Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC A 109 NANGIA TOWER A 109 SECTOR 136 NOIDA 201304 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201304 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201304 | L1 | Accepted-AOC L1 | |
| 2 | L2₹76.9 L+₹22.7 L (41.9%)Rejected-Finance 81 1 2ND FLOOR AUROBINDO TOWER SRI AUROBINDO MARG ADCHINI SOUTH DELHI DELHI 110017 | SOUTH DELHI | DELHI | 110017 | L2 | Rejected-Finance Bidder is L2 | |
| 3 | Rejected-Technical 99 KARISHMA APARTMENT PATPAR GANJ PATPARGANJ EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | - | Rejected-Technical Documents submitted by the bidder are not as per requirement of the tender specifications |
Tender Value
₹48.9 L
EMD Value
₹97,800
Closing Date
3 Dec 2022, 1:00 pmClosed
SE HPSLDC
HPSLDC Totu Shimla
Providing Consultancy support to the HP State Load Despatch Center Govt of HP Totu Shimla
2022_MPP1_66523_1
HPSLDC-05/2022-23
Open Tender
Consultancy
Item Rate
60 days
HPSLDC Totu Shimla
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE HPSLDC
₹97,800
27 May 2023
14 Oct 2022
3 Dec 2022
14 Oct 2022
3 Dec 2022
14 Oct 2022
Amount
PART: A
Task 1: SAMAST Report Framework Related Study the current systems implemented at HPSLDC under SAMAST Framework and review the following. a. Existing processes, b. Hardware installed including meters, data concentrators units, modems, servers, etc. c. SAMAST software and other associated software at HPSLDC. d. Communication, SCADA-EMS mechanism and infrastructure. Submit a gap analysis report based on the DPR prepared for HPSLDC and SAMAST guidelines issued by Forum of regulator (FoR), benchmarking it with latest technology used Globally and standards adopted in India.
Task 2: Preparation of an IT Strategy Prepare an ICT Strategy based on the aspiration of HPSLDC in discussion with POSOCO (Power System Operation Corporation Limited), Ministry of Power (MoP), Govt of India, Central Electricity Authority (CEA) and Govt. of Himachal Pradesh. It would include the recommendations for the future requirements of HPSLDC for the next 5 years.
Task 3: Preparation of an IT Roadmap Develop an implementable ICT Roadmap based on the stakeholders (HPSEBL, HPPTCL, HPPCL, HPERC, PGCIL, etc.) consultation for achieving the following: a. Upgradation/ Augmentation required in ICT Hardware. b. Integration between meter data and SCADA without any manual intervention; c. Implementation of Tally ERP as per the requirement of HPSLDC and its integration with other software and any other Financial Modules that may be required; d. Proposed Communication infrastructure requirement for HPSLDC. e. Existing SCADA-EMS system of HPSLDC and its upgradation. f. Accounting Standards and Procedures,HR Policies & Procedures, Annual Administrative Report and Delegation of Financial Powers
Task 4: Workshop Organize Stakeholder's workshop at Shimla as per the details mentioned in the scope of work.
PART: B
All Expenses envisaged towards travelling, Boarding & Lodging at Shimla, Local Transportation at Shimla for the Manpower/ Consultants during the entire contract period.
SISL Infotech Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .