Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -9.00% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹71,976.30 (42.0%)Admitted-Fee/PreQual/Technical/Finance | +9.50% | ₹2.4 L+₹71,976.30 (42.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.4 L+₹72,754.27 (42.4%)Admitted-Fee/PreQual/Technical/Finance AT RAJRAPPA PROJECT RAMGARH JHARKHAND 829150 | RAMGARH | RAMGARH | JHARKHAND | 829150 | +9.85% | ₹2.4 L+₹72,754.27 (42.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.5 L+₹75,310.46 (43.9%)Admitted-Fee/PreQual/Technical/Finance | +11.00% | ₹2.5 L+₹75,310.46 (43.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.2 L
EMD Value
₹2,800
Closing Date
20 Aug 2026, 5:00 pmClosed
Staff Officer(Civil) Rajrappa Area
Office of the Staff officer(Civil) GM Unit Rajrappa Area
Felling of 58 Nos of trees at saran sthal within premises of mines and transportation of logs from ROCP to charhi forest depot under Rajrappa Project
2026_CCL_363334_1
CCL/Rajrappa/GM Unit/Civil/NIT/26-27/13
Open Tender
Civil Works - Others
Percentage
30 days
Rajrappa Area
As per NIT
4 documents required · 4 mandatory
₹2,800
22 Aug 2026
8 Aug 2026
22 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
10 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rankvegetation, grass, brushwood, treesandsaplingsof girthupto30cmmeasuredata height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 8,400 | each | 10.55 | ₹88,620 |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 15 | each | 321.6 | ₹4,824 |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth | 41 | each | 1,428.7 | ₹58,576.7 |
| 4 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth | 3 | each | 6,619.8 | ₹19,859.4 |
| 5 | Carriage of Timber by mechanical transport including loading and stacking lead 58 K.M. up o charhi forest depot.(204.85+53*9.69 = Rs-718.65) | 21.51 | m3 | 766.55 | ₹16,490.24 |
| 6 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_376255.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_376255.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .