Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 34E SUREN SARKAR ROAD KOLKATA KOLKATA WB 700010 | KOLKATA | WEST BENGAL | 700010 | ₹4.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 L+₹14,670.62 (3.65%)Rejected-Finance | ₹4.2 L+₹14,670.62 (3.65%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.2 L+₹16,661.93 (4.15%)Rejected-Finance 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | ₹4.2 L+₹16,661.93 (4.15%) | L3 | Rejected-Finance L3 |
Tender Value
₹4.1 L
EMD Value
₹8,128
Closing Date
19 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER, ED -VII, E-M SECTOR, KMDA
OFFICE OF THE EXECUTIVE ENGINEER, ELECTRICAL DIVISION -VII, E M SECTOR, K.M.D.A 14, RAJA MANINDRA ROAD Kolkata-700037
Overhauling and servicing of 1 no. VT pump (Pump No-1) at Mannapara Booster Pumping Station under Baranagar Municipality.
2026_KMDA_1026405_1
KMDA/EM/EE/ED-VII/ NIT- 02/2026-27 dated -01.06.2026
Open Tender
Electrical Work/ Equipment
Percentage
45 days
Baranagar Municipality.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,128
15 Jul 2026
9 Jun 2026
22 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Decoupling , removing, withdrawing the LT motor of capacity 110 KW from motor stool base after removable of LT connection and cable from cable end box, earth connection & other accessories as connected and stacking the motor properly on wooden block with the help of necessary tools and tackles as required as per direction of EIC. | |||||
| 2Removal of the motor stool after disconnecting cooling water line connection etc. removing of lower half coupling adjusting nuts . Removal of T.B.H unit (Thrust Bearing Housing )and stacking them in repairing bay as per direction of the EIC. | |||||
| 3Removal of packing box sleeve, split packing, gland packing box assembly and stacking them as per direction of the EIC. | |||||
| 4Disconnecting the pump discharge branch from the delivery line and lifting the total pump assembly after removing the cap screw between discharge head and sole plate by removing top column assembly discharge elbow assembly including all shafts coupling and the bowl assembly on proper support and then checking of all the parts as per direction of EIC. (Requried M.S. channels to provide support to pump assembly and mechanical tools and tackles i.e Gas cutting etc. as needed to execute this item is included) | |||||
| 5Dismantling part by part of complete T.B.H unit of Pump and then checking all the parts as per direction of EIC. | |||||
| 6Supply and Delivery at site of the following Spare Parts | |||||
| 6.01 | Rubber Bearing(Part No-3570101) | - | Item | - | - |
| 6.02 | Ratchet Pin(Part No-3690101) | - | Item | 1 | - |
| 6.03 | Coupling Bush(Part No-4000101) | - | Item | 1 | - |
| 6.04 | Coupling Pin Metric(Part No-4040101) | - | Item | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2521657.xls
BOQ • 0.36 MB
Docs2_ED7.pdf
Tender Documents • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .