall be in favor of Employer as named in
Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume III. (Bank
Guarantee is applicable only for Bid Estimated Amount of 01 Crore and above) and Bank
Guarantee of Schedule and Private Banks shall be considered as per GoG Finance
Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date 21/04/2023 or as
per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank approved by
the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar Department of
Govt of Gujarat. Exemption Certificate is applicable only when Registration Certificate of
Appropriate Class and Category of Approved Contractors is required as eligible criteria of
bidder.(EMD Exemption not allowed)
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall
be valid for 45 days beyond the validity of the bid i.e. total validity of 180+45 = 225 Days
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated in Sub-
Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the bid
validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed the
Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not
respond in time, his Bid Security (EMD) will be forfeited and his tender will be rejected.
Punitive action will be taken on such contractors. (As per GoG R&B Dept’s Gr. No.
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding documents,
including the conditions of contract (including mobilization advance or time for completion), basic
technical design as indicated in the drawing and specifications. Conditional offers or alternative
offers will not be considered further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate parts to be uploaded.
D. SUBMISSION OF BIDS
19. Sealing and Marking of Bids
19.1. The Bidder shall submit the bid namely, Technical Proposal & Financial Proposal through online by
the help of Digital Signature Certificate.
-Technical Bid: To be opened on ______ at 12.00 Hrs. (date of Technical Bid opening) in the
presence of Evaluation Committee.
-Financial Bid: Not to be opened except with the approval of Evaluation Committee The contents
of Technical and Financial Bids will be as specified in clause
19.2. The inner, outer, and separate envelopes containing Technical and Financial Bids shall
(A) be addressed to the Employer at the address given in Appendix
(B) bear the identification as indicated in Appendix.
19.3. In addition to the identification required in Sub-Clauses 19.1 and 19.2, each of the envelopes shall
indicate the name and address of the bidder to enable the bid to be returned unopened in case it
is declared late, pursuant to Clause 21, or the Evaluation Committee declares the bid as non
responsive pursuant to Clause
19.4. If the outer envelope is not sealed and marked as above, the Employer with assume no
responsibility for the misplacement or premature opening of the bid.
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website specified above not
later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with Clause 10, in which case all right and obligation of the Employer and the bidders
previously subject to the original deadline will then be subject to the new deadline.
21.1. Any Bid received by the Employer after the deadline prescribed in Clause 20 will be returned
unopened to the bidder.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in Clause 20 or
pursuant to Clause
22.2 Withdrawal or modification of a bid between dead line for submission of bids and the expiration of
the original bid validity specified in Clause 15.1 above or as extended pursuant to Clause 15.2 may
result in the forfeiture of the Bid Security pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids and the
expiration of the original period of bid validity specified in Clause 15.1 above or as extended
pursuant to Clause 15.2 may result in the forfeiture of the Bid security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to Clause 22, in
the presence of the Bidders or their representatives who choose to attend at time, date and the
place specified in Appendix in the manner specified in Clauses 20 and 23.3, In the event of the
specified date of Bid opening being declared a holiday for the Employer, the Bids will be opened
at the appointed time and location on the next working day.
23.2. Envelopes marked "WITHDRAWAL" shall be opened and read out first. Bids for which an acceptable
notice of withdrawal has been submitted pursuant to Clause 22shall not be opened.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security furnished
with each bid will be announced. If the bid security furnished does not conform to the amount and
validity period as specified in the invitation for bid (ref. Column 4 and paragraph 3), and has not
been furnished in the form specified in Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied with
valid bid security will be taken up for evaluation with respect to the Qualification
information and other information furnished in part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification Documents with
respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the Evaluation
Committee will finalize the list of responsive bidders whose financial bids are eligible for
23.5. If, as a consequence of the modifications carried out by the bidder in response to sub-clause
23.4, the bidders desire to modify their financial bid, they will submit the modification in
separate sealed envelope so as to reach the Employer's address (refer sub-clause 19.2) before
the opening of the financial bid as intimated in the clarification letter (refer sub-clause 23.4). The
envelope shall have clear marking "MODIFICATION TO FINANCIAL BID-Not to be opened except
with the approval of the Evaluation Committee"
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be opened.
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and
such other details as the Employer may consider appropriate, will be announced by the Employer
at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be opened.
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and
such other details as the Employer may consider appropriate, will be announced by the Employer
at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the “Financial Bid”
shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information disclosed to
those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids and
recommendations for the award of a contract shall not be disclosed to Bidders or any other
persons not officially concerned with such process until the award to the successful Bidder has
been announced. Any effort by Bidder to influence the Employer’s processing of Bids or award
decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his
discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates. The
request for clarification and the response shall be in writing or by e- mail, but no change in the
price or substances of the Bid shall be sought, offered, or permitted except as required to confirm
the correction of arithmetic errors discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to his Bid
opening to the contract is awarded. If the Bidder wishes to bring additional information to the
notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid comparison
or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether each Bid (a)
meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly signed; (c) is
accompanied by the required securities and; (d) is substantially responsive to the requirements of
the Bidding document. During the detailed evaluation of the “Financial Bid”, the responsiveness of
the bids will be further determined with respect to the remaining bid conditions, i.e., priced bill of
quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions and
specifications of bidding documents, without material deviation or reservation. A material
deviation or reservation is one (a) which affects in any substantial way the scope, quality, or
performance of the Works; (b) which limits in any substantial way, inconsistent with the Bidding
documents, the Employer’s rights or the Bidder’s obligations under the Contract; or (c) whose
rectification would affect unfairly the competitive position of other Bidders presenting
substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and may not
subsequently be made responsive by correction or withdrawal of the non-conforming deviation or
27. Correction of Errors
27.2 "Financial Bids" determined to be substantially responsive will be checked by the Employer for any
arithmetic errors. Errors will be corrected by the Employer as follows:
(a) where there is a discrepancy between the rates in figures and in words, the rate in words will
(b)where there is a discrepancy between the unit rate and the line item total resulting
from multiplying the unit rate by the quantity, the unit rate as quoted will govern.
27.2 The amount stated in the "Financial Bid" will be corrected by the Employer in accordance with the
above procedure and the bid amount adjusted with the concurrence of the Bidder in the following
a) If the Bid price increases as a result of these corrections, the amount as stated in the bid will
be the 'bid price' and the increase will be treated as rebate;
b) If the bid price decreases as a result of the corrections, the decreased amount will be
treated as the 'bid price'
Such adjusted bid price shall be considered as binding upon the Bidder. If the Bidder does not accept the
corrected amount the Bid will be rejected, and the Bid security may be forfeited in accordance with Sub-
Clause 16.6 (b).
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially responsive
in accordance with Sub-Clause 26.2.
29.2. In evaluating the Bids, the employer will determine for each Bid the evaluated Bid Price by adjusting
the Bid Price as follows.
a) Making any correction for errors pursuant to Clause 27; or
b) making an appropriate adjustments for any other acceptable variations, deviations; and
c) making appropriate adjustments to reflect discounts or other price modifications offered in
accordance with Sub-Clause
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation and
deviations and other factors, which are in excess of the requirements of the Bidding documents or
otherwise result in unsolicited benefits for the Employer, shall not be taken in to account in Bid
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the Conditions of
Contact, during the period of implementation of the Contract, will not be taken in to account in
Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s estimate of
the cost of work to be performed under the contract the Employer may require the Bidder to
produce detailed consistency of those prices with the construction methods and schedule
proposed. After evaluation of the price analyses, the Employer may require that the amount of the
performance security set forth in Clause 34 be increased at the expense of the successful /bidder
to a level sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically priced low and
which cannot be substantiated satisfactorily by the bidder may be rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has been
(i) to be substantially responsive to the Bidding documents and who has offered the lowest
evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which is the
lowest evaluation in any of the packages opened earlier than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity is less
than the evaluated bid price, even if the said bid is the lowest evaluated bid. The contract will in
such cases be awarded to the next lowest bidder at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid, and to
cancel the Bidding process and reject all Bids, at any time prior to the award of contract, without
thereby incurring any liability to the affected bidder or Bidder or any obligation to inform the
affected Bidder or Bidders of the grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by cable, telex or facsimile confirmed by registered letter. This
letter (hereinafter and in the condition of contract called the “Letter of Acceptance”) will state the
sum that the Employer will pay the Contractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the furnishing
of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful Bidder.
It will be signed by the Employer and to the successful Bidder, within 28 days following the
notification of award along with the Letter of Acceptance. Within 21 days of receipt, the successful
Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
34.1. Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall furnish to the
Employer an irrevocable and unconditional guarantee from a Bank in the form set forth in Section
(the “Performance Security”) for an amount equal to 5% (five percent) of its Contract Price. In case
of bids mentioned below, the successful Bidder, along with the Performance Security, shall also
furnish to the Authority an irrevocable and unconditional guarantee from a Bank in the same form
given at Section 8 towards an Additional Performance Security (The “Additional Performance
Security”) for an amount calculated as under:
DEFECT LIABILITY
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but upto 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated @ 20% of
the difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus 10%
of the Estimated Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the Estimated Project
Cost, then the Additional Performance Security shall be calculated @ 30% of the difference in
the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance Security.
(D) The Performance Security shall be valid beyond 60(sixty) days of the Defects Liability Period
and the Additional Performance Security shall be valid beyond 28 (twenty-eight) days of
Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a Nationalized/Scheduled Indian
bank or (b) by a foreign bank located in India and acceptable to the Employer. As per GoG
Finance Department’s Circular No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as
per their latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
36. Dispute Review Expert
36.1 The Employer proposes that [name of proposed Dispute Review Expert as indicated in Appendix]
be appointed as Dispute Review Expert under the Contract, at a daily fee as indicated in
Appendix plus reimbursable expenses. If the Bidder disagrees with this proposal, the Bidder
should so state in the Bid. If in the Letter of Acceptance, the Employer has not agreed on the
appointment of the Dispute Review Expert, the Dispute Review Expert shall be appointed by the
Council of Indian Roads Congress at the request of either party.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in completing for the contract in question and will
declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a
contract with National Highways Authority of India/ State PWD and any other agencies, if it at any
time determines that the firm has engaged in corrupt or fraudulent practices in completing for
the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the Conditions
APPENDIX TO ITB
Clause Reference with respect to Section –I
1. The Name of the Employer is [ Cl.1.1]
Deputy Municipal Commissioner Nadiad Municipal Corporation
2. The last seven years.
2025-2026(Base Year)
3. This Annual Financial Turnover Amount is Rs. 1,25,00,000/- [Cl.4.5.3 (a)]
4. Value of Work is Rs. 2,50,00,000/-
6. The cost of electric work is Rs. __________/-
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities is Rs. ………… [Cl.4.5.6 ]
9. Price level of the financial year 2025/26 [Cl. 4.5.2]
10. The pre-bid meeting will take place at Nadiad Municipal Corporation [Cl. 9.2.1]
11. The technical Bid will be opened at the office of the Dy. Municipal
Commissioner, Nadiad Municipal Corporation on dt at ………AM/PM
12. Address of the Employer: Nadiad Municipal Corporation
13. Identification :
( name of Contract)
- Bid reference No ___ of Nadiad Municipal Corporation - ( insert number)
- Do not open before as per NIT - ( time and date )
14. The bid should be submitted latest by As stated on online NIT [Cl. 20.1 & 20.2]
15. The bid will be opened at Nadiad Municipal Corporation As stated on online [Cl. 23.1 ]
16. The Bank Draft in favor of Municipal Commissioner, Nadiad Municipal
17. The name of Dispute Review Export is to be intimated later on
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they propose to use on the
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work (Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work as under:
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be
executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is more than
Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but more than
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be executed is less
than Rs. 5 lakhs. The Engineer so employed for the Government work must have sufficient
experience to handle the work independently. Such an Engineer shall have to stay at the site of work
and he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of
a separate Engineer will not be necessary provided that the Engineer partner himself attends the
execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy Municipal
Commissioner-in-charge of the work the Name, Qualifications, copy of mark sheet, Colour
Photograph and the appointment order issued such engineers engaged for this contract work. If
days after issue of work order such designated Site Engineers do not resume or do not remain
present on site of work, the recovery at the rate of Rs.15,000-00 per month per Engineer will be
made from the bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the purpose of
post qualification as provided for in Clause 4 of the Instruction to Bidders. This information will not be
incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions
Work performed in the last five years
Work performed as prime contractor, work performed in the past as a nominated sub-contractor
will also be considered the sub-contract involved execution of all main items of work described in
the bid documents, provided further that all other qualification criteria are satisfied (in the same
name) on works of a similar nature over the last five years and in current year before the
submission of the bid.
Project Name of Description of Contract Value of Date Stipulated Actual date of Remark
Name the work No. contract of period of completion explaining
Employer (Rs. issue completion reasons for
Crore) of delay &
order Completed
Attach certificate(s) from the Engineer(s)in-charge
Immediately preceding the financial year in which bids are received.
1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a nominated sub-
contractor, will also be considered provided the sub-contract involved execution of all main items
of work described in the bid document, provided, further that all other qualification criteria are
called (in the same name and style) in the last five years and in current year before the submission
Year Name Name of Quantity of work performed (Cum/MT) Remarks
of the the Cement Masonry Earth Bituminous (indicate
work Employer Concrete Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet
to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description of Place Contract Name & Value Stipulated Value of Anticipated
works & No. Address of Contract Period of Works of
State Employer (Rs. Cr) Completion remaining completion
Attach certificate (s) from the Engineer(s) in-charge
Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause 4.5.5).
The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and execution of the
contract. Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions of Contract.
Position Name Qualification Year of Year of experience
Experience in the proposed
(General) position
Project Manager &
1.7 Proposed sub-contract and firms involved
Sections of the works Value of Sub- Sub-Contractor (Name Experience in
Contractor & similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary
work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors’
reports (in case of companies/corporations), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand,
lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may provide
references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party (ies) Employer Cause of Amount Remarks showing
Dispute Involved Present Status
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to Bidders.
(Name of Consultant engaged for project preparations is ............................................................. )
1.13 Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts
as necessary to comply with the requirements of the Bidding documents. (Refer ITB Clause 4.1)
1.15 Quality Assurance Plan
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
(iii) Update of original prequalification application. ()
(iv) Copy of original prequalification application ( )
(v) Copy of prequalification letter ( )
Delete, if prequalification has been carried out.
Fill the Name of Consultant.
Delete, if prequalification has not been carried out.
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT
(CLAUSE 4.5.6 OF ITB) BANK
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. To meet
their working capital requirements for executing the above during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required attachments
are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under Government of
Gujarat/Government of India nor any contract awarded to us for such works have been
rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or corporation to
furnish pertinent information deemed necessary and requested by the Department to verify
this statement or regarding any (our) competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the Department/
Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake .................. that our firm M/s
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 40 37 Bill of Quantities
2 Interpretation 41 38 Changes in the Quantities
3 Language and Law 41 39 Variations
4 Engineer’s Decisions 41 40 Payments for Variations
5 Delegations 41 41 Cash Flow Forecasts
6 Communications 41 42 Payment Certificates
7 Sub-Contractors 42 43 Payments
8 Other Contractors 42 44 Compensations Events
9 Personnel 42 45 Tax
10 Employer’s & Contractor Risk 42 46 Currencies
11 Employers Risks 42 47 Price Adjustment
12 Contractor’s Risk 42 48 Retention
13 Insurance 42 49 Liquidated damages
14 Site Investigations Reports 43 50 Bonus
15 Queries about the Contract 43 51 Advance Payment
16 Contractors to Construct the works 43 52 Securities
17 The Works to be Completed By 43 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 43 54 Cost of Repair
20 Discoveries 43 E. Finishing the Contract
21 Possession of the Site 43 55 Completion
22 Access to the Site 44 56 Taking Over
23 Instructions 44 57 Final Account
24 Disputes 44 58 Operating and Maintenance
25 Procedure for Disputes 44
26 Replacement of Dispute Review Export 44 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 45 62 Release from Performance
28 Extensions of the Intended completion
29 Deleted 45 F. Special Conditions of
30 Delays Ordered by The 45 63 Labour
Engineer 64 Compliance with labour regulations
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
Conditions of Contract
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of Contract
but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer
in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute,
complete and maintain the Works till the completion of Defects Liability Period. It consists of
the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the
The Contractor is a person or corporate body whose Bid to carry out the Work has been
accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to
the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as
adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated
from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent person
appointed and notified to the contractor to act in replacement of the Engineer) who is
responsible for supervising the Contractor, administering the Contract, certifying payments due
to the Contractor, issuing and valuing Variations to the Contract, awarding extensions of time,
and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to
construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of
The Intended Completion Date is the date on which it is intended that the Contractor shall
complete the Works. The Intended Completion Date is specified in the Contract Data. The
Intended Completion Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation
Plant is any integral part of the work which is to have mechanical, electrical, electronic or
chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents and
are factual interpretive reports about the surface and subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any
modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall
commence execution of the works. It does not necessarily coincide with any of the Site Possession
A Subcontractor is a person or corporate body who has a Contract with the Contractor to
carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the
Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The Works are
what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also means
female or neuter and the other way around. Heading have no significance. Words have
their normal meaning under the language of the Contract unless specifically defined. The
Engineer will provide instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the Conditions of
Contract to the Works, the Completion date, and Intended Completion Date apply to any
Section of the Works (other than references to the Completion Date and Intended
Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters
between the Employer and the Contractor in the role representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other people after
notifying the Contractor and may cancel any delegation after notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are effective
only when in writing. A notice shall be effective only when it is delivered (in terms of
Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in contract
data, with the approval of the engineer but may not assign the Contract without the
approval of the Employer in writing. Subcontracting shall not alter the Contractor’s
obligations. Sub-contracting of supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the part of
work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of other
Contractor. The Contractors shall as refer to in the Contract Data, also provide facilities
and services for them as described in the Schedule. The employer may modify the
schedule of other contractors and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Contract Data to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed
replacement of key personnel only if their qualifications, abilities, and relevant experience
are substantially equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure that the
person leaves the Site within seven days and has no further connection with the work in
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks, and the
Contractor carries the risks which these Contracts states are Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they directly
affect the execution of the Works, the risks of war, hostilities, invasion, act of foreign
enemies, rebellion, revolution, insurrection or military or usurped power, civil war, riot
commotion or disorder (unless restricted to the Contractor’s employees), and
contamination from any nuclear fuel or nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death which
arise during and in consequence of the performance of the Contract other than the
excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,
insurance cover from the Start date to the end of the Defects Liability Period, in the
amounts and deductibles stated in the Contract data for the following events which are
due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer
for the Engineer’s approval before the Start Date. All such insurance shall provide for
compensation to be payable in the types and proportions of currencies required to rectify
the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required, the
Employer may affect the insurance which the Contractor should have provided and
recover the premiums the Employer has paid from payments otherwise due to the
Contractor or, if no payment is due, the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval of the
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports referred to
in the Contract Data, supplemented by any information available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the specification
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall carry
out the Works in accordance with the programme submitted by the Contractor, as
updated with the approval of the Engineer, and complete them by the Intended
Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary
works to the Engineer, who is to approve them if they comply with the Specifications and
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of the
Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary works
where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly discovered on
the site is the property of the Employer. The contractor is to notify the engineer of such
discoveries and carry out the Engineer’s instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If possession
of a part is not given by the date stated in the Contract Data the Employer is deemed to
have delayed the start of the relevant activities and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not handed
over to the Contractor, then contractor/ Employer may fore-close the contract.
Contractor/Employer has to foreclose the work within 30 days after lapse of 25%-time
limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer access
to the Site, to any place where work in connection with the Contract is being carried out
or is intended to be carried out and to any place where materials or plants are being
manufactured/ fabricated/ assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works which
comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and
records relating to the performance of the Contractor and to have them audited by
auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside
the authority given to the Engineer by the Contract or that the decision was wrongly
taken, the decision shall be referred to Deputy Municipal Commissioner (Higher
Authority)within 14 days of the notification of the Engineer's decision. If the issue is not
resolved, any party can refer the matter for conciliation within 15 days from the decision
given by the Dy. Municipal Commissioner.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision
of the Dy. Municipal Commissioner, both the parties have to refer to the Municipal
Commissioner, Nadiad Municipal Corporation concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Dy. Municipal Commissioner, both the parties have to refer to the
Municipal Commissioner, Nadiad Municipal Corporation for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the dispute to
Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer
a claim / dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any additional payment/claim if
he doesn’t follow the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure
stated in the Special Conditions of Contract.
26. Replacement of Dispute Review Expert
26.1 Should the Dispute Review Expert resign or die, or should the Employer and the
Contractor agree that the Dispute Review Expert is not fulfilling his functions in
accordance with the provisions of the Contract, a new Dispute Review Expert will be
jointly appointed by the Employer and the Contractor. In case of disagreement between
the Employer and the Contractor, within 30 days, the Dispute Review Expert, shall be
designated by the Appointing Authority designated in the Contract Data at the request of
either party, within 14 days of receipt of such request.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the Engineer
for approval a Programme showing the general methods, arrangements orders, and
timing for all the activities in the works along with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual progress achieved
on each activity and the effect of the progress achieved on the timing of the remaining
work including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated programme at
intervals no longer than the period stated in the Contract data. If the Contractor does not
submit an updated programme within this period, the Engineer may withhold the amount
stated in the Contract data from the next payment after the date on which the overdue
programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s obligations. The
Contractor may revise the programme and submit it to the Engineer again at any time. A
revised programme is to show the effect of Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event occurs
or a Variation is issued which makes it impossible for completion to be achieved by the
Intended Completion Date without the Contractor taking steps to accelerate the
remaining work and which would cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended Completion
Date within 35 days of the Contractor asking the Engineer for a decision upon the effect of
a compensation event or Variation and submitting full supporting information. If the
Contractor has failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing the new
Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor for
extension of Intended Completion Date refer to the Employer his decision. The employer
shall in not more than 21 days communicate to the engineer the acceptance or otherwise
of the Engineer’s decision. If the employer fails to give his acceptance, the Engineer shall
not grant the extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any activity
within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a management
meeting. The business of a management meeting shall be to review the plans for
remaining work and to deal with matters raised in accordance with the early warning
31.2 The Engineer shall record the business of management meetings and is to provide copies
sthe parties for actions to be taken is to be decided by the Engineer either at the
management meeting or after the management meeting and stated in writing to all who
attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely future
events or circumstances that may adversely affect the quality of the work, increase the
Contract price or delay the execution of works. The Engineer may require the contractor
to provide an estimate of the expected effect of the future event or circumstance on the
contract price and completion date. The estimate is to be provided by the Contractor as
soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering proposals for
how the effect of such an event or circumstance can be avoided or reduced by anyone
involved in the work and in carrying out any resulting instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 : Defect liability period : The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed before the period
mentioned hereunder from the certified date of completion. The Engineer in charge shall
give the contractor a notice in writing about the defects and the contractor shall make
good the same within 15 days of receipt of the notice. In the case of failure on the part of
the contractor, the Engineer- in-charge may rectify or remove or re-execute the work at
the risk & cost of the contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the expenses, if any,
Incurred by him in rectification, removal or re-execution. The Defects Liability period shall
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be
Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put tender), the
period shall be 36 (Thirty Six) months from the certified date of completion or one
monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be 36 Months from the
certified date of completion which should include three monsoons.
(d) For original building works the defect liability period will be 4 years or elapse of
monsoon period following date of possession of building taken over by user agency
following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be treated as
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular No.TNC/10/2016/Clause 17A
(Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year from the
date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the contractor shall
have to give four years free maintenance guarantee from the certified date of
completion. During this period the contractor shall visit the site every six months
along with the concerned Section Officer / Deputy Municipal Commissioner and will
examine the work already carried out in this contract like road work, jungle cutting,
side shoulders, side gutter, road furniture, patta etc. and will prepare Km. wise
inspection report duly signed by all concerned and any defect observed shall be done
within 15 days by the contractor at his risk and cost as per the direction of Engineer in
charge. The contractor needs to do videography of these visits and require to submit
at the time of release of FMG. If B.T. the surface during the maintenance period of
years is worn out then agency shall have to provide renewal coating as per tender
item as directed by the Engineer-in- charge. The amount equivalent to 5% of each
running bill shall be withheld and will be released after the free maintenance
guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank guarantee
pledged in the name of Dy. Municipal Commissioner after completion certificate of
work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause for the
material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be withheld till
the miscellaneous items like earthwork in embankment / cutting for side shoulders,
side gutters, kilometer / indicator / guard stones, sign boards etc. are completed in all
respect by the contractor. After completion of the miscellaneous items, the above
said 2% withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as per Govt.
letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing more than Rs.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate equipment. Till the
setting up of adequate laboratory is completed & reported of this to the engineer
(subject to due verification by engineer’s representative) by contractor in writing,
Rs.2,00,000/- shall be withheld. The qualified quality Engineer shall be deployed
exclusively for this contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount equivalent to
Rs.20,000 per month shall be recovered till the actual deployment of quality engineer.
The amount so recovered towards the deployment of quality engineers shall not be
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/2006/35/C,
dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk and
cost, the existing lane(s) of the road so that the traffic worthiness and safety thereof
are at no time materially inferior as compared to their condition 10 (ten) days prior to
the date of the Agreement, and shall undertake the necessary repair and maintenance
works for this purpose; provided that the Contractor may, at his cost, interrupt and
divert the flow of traffic if such interruption and diversion is necessary for the efficient
progress of works and conforms to Good Industry Practice; provided further
that such interruption and diversion shall be undertaken by the Contractor only with
the prior written approval of the Dy. Municipal Commissioner which approval shall not
be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor
shall at all times be responsible for ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of any defects
that are found. Such checking shall not affect the Contractor’s responsibilities the
Engineer may instruct the Contractor to search for a Defect and to uncover and test any
work that the Engineer considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it does, the
Contractor shall pay for the test and any samples. If there is no defect the test shall be a
Compensation Event.
34.2 1% of the amount of work done should be deducted from R.A. Bill of the contractor for
testing the quality of material workmanship, irrespective of actual charges.
34.3 Agency has to establish testing laboratory on site for the various test to be carried out in
the work for this purpose agency shall construct a pukka laboratory building with all
facility on site at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the
defects Liability Period, which begins at Completion and is defined in the contract data.
The Defects Liability Period shall be extended for as long as Defects remain to be
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect
within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the Engineer’s
notice, the Engineer will assess the cost of having the Defect corrected, and the
Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation, testing and
commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid for the
quantity of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the original
specifications , drawings, designs and instructions that may appear to him to be necessary
or advisable during the progress of the work and the contractor shall be bound to carry
out the work in accordance with any instruction in this connection which may be given to
him in writing signed by the Engineer and such alteration shall not invalidate the contract
and any additional work which the contractor may be directed to do in the manner above
specified as part of the work shall be carried out by the contractor on the same conditions
in all respects on which he agreed to do the main work and at the same rate as are
specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by more
than 110%, the contractor will be paid for the quantity in excess of 110%, at the rate
entered in the SOR of the year during which the excess in quantity is first executed.
39.1 All Variations shall be included in updated programme produced by the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is specified in
this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the one
involving additional or altered class of work; where there are more than one comparable
items, the item of the contract which is nearest in comparison with regard to class or
classes of the work involved shall be selected and the decision of the Dy. Municipal
Commissioner as to the nearest comparable item shall be final and binding on the
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be
carried out at the rate entered in the Schedule of Rates of the division for the year in
which the tender was received, increased or decreased by the percentage by which the
tender amount is more or less as compared to the amount arrived at the rates in the
“Schedule of Rates” of the Division in the year in which the tender was received. If the
Schedule of rates of the Division does not contain all the items, the percentage increase or
decrease of the tender shall be calculated considering such items which were included in
the “Scheduled Rates” of the division for the year and for materials consumed on such
item the rate to be charged would be the basic rate taken into account for fixing the rate
in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be
carried out at the rate decided by the competent authorities on the basis of detailed rate
analysis after hearing the contractor before a Committee of two Municipal Commissioners
stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of
the Division is ordered to be carried out before the rate is agreed upon, then the
contractor shall within seven days of the date of receipt by him of the order to carry out
the work, inform the Engineer-in-charge of the rate, which it is his intention to charge for
such class of work and if the Engineer in charge does not agree to this rates, he shall by
notice in writing be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider it advisable, provided always
that if the contractor shall commence work or incur any expenditure in regard thereof
before the rates shall have been determined as lastly herein before mentioned, then in
such cases he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the
event of the dispute, the decision of the Dy. Municipal Commissioner of the Circle shall be
Where, however, the work is to be executed according to the designs, drawings
and specifications recommended by the contractor and accepted by the competent
authority, the alternation above referred to shall be within the scope of such designs,
drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion
that the increase in the cost occasioned by alterations bears to the cost of the original
work and the certificate of the Engineer-in-charge as to such proportion shall be final and
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an
updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated value of
the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and certify
the amount to be paid to the Contractor after taking in to account any credit or debit for
the month in question in respect of materials for the works in the relevant amounts and
under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items in the
Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and compensation
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the
proportion of any item previously certified in any certificate in the light of later
43.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law. The
Employer shall pay the Contractor the amounts certified by the Engineer within 28 days of
the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the
Contractor will be made by the Employer. Hence, it is the responsibility of the contractor
to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid by the
Employer and shall be deemed covered by other rates and prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession
date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed beyond
the Intended Completion Date then Authority will approve EOT with eligible contractual
price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of
bid submission except GST. However, any subsequent changes in the tax structure by
Government after due date of bid submission will be compensated (+/-) on availability or
submission of actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the contractor fails to
provide such information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to
pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of labour,
materials, fuels and lubricants in accordance with the following principles and procedures
and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given in the
contract data up to end of the initial intended completion date or extensions granted
by the Engineer and shall not apply to the work carried out beyond the stipulated time
for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula given
in the contract data.
(c) Following expressions and meanings during to the work done during each month
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works executed
under variations for which price adjustment will be worked separately based on the
terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor is not
covered by the provisions of this or other clause in the contract, the unit rates and prices
included in the contract shall be deemed to include amounts to cover the contingency of
such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion stated in
the Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
48.2 On Completion of the whole of the Works half the total amount retained is repaid to the
Contractor and half when the Defects Liability Period has passed and the Engineer has
certified that all Defects notified by the Engineer to the Contractor before the end of this
period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention money with
an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the
Employer under the provision of this clause, Employer shall consider the said request of
the Contractor provided that the refund hereunder shall be made in tranches of not less
than 1% (One Percent) of the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 day beyond
the scheduled / extended Defects Liability Period. On completion of the whole works, the
contractor has however an option to submit a fresh irrevocable and unconditional Bank
Guarantee for an amount equal to 5% of the total value of work executed substantially in
the format of Bank Guarantee for Performance Guarantee enclosed with SBD and valid up
to 60 days beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day stated in
the Contract Data for each day that the Completion Date is later than the Intended
Completion Date (for the whole works or the milestone as stated in the contract data).
The total amount of liquidated damages shall not exceed the amount defined in the
The total amount of liquidated damages shall not exceed the amount defined in the
Contract Data. The Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been paid, the
Engineer shall correct any overpayment of liquidated damages by the Contractor by
adjusting the next payment certificate. The Contractor shall not be entitled for any
interest on the over payment calculated from the date of payment to the date of
49.3 If the contractor fails to comply with the time for completion as stipulated in the tender,
then the contractor shall pay to the employer the relevant sum stated in the Contract
Data as Liquidated damages for such default and not as penalty for everyday or part of
day which shall elapse between relevant time for completion and the date stated in the
taking over certificate of the whole of the works on the relevant section, subject to the
limit stated in the contract data.
The employer may, without prejudice to any other method of recovery deduct the
amount of such damages from any monies due or to become due to the contractor. The
payment or deduction of such damages shall not relieve the contractor from his
obligation to complete the works on from any other of his obligations and liabilities under
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any Section,
a Taking Over Certificate has been issued for any part of the Works or of a Section, the
liquidated damages for delay in completion of the remainder of the Works or of that
Section shall, for any period of delay after the date stated in such Taking-Over-Certificate,
and in the absence of alternative provisions in the Contract, be reduced in the proportion
which the value of the part so certified bears to the value of the whole of the Works or
Section, as applicable. The provisions of this Sub-clause shall only apply to the rate of
liquidated damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the intended
Completion Date prescribed in Contract Data the Employer shall pay to the contractor a
sum stated in Contract Data as bonus for every completed month but subjected to
maximum amount as stated in Contract Data; which shall elapse between the date of
completion of all items of works as stipulated in the contract, including variations ordered
by the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time limit of the
works is equal or more than 06 months. The bonus would be paid as under
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two installments
except in special circumstances for which the reason to be Recorded in writing) to the
Contractor of the amounts stated in the Contract Date by the date stated in the Contract
Date, against provision by the Contactor of an Unconditional Bank Guarantee in a form
and by a bank acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until the advance
payment has been repaid, but the amount of the guarantee shall be progressively reduced
by the amounts repaid by the Contractor. The Mobilization advance would be deemed as
interest bearing advance at an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment, plant and
Mobilization expenses required specifically for execution of the Works. The Contractor
shall demonstrate that advance payment has been used in this way by supplying copies of
invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from payments
otherwise due to the Contractor, following the schedule of completed percentages of the
Works on a payment basis. No account shall be taken of the advance payment or its
repayment in assessing valuations of work done, variations, price adjustments,
Compensation Events, or Liquidated damages.
51.4 Secured Advance
The Engineer shall make advance payment in respect of materials intended for but not yet
incorporated in the works in accordance with conditions stipulated in the contract Data.
52.1 The performance Security (including additional security for unbalanced bids) shall be
provided to the Employer no later than the date specified in the Letter of Acceptance and
shall be issued in an amount and form and by a bank or surety acceptable to the
Employer, and denominated in Indian Rupees. The performance Security shall be valid
until a date 60 days from the date of expiry of Defects Liability Period and the additional
security for unbalanced bids shall be valid until a date 28 days from the date of issue of
the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the
Start date and the end of Defects Correction periods shall be remedied by the Contractor
at the Contractor’s cost if the loss or damages arises from the Contractor’s acts or
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the works
and the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the Engineer
issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount
57.1 The Contractor shall supply to the Engineer a detailed final account of the total amount
that the Contractor considers payable as full and final settlement of all claims under the
Contract for items before the end of the Defects Liability Period. The Engineer shall issue a
Defect Liability Certificate and certify any final payment that is due to the Contractor
within 56 days of receiving the Contractor's account if it is correct and complete. If it is
not, the Engineer shall issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is still unsatisfactory after
it has been resubmitted, the Engineer shall decide on the amount payable to the
Contractor and issue a payment certificate, within 56 days of receiving the Contractor’s
revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and savings
in final account is observed, the Engineer/Employer shall be at liberty to restrict the final
payment of BOQ items to the lowest amount evaluated of the bids considering the final
quantities and the rates quoted including the rebates if any. Payment of variation items
shall however be made at the rates approved by the Employer, within 90 days from the
physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated in the
Contract data, or they do not receive the Engineer’s approval, the Engineer shall withhold
the amount stated in the Contract Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the following:
1. The contractor stops work for 28 days when no stoppage of work is shown on the
current programme and the stoppage has not been authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works and the
instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation other than
for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the Contractor
within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period of
time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days for which
the maximum amount of liquidated damages can be paid as defined in the Contract
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public official in the
procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the execution of
a contract to the detriment of the borrower, and includes collusive practice among
Bidders (prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open
59.3 When either party to the Contract gives notice of a breach of contract to the Engineer for
a cause other than those listed under Sub Clause 59.2 above, the Engineer shall decide
whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for convenience.
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done less
advance payments received up to the date of the issue of the certificate, less other
recoveries due in terms of the contract, less taxes due to deducted at source as per
applicable law and less the percentage to apply to the work not completed as indicated in
the Contract data. Additional Liquidated Damages shall not apply. If the total amount due
the Contract data. Additional Liquidated Damages shall not apply. If the total amount due
to the Employer exceeds any payment due to the Contractor the difference shall be a debt
payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental
breach of Contract by the Employer, the Engineer shall issue a certificate for the value of
the work done, the cost of balance material brought by the contractor and available at
site, the reasonable cost of removal of equipment, repatriation of the Contractor’s
personnel employed solely on the works, and the Contractor’s cost of protecting and
securing the Works and less advance payment received up to the date of the certificate,
less other recoveries due in terms of the contract and less taxes due to deducted at
source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are deemed to
be property of the Employer, if the Contract is terminated because of a Contractor’s
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely outside
the control of either the Employer or the Contractor the Engineer shall certify that the
Contract has been frustrated. The Contractor shall make the Site safe and stop work as
quickly as possible after receiving this certificate and shall be paid for all work carried out
before receiving it and for any work carried out afterwards to which commitment was
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his own
arrangements for the engagement of all staff and labour, local or other, and for their
payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return
in detail, in such form and at such intervals as the Engineer may prescribe, showing the
staff and the numbers of the several classes of labour from time to time employed by the
Contractor on the site and such other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall
abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or local
authority and any other labour law (including rules), regulations, bye laws that may be
passed or notifications that may be issued under any labour law in future either by the
State or the Central Government or the local authority. Salient features of some of the
major labour laws that are applicable to the construction industry are given below. The
Contractor shall keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of the
provisions of any Act or rules made thereunder, regulations or notifications including
amendments. If the Employer is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for observance of the provisions stipulated in the
notifications/bye laws/Acts/Rules/regulations including amendments, if any, on the part of
the Contractor, the Engineer/employer shall have the right to deduct any money due to
the Contractor including his amount of performance security. The Employer/Engineer shall
also have the right to recover from the Contractor any sum required or estimated to be
required for making good the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be treated as
the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in case of injury by
accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years service
or more on death, the rate of 15 days wages for every completed year of service. The Act is
applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for monthly
contributions by the employer plus workers @ 10% or 8.33% The benefits payable under the
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to women
employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for certain welfare
measures to be provided by the Contractor to contract labour and in case the Contractor fails
to provide, the same are required to be provided, by the Principal Employer by Law. The
principal Employer is required to take Certificate of Registration and the Contractor is required
to take license from the designated Officer. The Act is applicable to the establishments or
Contractor of Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the Minimum
Wages fixed by appropriate Government as per provisions of the Act, if the employment is a
scheduled employment. Construction of Building, Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be paid,
when it will be paid and what deductions can be made from the wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for work of
equal nature to Male and Female workers and for not making discrimination against female
employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments employing 20 or
more employees. The Act provides for payments of annual bonus subject to a minimum of
8.33% of wages and maximum of 20 % of wages to employees drawing Rs. 3500/- per month
or less. The bonus to be paid to employees getting Rs, 2500/- per month or above Rs. 3500/-
per month shall be worked out by taking wages as Rs. 2500/- per month only. The Act
does not apply to certain establishments. The newly set-up establishments are exempted for
five years in certain circumstances. Some of the State Governments have reduced the
employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes illegal and
what are the requirements for laying off or retrenching the employees or closing down the
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all establishments
employing 100 or more workmen (employment size reduced by some of the State and
Central Government to 50). The Act provides for laying down rules governing the conditions
of employment by the Employer on matters provided in the Act and get the same certified
by the designated Authority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade unions of
workmen and employers. The Trade Unions registered under the Act have given certain
immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits employment of children
below 14 years of age in certain occupations and process and provides for regulation of
employment of children in all other occupations and processes. Employment of Child labour
is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of service) Act
1979:- The Act is applicable to an establishment which employs 5 or more inter-state
migrant workmen through an intermediary (who has recruited workmen in one state for
employment in the establishment situated in another state).The inter-state migrant
workmen, is an establishment to which this Act becomes applicable, are required to be
provided certain facilities such as housing, medical aid, traveling expenses from home upto
the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and Conditions of
Service) Act 1996 and the Cess Act of 1996:- All the establishments who carry on any building
or other constructions work and employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the cost of
construction as may be modified by the government. The Employer of the establishment is
required to provide safety measures at the Building or construction work and other welfare
measures, such as canteens, First Aid facilities, Ambulance, Housing accommodations for
workers near the workplace etc. The Employer to whom the Act applies has to obtain a
registration certificate from the Registering Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans before setting up
a factory, health and safety provisions, welfare provisions, working hours, annual earned
leave and rendering information regarding accidents or dangerous occurrences to designated
authorities. It is applicable to premises employing 10 persons or more with aid of power or
20 or more persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent authority as per rule.
The royalty charges paid shall be borne by the contractor and shall not be reimbursed by the
R) Following Pollution control Acts and amendments made thereof from time to time shall be
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for best
energy use, waste management, the reduction of pollution as in EMS (Environmental
Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the
authority given to the Engineer by the Contract or that the decision was wrongly taken, the
decision shall be referred to Dy. Municipal Commissioner (Higher Authority) within 14 days
of the notification of the Engineer's decision. If the issue is not resolved, any party can refer
the matter for conciliation within 15 days from the decision given by the Dy. Municipal
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of
the Dy. Municipal Commissioner, both the parties have to refer to the Municipal
Commissioner, Nadiad Municipal Corporation concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Dy. Municipal Commissioner, both parties have to refer to the
Municipal Commissioner, Nadiad Municipal Corporation for the conciliation process.
If the dispute is not resolved through the conciliation process, contractor may
refer the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within 14 days of the
notification of the Engineer's decision, the Contractor shall not be entitled to any
additional payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
Clause Reference With respect To
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Address: ………………………………….
Name of authorized Representative (will be intimated later)
2. The Engineer is ………………………
Name of Authorized Representative: …………………………
3. The Defects Liability Period is ................. years from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice to proceed [CL.1.1]
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
12 Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date Milestone
Milestone 1 i.e. 25% - timeline as per tender
Milestone 2 i.e. 50% - timeline as per tender
Milestone 3 i.e. 75% - timeline as per tender
Milestone 4 i.e. 100% - timeline as per tender
6. The Site is located at………………………………………….. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of ............................................. with items as per [CL.1.1]
B.O.Q. The works shall, inter alia, include the following, as Specified or as
Site clearance; setting – out and layout; widening of existing carriageway and
strengthening including camber corrections; construction of new road/ Parallel
service road; bituminous pavements remodeling/construction of Junctions,
intersections, bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items; construction/extension of
cross drainage works, bridge, approaches and other related stones; protective
works for roads/bridge; all aspects of quality assurance of various components
of the works; rectification of The defects in the completed works during the
Defects Liability Period; submission of “As- built’’ drawings and any other
related documents; and other item of work as may be required to be
carried out for completing the work in
accordance with the drawings and the provisions of the contract and to ensure
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments and
bearing; prestressed/reinforced cement concrete superstructure; wearing
coat, hand railings, expansion joints, approach slabs, drainages spouts/
downtake pipes, arrangements for fixing light posts, water mains, utilities etc;
provision of suitably designed protective works; providing wing/return walls;
provision of road markings, road signs etc.; all aspects of quality assurance;
clearing the site and handing over the works on completion; rectification of the
defects during the Defects Liability Period and submission of “As-built”
drawings and other related documents; and other items of work as may be
required to be carried out for completing the works in accordance with the
drawings and the provisions of the contract and to Insure safety [CL.1.1]
(C) Other Items
Any Other Items as required to fulfill all contractual obligations as per the Bid [CL.2.3(9)]
10. The following documents also form part of the Contract:
As per clause 2-3
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death is Rs. 5 lakhs [CL13]
per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make
insurance valid for four occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be …………………….. [CL.21]
19. The period for submission of programme for approval of the engineer shall be 21 [CL. 27.1]
days from the issue of Letter of Acceptance.
20. The period between program updates will be 90 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs _____________.
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the course of
execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not
caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii)Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not found
applicable in a work, the weight component of that commodities {i.e.
‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as indicated in SBD for the purpose
of Price Adjustment} shall be clubbed with the weight component of ‘Other
Material’ (Pm), such that the gross % weight of the components shall remain
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour
shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State on
days preceding the scheduled date of opening of technical Bids
as published by Labour Bureau, Ministry of Labour, Government
Li = The consumer price index for industrial workers for the State for the
month under consideration as published by the Labour Bureau,
Ministry of Labour, Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement
procured by the contractor
Vc = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for cement.
C0 = The all India wholesale price index for Ordinary Portland
Cement on 28 days preceding the scheduled date of
opening of technical bid as published by the Office of the
Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for Ordinary Portland
Cement for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the contractor
shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due to
changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products Rebars) on
28 days preceding the date of opening of Bids as published by the Office of the
Economic Adviser, Department for Promotion of Industry and Internal Trade, Ministry
of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long Products Rebars)
for the month under consideration as published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of Commerce &
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long products
Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest centre on
the day 28 days prior to the scheduled date of opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest centre for the
15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and lubricant) shall
be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing consumer
pumps of IOC at the nearest centre on the day 28 prior to the date of opening of
Fi = The official retail price of HSD at the existing consumer pumps of IOC at the
nearest centre for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has been chosen
to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery
spare procured by the Contractor shall be paid in accordance with the following
Vp= Increase or decrease in the cost of work during the month under consideration
due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery for
mining, quarrying and Construction for the month under consideration as
published Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of machinery for
mining, quarrying and Construction for the month under consideration as
published Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has been
chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement, steel,
bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on 28 days preceding
the scheduled date of opening of technical Bids, as published by the Office of the
Economic Adviser, Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month under
consideration as published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel,
bitumen and POL) of the work.
The following percentage will govern the price adjustment for the entire contract:
2. Cement – Pc ……25%
6. Plant & Machinery Spares Pp .................................. 10%
25. The proportion of payments retained (retention money) shall be 6% {CL. 48} from each
bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49} delay in
completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest Thousand,
per day. For sectional Completion
(wherever specified In item 6 of Contract
data) (1/2000)th of initial contract price for
5 km Section, rounded off to the near est
thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given as per
CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
Nature of Advances Amount (Rs.) Conditions to Be
i Mobilization 10% of the contract On submission of unconditional Price
Bank Guarantee. (to be drawn
before the end of 20% of the contract
period). The contractor may furnish
four bank guarantees of 2.5 % of each
valid for the full period.
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is satisfied That
equipment. Total amount will the equipment is required for
equipment. Total amount will the equipment is required for
be subject to a maximum of performance of the contract) and on
5% of the Contract Price submission of unconditional Bank
amount of advance
iii Secured Deleted
Non-persish able
material Brought
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment of
the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim payments
certified by the Engineer under the Contract. Deduction shall commence in the next Interim
Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than 20 percent of the
Contract Price or 6 (six) months from the date of payment of first installment of advance,
whichever period concludes earlier, and shall be made at the rate of 20 percent (collectively
for both Mobilization Advance and Equipment Advance) of the amounts of all Interim
Payment Certificate until such time as the loan has been repaid, always provided that the loan
shall be completely repaid prior to the expiry of the original time for completion pursuant to
33. The securities shall be for the following minimum amounts equivalent {CL. 52} As a
percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be decided after
evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as presented in Section 8 of the Bidding
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58} are required
within 28 days of the issue of certificate of completion of the whole or section of the work, as
the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by the Date
required is ______________.
37. The following events shall also be fundamentals breach of contract: {CL.59.2} “The
Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60} the
Employer’s additional cost for completing the Works shall be 20 per cent.
TECHNICAL SPECIFICATION
Specification Compliance Clause
In the event of any discrepancy or dispute, the applicable standards outlined in the PWD / R&B / GWSSB Standard
Manual of Specification shall prevail.
The contractor is strictly bound to execute the work in full compliance with the specifications prescribed in the
relevant manuals issued by the Central and State Government. Any deviation from these standards shall be
subject to regulatory review, and necessary actions shall be taken as per the governing contractual and legal
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in
conformity with the conditions of Contract, specification, drawings, Bill of Quantities and
Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably
possible after the receipt of the Engineer’s notice to commence, and to complete the
whole of the Works in the Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 180 Days from the date fixed for receiving
the same, and it shall remain binding upon it and may be accepted at any time before the
expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with
your written acceptance thereof, shall constitute a binding contract between us.
5. We understand that you are not bound to accept the lowest or any tender you may
------- duly authorized to sign bids for and on behalf of -----------------------------------
(in block capitals or typed)
Vendor list as per approved by government or as per
instruction given by engineer in charge
BILL OF QUANTITIES
BILL OF QUANTITIES
Percentage Rate Tender (Up to INR 50 Cr.)
AS PER SCHEDULE B
I/We am/are willing to carry out the work at… ........................ % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and
reference to book of
specifications) figures Words
(A) Total Tendered Amount Rs:-
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
5 TPI & PMC Charges will be deducted from the Contractor’s each RA Bill up to 3% Maximum.
6 Bidder has to quote rates without GST, GST will be applicable extra on tender rate.
Consulting Civil Engineer City Engineer
Dharmesh Deshani OPC Pvt Ltd Nadiad Municipal Corporation
Ahmedabad Nadiad
Deputy Municipal Commissioner
Nadiad Municipal Corporation
1. Name of work: BID DOCUMENT FOR ANNUAL RATE CONTRACT FOR DIFFERENT TYPE OF RAIN WATER
HARVESTING STRUCTURE UNDER JAL SANCHAY JAN BHAGIDARI SCHEME FOR NADIAD MUNICIPAL
CORPORATION - NADIAD., NADIAD
2. The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in more
details in various sections of this bid document.
3. The rates and prices shall be submitted in the electronic formats given by n-procure which is
called Schedule-B, rates and prices received in any other formats will be rejected and the
bids will be disqualified.
4. It will be entirely at the discretion of the employer to accept or reject the bidder’s proposal,
without giving any reasons whatsoever and the bidder shall not be permitted to withdraw his
bid on this account.
for against each item.
only will be considered for comparison and evaluation.
8. The total shall be carried forward to Schedule-B for comparison and evaluation.
9. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
10. The work shall be executed strictly in accordance with the approved drawings, specifications,
and relevant standards set forth by the PWD / R&B / GWSSB / MoRTH (Ministry of Road
Transport & Highways) or any other applicable government authority.
transportation, loading, unloading, testing, wastage, tools, and equipment required for
12. Proper curing, expansion joints, and finishing shall be ensured as per the standard
specifications. Field and laboratory tests, including cube testing, slump tests, and surface
regularity checks, shall be conducted as per relevant IS codes.
13. Proper arrangements shall be made for protection of existing utilities (such as water supply,
sewerage, telecom, and electrical lines). Adequate traffic diversion, barricading, signage, and
night reflectors shall be provided for public safety. All safety measures for workers and the
public shall be ensured as per IRC and OSHA standards.
14. Proper Curing work required as per the instruction given by engineer in charge. According to
the IRC: 84-1983 Code of Practice for Curing of Cement Concrete Pavements, proper curing
of RCC roads involves maintaining adequate moisture and temperature conditions to ensure
the concrete achieves its desired strength and durability. This typically includes methods
such as water curing, where the concrete surface is kept continuously moist for a specified
period, often by ponding or using wet coverings like burlap. Alternatively, membrane curing
compounds can be applied to seal in moisture. The specific duration and method of curing
should be in accordance with the guidelines provided in the IRC code to ensure optimal
performance of the concrete pavement
15. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis.
The item shall not be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “Not Applicable”. The wording in the item description is for
subject matter guidance only; clause references are indicative only and all other relevant
clauses shall also be referred to.
The prices shall allow for all the works covered under the bid digitized asset mapping and all
liabilities and contractual obligations whether separately specified or not. Items against
which no prices are quoted shall not be separately paid for and the bidder shall be deemed
to have covered the cost of execution of such items (according to the requirements of the
bid document) in the prices quoted for other items.
BID FORM (WITH PRICE)
Bidders are required to fill up all the blank spaces in this Bid Form.
DEPUTY MUNICIPAL COMMISSIONER
NADIAD MUNICIPAL CORPORATION
Sub: BID DOCUMENT FOR ANNUAL RATE CONTRACT FOR DIFFERENT TYPE OF RAIN WATER
HARVESTING STRUCTURE UNDER JAL SANCHAY JAN BHAGIDARI SCHEME FOR NADIAD MUNICIPAL
CORPORATION - NADIAD., NADIAD
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission, and
Run the whole of the said works for 12 (twelve) Months from the date of commissioning
including defects liability period as given in Conditions of Contract and in conformity with the
Schedules, Annexure, Bidding Documents, including Addenda Nos.____________________
(insert numbers) for Lump sum fixed price of
___________________________________) for Construction or such other sum as may be
ascertained in accordance with the conditions.
2. I / We agree that;
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the inspection
and testing of materials and workmanship.
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract within 12 Months, inclusive of monsoons, from the date or receipt of Letter of
Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of bid
and it shall remain binding upon us and may be accepted at any time before the expiry of
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
Schedule of Payment
The rates and prices shall be submitted in the electronic formats given by n-procure which is called Schedule-
B. Rates and prices received in any other formats will be rejected and the Bids will be disqualified.
considered for price evaluation & shall form a part of the Contract Agreement.
The bidder shall interpret the data furnished and carry out any additional survey work, investigation work
(S.B.C) or structure design required at his own cost.
The rates quoted shall be exclusive of GST and inclusive of all other taxes, duties which shall not be paid extra.
The TDS shall be deducted at source as per provision of IT rules and Policy.
Payment shall be done as per actual measurements on site after verified by engineer/Corporation.
Sr. No. Description of Items Percentage Payment to be released
1 CIVIL ITEM On pro rata basis
Note: Payment will be released after certification of quantities recorded in the measurement book by EIC.
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey Contract on EPC
basis, the provision of measurement will be applicable only for the assessment of value of work done for
inclusion in any interim certificate for part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule B.
3. Each item of Schedule-B has been divided into broad components. The Employer's Representative shall
assess the value of each component as indicated in paragraph 6 herein below.
4. Percentages are indicated against each component of each item specified in Schedule B, based on the
Employer's best appreciation of the value of the component as related to the total costs of the concerned
item as whole. A head titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he considers necessary but
cannot be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum prices for
the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the Employer's
Representative an initial bill of quantities to all major items, to be reviewed and updated periodically with
the Employer's Representative. This bill of quantities will be used for assessment of percentage progress
of the component at any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and by the method
approved by the Employer's Representative, and signed jointly by both the parties.
7. Priority of work shall be decided in consultation with officials of Municipality and PMC before starting
/planning of work and the same shall be followed.
8. The contractor shall submit the General Arrangement Drawing (GAD) within seven (7) days from the
date of issue of the Work Order for approval by the Engineer-in-Charge. Before commencing any work at
site, the contractor must submit and obtain approval for the Actual Soil Bearing Capacity (SBC) report,
Structural Design, Electrical Design, Plumbing Design, and all other related designs and drawings
necessary for the safe and proper execution of the work. All designs shall be prepared and certified by
qualified professionals in their respective disciplines and shall conform to relevant standards and codes.
No work shall be started at site without prior approval of all these documents by the competent
authority or Engineer-in-Charge, failing which the work may be suspended and suitable action may be
taken as per contract provisions.
G. SCHEDULE FOR TESTING OF MATERIALS
For ensuring quality control and workmanship, various tests prescribed below for materials
shall Be taken at periodical intervals as stipulated below.
Sr. Brief Description Qty. of Total No. of
No. of Materials to be Materi Prescription of test which Frequency @ which test Test 'to
tested Als shall be carried shall be carried out Be taken.
25 to 90 H. B.Metal - Gradation Test 1 to 100 Cmt. - 1 Test
40 to 63 H. B.Metal - Impact Value 100 to 500 Cmt. - 3 Test
40 to 50 M. C.Metal - Flakiness Index 500 to 1500 Cmt. - 5 Test
20 to 50 M. C.Metal - Water absorption test 1500 to 5000 Cmt. - 7 Test
Kapachi - Sp. gravity
2 Grit - Stripping Value,
gradation, Water One test per work
absorption, Sp. Gravity
3 Murrum - P. I. Value One test per work
4 Quarry spall - C.B.R. One test per work
5 Asphalt - Penetration Test as per Tanker Test
Remaining every
- Ductility Test tank
- Specification Gravity As per I.S.
Test As per I.S.
- Softening point Test
- Viscosity Test As per I.S.
6 Tack Coat - Binder temperature
for application Irregular close in intervals
Two test per day.
- Rate of spread of binder
7 Carpet & Seal coat - Grading One test on individual
mix - temperature of binder in constituents
boiler, aggregates in the and mixed aggregates
dryer and mix at the from the
time of laying and dryer for each 100 tons of
rolling (Binder content mix subject to minimum
vide 45 IMD 2172) Rate of Two tests per plant
of Spreaded mix per day. One Test for
materials. each 100tons of mix
subjects to mini. of Two
- Rate of Spreaded mix per dayplant. Regular
materials control through checks
on layer thickness.
- Water absorption
8 Bricks - Effloresce 1 Test @ 50,000 Bricks
- Compressive Strength
9 Cement Consistency 1 Test / 50 M.T.
- Compressive Strength 2 Tests / 100 M.T.
- Initial & Final setting 3 Tests / 200 M.T.
- Fineness 4 Tests / 400 M.T.
- Soundness 5 Tests / 500 M.T.
Sr. Brief Description Qty. of Total No. of
No. of Materials to be Materi Prescription of test which Frequency @ which test Test 'to
tested Als shall be carried shall be carried out Be taken.
- Specific Gravity 6 Tests / 800 M.T.
- Chemical analysis 7 Tests / 1300 M.T.
And 8 test for larger
10 Steel - Tensile strength consignment
1 Test / 40 M.T.
(TMT / M.S.) - Yield Stress 1 Test/ 40 M.T.
- Elongation 1 Test / 40 M.T.
- Size 1 Test / 40 M.T.
- Bend 1 Test / 20 M.T.
- Rebend 1 Test / 20 M.T.
11 C.C. Cube - Compressive Strength 1 to 5 C.mt. -1 Set
in M-150 6 to 15 C.mt. 2 Sets
M-200, 16 to 30 C.mt. - 3 Sets
M-250, 31 to 50 C.mt. - 4 Sets
M-300, 51 above - 4 + One
M-350 additional sample for each
Grade 50 C.mt. / or part thereof
12 Coarse Sand C.B.R., silt content, sieve
analysis One Test per work
13 Sand (For - Specific Gravity
concrete work) - Alkali Reactivity 2 Tests per season or
- Petrography Exa. change of river
- Water absorption test
14 Crushed stone - Gradation
Aggregate (For - Water absorption 1 Sample / 150 Cum. or
concrete work) - Impact Value Sample / Season each
- Abrasion Value source.
- Soundness Test
15 Water for all item - Portability One sample for each
pertaining to - Salinity source of supply
water - Chemical analysis
16 Earthwork for - Sand content
Embankment - Atterberg's limit 2 Test / 8000 Cum
- Density test 2 Test / 8000 Cum
- Moisture content 2 Test / 8000 Cum
- C.B.R. 1 Test / 250 Cum.
17 Cement concrete - Mix design One time test for each
concrete grade beyond
18 Geotechnical - Soil Bearing Capacity One test for Structure
Investigation Design
Up to 10mtr. Depth
The number of tests will be as per Manual of Quality Control or latest Govt. G.R. I Circulars will be final.
The contractor shall have to pay 1 % of the estimate cost put to tender towards all testing of materials & the same
shall be deducted Iron their bills for the works. The testing of various materials shall be carried out in GER 1 and
result recieved shall be binding to all i.e. the contractor and Govt.
Testing charges of GERI shall be born by Govt. No refund be made nor extra charges over 1% shall be recoverable
from the contractor
The bidder shall perform any additional tests required by the Corporation, other than those already mentioned, at
LIST OF REGISTERS TO BE MAINTAINED AT SITE
FOLLOWING DOCUMENTS/REGISTERS TO BE MAINTAINED AT SITE FOR ENSURING PROPER QUALITY CONTROL OF
WORK IN PROGRESS.
1. A complete set of Contract Documents
2. A Complete set of drawings (tender drawings and Good for Execution Drawings)
3. A complete set of change in specification or scope if any and approval thereof.
4. Master Test Register for
Material for field Test.
ii) Lab/Field Test.
5. Register for bricks testing. Lab/Field
6. Concrete Pouring Card
7. Bitumen Test Register
8. Paint Register
9. Empty Bags of Cement Shall Be Deposited on Monthly Basis at Store of
Municipal Coorporation And Same Shall Be Recorded in Store Register for Cement.
10. Register for approval of samples for various materials.
11. Site Order Book.
12. Register showing defects noticed during execution of work and compliance reports.
13. Hindrance Register
Vendor List for Tender work
SCHEDULE OF APPROVED MAKES/MANUFACTURER'S OF MATERIALS:
The following guidelines are to be noted regarding use of materials in the work:
1. As far as possible, materials bearing "Standard Mark (ISI)" from Bureau of Indian Standard
(BIS) shall be used in the work.
2. Wherever, materials bearing Standard Mark (ISI) are used in the work, the following shall be
i) The supplier has a valid license form BIS during the period the material is being used in
ii) The Contractor should maintain furnish necessary documents and proof of payments
made for the procurement of materials bearing Standard Mark (ISI).
3. Mandatory Tests shall be conducted at the specified frequency specified in the Contract. In
case, frequency of testing is not stipulated in the contract then standard specification (CPWD,
ISI etc.) may be considered for frequency at which materials are to be tested.
4. Before bulk purchase of quantities of materials, it is the responsibility of the Contractor to get
the samples of materials approved from consultant and EIC. EIC reserves the right to engage
Third Party Consultant for verify the material and QAP standards.
5. All cost towards the testing shall be borne by the contractor.
6. The latest approved Vendor list for the Civil/Mechanical/Electrical/Instrumentation and other
equipment mentioned in GWSSB is applicable for this contract. Approval of any other make of the
same material or additional items shall be put up for approval by tendering authority.
Reference: official website assist http://www.gwssb.gujarat.gov.in.
SECURITIES AND OTHER FORMS
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the “The
Bidder”) has submitted his bid Dated ------------------------ (Date) for the construction of -----
-------- (Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We -------------------------------------------------
(name of Bank) of --------------------------------------------------- (name of country) having our
registered office at -------------------------------------------------------( hereinafter called
“the bank”) are bound unto --------------------------------------------(name of Employer)
(hereinafter called “The Employer”) in the sum of -------------------------------------------------
for which payment well and truly to be made to the said Employer the Bank itself, his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ---------------------- day of ---------------20
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity
specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the Employer
during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with the
Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the
Instructions to Bidders; or
C. does not accept the correction of the Bid Price pursuant to Clause
(Correction of Errors)
We undertake to pay to the Employer up to the above amount upon
receipt of his first written demand, without the employer having to substantiate his
demand, provided that in his demand the Employer will note that the amount
claimed by him is due to him owing to the occurrence of one or any of the three
conditions, specifying the occurred conditions or conditions.
This Guarantee will remain in force up to and including the date --------------------------
days after the deadline for submission of Bids as such the deadline is stated in the
Instructions to Bidders or as it may be extended by the Employer, notice of which
extension (s) to the Bank is hereby waived. Any demand in respect of this guarantee
should reach the Bank not later than the above date
(Signature, name and address)
The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in Clause
16.1(Bid Security) of the Instructions to Bidders.
45 days after the end of the validity period of the Bid. Date should be inserted by the
Employer before the Bidding documents are issued.
PERFORMANCE SECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in pursuance of
--------- (name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with the
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on
behalf of the Contractor, u p to a total of ------------------------------------------
(amount of guarantee) ---------------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or argument, any
sum or sums within the limits of ---------------------------------------- (amount of guarantee) as
aforesaid without your needing to prove or to show grounds or reasons for your demand
for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor
before presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way release
us from any liability under this guarantee, and we hereby waive notice of any such charge,
addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the Defect
Liabilities period.
Signature and Seal of the guarantor ----------------------------- Name
An amount shall be inserted by the Guarantor, representing the percentage the Contract
price specified in the Contract denominated in Indian Rupees.
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance of
--------- (Name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with the
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on
behalf of the Contractor, up to a total of ------------------------------------------
(amount of guarantee) --------------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or argument, any
sum or sums within the limits of ---------------------------------------- (amount of guarantee) as
aforesaid without your needing to prove or to show grounds or reasons for your demand
for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor
before presenting is with the demand
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way release
us from any liability under this guarantee, and we hereby waive notice of any such charge,
addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor ----------------------------- Name
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, -------------------------------
------------------- (name and address of Contractor) (hereinafter called - “the
Contractor”) shall deposit with (name of
Employer) a bank guarantee his proper and faithful performance under the said
Clause of the Contract in an amount of ------------------------------- (amount of Guarantee) -
We, the------------------------------------- (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary
obligator and not as Surety merely, the payment to ---------------------------------------- (name
of Employer) on his first demand without whatsoever right of obligation on our part and
without his first claim to the Contractor, in the amount not exceeding ---
We further agree that no change or addition to or other modifications of the terms of the
Contractor or Works to be performed thereunder or of any of the Contract documents
which may be made between --------------------------------- (name of Employer) and the
Contractor, shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such change, addition or modifications.
This guarantee shall remain valid and in full effect from the date of the advance
payment under the Contract until -------------------------------------- (name of employer)
receives full repayment of the same amount from the contractor.
Signature and Seal
Name of Bank/ Financial Institution
An amount shall be inserted by that Bank or Financial Institution representing the amount of
the Advance Payment, and denominated in Indian Rupees.
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number, as given
in the Instructions to Bidders) for the Contract Price of Rupees
( ) (amount in words and figures) as corrected and modified in accordance
with the Instructions to Bidders is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in para
34.1 of ITB for an amount equivalent to Rs. within 10 days of the receipt of this
letter of acceptance up to beyond 60 days from the date of expiry of defects Liability
period i.e. up to and the Additional Performance Security for an
amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Date i.e. up to and sign the contract, failing which
action as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature Name
and title of Signatory Name
Delete “Corrected and” or and modified if only one of these actions applies. Delete as corrected
and modified in accordance with the Instructions to Bidders, if corrections or modifications
have not been affected.
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause 34.1 and
signing of the Contract for the construction of
at a bid Price of Rs.
You are hereby instructed to proceed with the execution of the said works in accordance
with the contract documents.
Yours faithfully
(Signature, name and title of signatory authorized To
sign on behalf of Employer)
This agreement, made on the day of between
(name and address of Employer) (Hereinafter called “the Employer)
and (name and address of
contractor) hereinafter called “the Contractor” of the other part.
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the
employer has accepted the Bid by the Contractor for the execution and completion of
such works and the remedying of any defects therein, at a cost of Rs.
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are
respectively assigned to them in the conditions of contract hereinafter referred to and
they shall be deemed to form and be read construed as part of this Agreement.
2. In Consideration of the payment to be made by the Employer to the contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to
executive and complete the works and remedy any defects therein in conformity in all
aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the
execution and completion of the works and the remedying the defects wherein
contract price or such other sum as may become payable under the provisions of the
Contract at the times and in the manner prescribed by the contract.
4. The Following documents shall be deemed to form and be ready and construed as part
of this Agreement viz
i) letter of Acceptance
ii ) Notice to proceed with the works:
iii ) Contractor’s Bid
iv ) Conditions of contract: General and Special
v) Contract Data
vi) Additional conditions
viii ) Bill of Quantities and
ix ) Any other documents listed in the Contract
data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be
executed the day and year first before written
The Common seal of
Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
…………………………………………………..……………………………….. would invest a minimum cash up to 25%
of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
I, the undersigned do hereby undertake that our firm M/s ……………………………………
……………..……………………………….. agree to abide by this bid for a period..................................... days
for date fixed for receiving the same and it shall be binding on us and may be accepted at any
time before the expiration of that period.
(Signed by an Authorized officer of the firm)
Title of officer
DOCUMENTS TO BE FURNISHED BY BIDDER
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01.00_TENDER NOTICE.pdf
03.00_GENERAL TECHNICAL SPECIFICATION BOOKLET_CIVI WORK.pdf
04.00_DMO 2799 11-Mar-2024 662.pdf
05.00_GR TESTING.pdf
06.01_GR_P-1_.pdf
06.02_GR_P-2.pdf
06.03_GR_P-3.pdf
06.04_GR_P-4.pdf
06.05_testing 80 20 10 and in govt degree polytechnic college 17.05.2019.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .