Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance DISTRICT MAGISTRATE HARIDWAR UTTARAKHAND | HARIDWAR | UTTARAKHAND | 247656 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance E 86 KOTI ATHORWALA DEHRADUN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
6 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE CD PWD Chamba
Office of the EE CD PWD Chamba
Improvement / Strengthening of Hadamdhar naame tok se gram Aarakot ke antim bindu se aage motar marg in Chamba block of District Tehri Garhwal including Three years of maintenance after proper completion of work.
2021_pwd_41154_1
2506/2AC Dated 21-12-2021
Open Tender
Civil Works - Roads
Item Rate
270 days
Chamba (Tehri Garhwal)
As per Tender Notice and Bid condition and BOQ
2 documents required · 2 mandatory
₹4,720
EE CD PWD Chamba
₹2.3 L
EE CD PWD Chamba
6 Jan 2022
30 Dec 2021
6 Jan 2022
30 Dec 2021
6 Jan 2022
31 Dec 2021
31 Dec 2021
90 days
Amount
Earth work in hill side cutting for construction of road in all type of soil & rock which may be met during execution of work as per approved plan L-section including disposal of all material 30 M.leads and 1.5 M lift as per direction by engineer I/C dressing of road surface after cutting work.removel & uprooting of trees & bushes also including all labour T&P etc.required for proper completion of the work.
Regrading and Superelevation (Including Cooliewalling)
Excavation in Soil with Dozer with lead upto 100 m :Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site ofembankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
E&B Filling
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, having P.I (4-6) binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404..[Grading of no-1] (45-90 mm size). as per SOR 109612 4-7-1-B
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, having P.I (4-6) binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.[Grading of no-2] (45-63 mm size). as per SOR 109614 4-7-2-B
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse.aggregate, watering and compacting to the required density Grading 3 as perTechnical Specification Clause 405.[Grading of no-3] (22.4 - 53 mm size).as per SOR 109616 4-7-3-B
Construction of R/walls and B/walls.
Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, cuppers, etc.including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Premix Carpet as per PWD Specificationstation-
Cleaning of the existing WBM surface surface and laying 2 cm Thick premix carpet over a tack coat (including cost of Tack coat ) with graded approved grit and bitumen including heating the itumen to the required temperature and mixing either in mixer or in hand drums, including cartage of materials, maintenance of side patries, and watering them during operation for proper Completion of the work including supply of all labour, material, machine, T&P etc, as per PWD Specification and as directed by The engineer-in-charge.With VG-10 grade Bitumen
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B, as per Technical Specification Clause 510
Earth work in Pattri filling in shoulders after soling,inter,top coat, including construction of coolie walls.
construction of coolie walling for WBM as per sor 1-6
E&B filling both side of road patri Rate as per sor 3-3
Pucca Drain :- Construction of hill side drain in accordance with the requirement of specificationstrue to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1
Earthwork in excavation for structures as per drawing and technical specification as per SOR
Plain cement concrete M10 grade
Plain cement concrete M15 grade
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated materialto be used in embankment with a lift upto 3m and lead of 50 m (average lead 25m) as per Technical Specification Clause 307.
Parapet :-Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
Ordinary Kilometer Stone (Precast) 10-10-(ii)
200 m stone (precast) 10-10-(iii)
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2
800 mm x 600 mm rectangular SOR No. 10-2-B-4
600 mm equilateral & triangle SOR No.10986 6000 10-2-B-(iii)
Providing edge stones on valley side of formation as per drawing and technical specification clause 1608.2.6 (Per No.) Sor No -8-9
Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( if Concrete Required for Vertical post Fixing will be paid extra)
First Year Maintenance
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earthen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree trucks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Second Year Maintenance
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908
Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory / regulatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910
Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refitting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earthen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree trucks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Third Year Maintenance
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908
Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refitting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Maintenance of Earthen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
White washing of parapet walls of CD work and tree trucks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specification Clause 1904.2
Om Prakash Uniyal
M/S UTTAM SINGH RAWAT
DINESH SINGH PUNDIR
VINOD PRASAD BIJLWAN
JAIPAL SINGH CHAUHAN
Rukam Chand Ramola
JAI KEDAR CONSTRUCTION CO.
Devbhoomi construction
stage.html
html • 0.03 MB
finance_48773.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .