Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.4 Cr
EMD Value
₹6.9 L
Closing Date
6 Jul 2026, 11:00 amClosed
Chief Engineer Project Sewak
HQ CE (P) SEWAK MIDLAND DIMAPUR NAGALAND-797112
SURF WORK INCL CONSTR OF SUBGRADE, GSB, WBM, DBM , BC, PRIME COAT, TACK COAT, HARD SHOULDER AND MOORUM FILLING ON APPROACH RD-1 FROM KOVANG TO BP-56 FROM KM 0.00 TO KM 5.00 UNDER 82 RCC/25 BRTF/SEWAK IN CHANDEL DISTT IN MANIPUR STATE
2026_BRO_766151_1
CE (P) SEWAK/02/2026-27
Open Tender
Civil Works - Roads
Works
360 days
BET KM 0.0-5.0 ON APPCH RD-I FROM KOVANG TO BP-56
As per tender document
8 documents required · 8 mandatory
₹0
₹6.9 L
Yes
HQ Chief Engineer Project Sewak
7 Jul 2026
18 May 2026
7 Jul 2026
18 May 2026
6 Jul 2026
11 Jun 2026
18 May 2026 - 25 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part-I | |||||
| 1.01 | Preparation of sub-grade in SMB by excavating upto 20 cm avg depth, dressing excavated earth to required camber or super elevation and consolidating with power roller incl watering & disposal of surplus earth within a lead of 30 mtr. | 23,819.4 | Sqm | - | - |
| 1.02 | Providing, laying & compaction of GSB 150 mm (compacted) thickness conforming to Clause 401 of MORT&H Specifications for Road and Bridge Works (Fifth Revision) as specified in particular Specifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge | 23,819.4 | Sqm | - | - |
| 1.03 | Providing, laying & compaction of WBM 75 mm (compacted) thickness conforming to Clause 404 of MORT&H Specifications for Road and Bridge Works(Fifth Revision) as specified in particular Specifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge. | 44,353.98 | Sqm | 1 | ₹44,353.98 |
| 1.04 | Providing, laying & compaction of GSB 350 mm compacted thickness in Hard Shoulder conforming to Clause 401 of MORT&H Specifications for Road and Bridge Works (Fifth Revision) as specified in particular Specifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge | 4,785.85 | Sqm | 1 | ₹4,785.85 |
| 2Part-II | |||||
| 2.01 | Providing and applying of Tack Coat by using suitable low viscosity paving bitumen of VG 10 grade @ 0.25 Kg/Sqm conforming to IS:73. on existing bituminous surface after cleaning all complete as per Clause 503 of MoRT&H Specifications for Road and Bridge Works (5th Revision) | 41,159.8 | Sqm | 2 | ₹82,319.6 |
| 2.02 | Application of Prime Coat @ 0.75 Kg/Sqm by mechanical means conforming to clause 502 of MORT&H specifications for Road and Bridge Works (Fifth Revision) as specified in Particular Specifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge | 22,176 | Sqm | 3 | ₹66,528 |
| 2.03 | Providing, laying and compaction of 50 mm thick (compacted) DBM (Dense Bituminous Macadam) layer over WMM Surface including preparation and correction of existing surface with pre-coated stone chips grading confirming to Table: 500-10 and aggregates satisfying the physical requirement of table 500-08 of MORT&H specifications of Road and Bridge Works (Fifth Revision) mixed with minimum 4.5% bitumen VG-10 (Viscosity Grade-10) by weight of total mix and 2% filler by weight of total mix and 2% filler by weight of mix complete in all respect and all as specified and directed by Engineer-in-Charge. | 20,534.8 | Sqm | 4 | ₹82,139.2 |
| 2.04 | Providing and Mixing of stone aggregate in Hot Mix Plant, laying mix BC by paver and compaction BC 30 mm thick (compacted) layer Pre-coated aggregate physical requirement/grading/mix composition confirming to Table: 500-16 and aggregates satisfying the physical requirement of table 500-17 of MORT&H specifications of Road and Bridge Works (Fifth Revision) mixed with minimum 5.4% bitumen (bitumen of appropriate grade as per particular specifications Para 8.2.1) requirement as per Clause 507 of MoRT&H Specifications for Road and Bridge Works (5th Revision) for resurfacing work. Shredded plastic waste @ 8% of Bitumen by weight to be used in Bituminous Concrete Mix without reducing Bitumen Contents as per IRC:SP:98-2013 or latest revised publication. | 20,625 | Sqm | 5 | ₹1,03,125 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tender.pdf
Tender Documents • 2.14 MB
BOQ_858049.xls
BOQ • 0.30 MB
Corri03.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .