Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC VILL GACHHARATI P O TAKI P S BASIRHAT NORTH 24 PARGANAS | BASIRHAT | NORTH 24 PARGANAS | WEST BENGAL | ₹14.8 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹15.7 L+₹92,547.59 (6.26%)Rejected-Finance GACHARATI TAKI NORTH 24 PARGANAS | TAKI | NORTH 24 PARGANAS | WEST BENGAL | ₹15.7 L+₹92,547.59 (6.26%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹16.7 L+₹1.9 L (13.1%)Rejected-Finance VILL AMARPUR P O DADPUR P S REJINAGAR MSD | KOLKATA | WEST BENGAL | 700023 | ₹16.7 L+₹1.9 L (13.1%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹16.9 L+₹2.1 L (14.2%)Rejected-Finance VILL GACHARATI P O TAKI P S BASIRHAT DIST NORTH 24 PARGANAS W B PIN 743429 | BASIRHAT | NORTH 24 PARGANAS | WEST BENGAL | 743429 | ₹16.9 L+₹2.1 L (14.2%) | L4 | Rejected-Finance 4TH LOWEST |
Tender Value
₹16.6 L
EMD Value
₹33,112
Closing Date
10 Mar 2026, 1:30 pmClosed
EE BDD
Office of the Executive Engineer Bidyadhari Drainage Division Division Postal address- Taki Road, Barasat-700124
ReConstruction of a Wooden Bridge over River Sunti at 8.20 Km. of Mouza - Bagberia Srikrishnapur, G.P.- Kemia Khamarpara, Block - Barasat II in P.S.- Barasat, Dist. - North 24 Parganas
2026_IWD_1013767_1
WBIW/EE/BDD/eNIT- 22(e)/2025-26(2nd call)
Open Tender
CIVIL WORKS
Percentage
75 days
Mouza - Bagberia Srikrishnapur
Please refer Tender documents.
6 documents required · 6 mandatory
₹33,112
Yes
21 Sept 2026
25 Feb 2026
11 Mar 2026
25 Feb 2026
10 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
iii)15 cm av.Diametre. | 745 | Metre | 258.62 | ₹1,92,671.9 |
| 1.01 | iii)20 cm av.Diametre. | 222 | Metre | 363.5 | ₹80,697 |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (ii) 15 cm av. Diameter. | 532 | Metre | 125.14 | ₹66,574.48 |
| 2.01 | (iii) 15 cm. av. Diameter 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. | 48 | Metre | 129.91 | ₹6,235.68 |
| 2.02 | (v) 20 cm. av. Diameter 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. | 123 | Metre | 146.59 | ₹18,030.57 |
| 3 | Supplying , fitting and fixing with iron nails half split bullah wailing pieces and cross pieces ect. Complete with cost of all materials and carriage to site
(a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw/Eucalypcus. | 287.4 | Meter | 123.95 | ₹35,623.23 |
| 4 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidenta chages such as electricity charges, labour insurance charges etc
I) For structural members of specified sections weighing less than 22.5 Kg./m | 0.79 | Mt | 86,528.26 | ₹68,115.05 |
| 4.01 | III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m | 3.08 | Mt | 89,702.02 | ₹2,76,040.03 |
| 5 | Best seasoned wood work in posts, rafters, trusses, beams, purlin, barghas, frames etc. including supplying at site, sizing, hoisting, fitting, fixing in position excluding the cost of bolts and nuts but including the costs of nails, screws, hold fasts etc. (the quantities should be measured upto 3 decimals) a) Sal Wood | 5.8 | cum | 1,11,013.79 | ₹6,43,879.98 |
| 5.01 | (b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-Charge | 1.05 | cum | 58,516.19 | ₹61,442 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
WBF2911.pdf
Tender Documents • 1.86 MB
BOQ_2490062.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .