Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-Finance | ₹26.6 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹26.9 LRejected-Finance SRINGARI COMPLEX CANARY HILL HAZARIBAGH | HAZARIBAGH | HAZARIBAGH | JHARKHAND | ₹26.9 L | L2 | Rejected-Finance L2 bidder |
Tender Value
₹26.6 L
EMD Value
₹53,200
Closing Date
21 May 2026, 3:00 pmClosed
General Manager, TZ VII, Dhanbad
General Manager, Transmission Zone VII, Bijli Colony, Hirapur, Dhanbad
Carrying out Preventive / Schedule and breakdown maintenance of 220/132/33 kV Grid Sub-Station, Govindpur, Dhanbad for the period from 01.06.2026 to 31.03.2027
2026_JSEB_113737_1
117/PR/JUSNL/2026-27
Open Tender
Electrical Works
TSD, Govindpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
₹53,200
Yes
27 May 2026
8 May 2026
22 May 2026
8 May 2026
21 May 2026
8 May 2026
Preventive/ Routine/Breakdown Maintenance and periodic testing of Grid Sub-station with the help of 01 no. Highly Skilled, 02 nos. of skilled, 02 nos. of unskilled as per provided daily, weekly, monthly, quarterly, half yearly & yearly maintenance schedule of various EHT & LT equipments provided by Engineer Incharge & as per direction of Engineer Incharge.
Maintenance / Emergency Maintenance of Grid Substation as per schedule and JOB provided by Engineer In-charge.
Fixing and replacement of Energy meter/ MW meter/ Voltmeter/Ammeter/Relay (220/132/33 KV)
Misc. work of Grid Substation as per schedule and JOB provided by Engineer In-charge
Break down maintenance
Supply of Hydra/ Crane (upto 8MT capacity) as per requirement
Complete overhauling with painting of 150MVA & 80MVA Transformer Cooling Fans with supply of all materials if required
Transportation of materials & equipments through truck/pickup upto 3MT including loading, unloading of the materials.
Transportation of materials & equipments through truck/pickup upto 6MT including loading, unloading of the materials.
Repair of 220kV SF6 Breaker 1Ph spring charged motor if required
Repair of 132kV SF6 Breaker 1Ph spring charged motor if required
Repair of 33 kV VCB 1Ph spring charge motor if required
Erection, connection, testing and commissioning as per direction of E/I
Erection of following equipments with Crane/ Derrick at site including handling the material/ equipments carefully at site including labour charges for all incidental and operational items of work (excluding cost of transportation charges from store to site)
Dismantling of following equipments with Crane/Derrick at site including handling the material/ equipment carefully at site including labour charges for all incidental and operational items of work ( Excluding cost of transportation charges from store to site)
Routine maintenance and gas refilling of air conditioners (1.5/2TR, ACs) and servicing to prevent leakage of condensate water from indoor ACs including top up of Gas as per requirement.
Testing of Transformers/ICTs including Tan Delta Test of all bushing & winding , winding resistance test, turn ratio test, magnetic balance test, short & open circuit test , IR & PI test etc.
Testing of Transformer oil by recognised laboratory including supply of sampling bottle.
Servicing of 250 KVA Cummins make DG set
Assesment of defects of battery chargers.
Maintenance and replacement of miner defective parts/equipments of battery chargers
Repair and Overhauling of 3ph Sub-mersible pump including materials, lifting & lay down of Sub-mersible pump from Borewell , repair of water supply pipe all complete job & Transporation cost.
Filtaration of Transformer oil with Oil filtaration machine.
Wiring of TBC control & Relay Panel including commissioning of panel
Supply of Consumables viz. Markin cloth, Distilled water, grease, Mobil, Nuts & Bolts, cotton waste, Joute, Petrolium Jelly, Kerosine, WD-40 rust remover etc. Required time to time for O&M works of GSS.
SUB TOTAL Rs.
Approximate increase in VDA @6% during the year on Sl. No. 01 Rs.
Sub-total B (Sl. No. 01 + VDA @ 6%) Rs.
Contractor profit on Sub-Total B (Max. upto 10%)
Overhead Expenditure for T&P 3% on on Sub-Total B Rs.
EPF Contribution of Employer @12% on on Sub-Total B Rs.
ESIC Contribution of Employer @3.25% on on Sub-Total B Rs.
Administrative Charges@1% on on Sub-Total B Rs.
Sub-Total (except Sub-Total B) Rs.
GST @ 18% Rs.
Sub-Total Rs.
Labour Cess @ 1%
Gross Total Rs.
Gross Total Say Rs.
In Words:- Rupees………………………………………………………………………………………………. )only inclusive of GST and all other taxes.
Note- Bidders should fill in blue coloured column only.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
PricepartAMCGOVfinal.xls
Additional Documents • 0.05 MB
BOQAMCGOVINDPUR.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid