| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Finance | ₹11.3 L | L1 | Admitted-Finance |
| 2 | L2₹11.7 LAdmitted-Finance | ₹11.7 L | L2 | Admitted-Finance |
| 3 | L3₹14.8 LAdmitted-Finance H NO 129 BEHIND CHAPEL KHADPABANDH PONDA GOA | SOUTH GOA | GOA | 403103 | ₹14.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Balaji Constructions and Traders L3 | FATO A GAONKAR L2 | M/S GAONKAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in all type of strata comprising any of the materials such as soil, silt, clay, gravel, moorum of all varieties shingles, pebbles, all types of conglomerates, lateriate rock, soft rock, ordinary rock, distintegrated rock, weathered rock, fissured / shattered / decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or method as may be convenient or permitted inclusive of chiseling wedging etc but blasting prohibitted in all condition such as dry, moist, saturated submerged foul conditions etc including pumping or bailing out water dewatering including setting out construction of shoring, strutting and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading danger lighting guarding and backfilling the excavation earth to the extent required and disposal of excavated stuff in specified area lead upto 50m and with all lifts etc complete and as per specification and drawing and as directed by the engineer in charge etc all complete. | 199.5 | Cu.M | 57,855 ₹68,268.9 | 47,880 ₹56,498.4 | 46,443.6 ₹54,803.45 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 16 | Cu.M | 36,800 ₹43,424 | 30,240 ₹35,683.2 | 28,302.08 ₹33,396.45 Lowest |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
Foundations, footings, bases of columns and mass concrete. | 296.4 | Sqm | 1,18,560 ₹1,39,900.8 | 1,02,258 ₹1,20,664.44 | 96,507.84 ₹1,13,879.25 Lowest |
| 4.00 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded or basaltic Stone aggregate 20mm nominal size) excluding cost of centering , shuttering and finishing in:
All Works upto plinth level | 142.5 | Cum | 10,26,000 ₹12,10,680 | 8,05,125 ₹9,50,047.5 | 7,76,340 ₹9,16,081.2 Lowest |
| 5.00 | Providing and fixing weep holes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. 75 mm dia | 44.4 | RM | 11,100 ₹13,098 | 7,104 ₹8,382.72 | 6,569.87 ₹7,752.45 Lowest |
Tender Value
₹14.1 L
EMD Value
₹28,148
Closing Date
4 Aug 2026, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement to nallah bank by constructing protection wall near the field of Shree Surya Chandro Gaonkar bearing Sy. No. 10/1 at village Thane V.P. Dongurli Thane in Sattari Taluka.
2026_WRD_30531_1
No.WRD/WDVI/PB/F.30/TN e 14/2026-27/347 line 6 Dated 21/07 /2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,148
26 Aug 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all type of strata comprising any of the materials such as soil, silt, clay, gravel, moorum of all varieties shingles, pebbles, all types of conglomerates, lateriate rock, soft rock, ordinary rock, distintegrated rock, weathered rock, fissured / shattered / decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or method as may be convenient or permitted inclusive of chiseling wedging etc but blasting prohibitted in all condition such as dry, moist, saturated submerged foul conditions etc including pumping or bailing out water dewatering including setting out construction of shoring, strutting and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading danger lighting guarding and backfilling the excavation earth to the extent required and disposal of excavated stuff in specified area lead upto 50m and with all lifts etc complete and as per specification and drawing and as directed by the engineer in charge etc all complete. | 199.5 | Cu.M | 291 | ₹58,054.5 | 18% |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 16 | Cu.M | 2,211 | ₹35,376 | 18% |
| 3 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
Foundations, footings, bases of columns and mass concrete. | 296.4 | Sqm | 6,810 | ₹20,18,484 | 18% |
| 4 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded or basaltic Stone aggregate 20mm nominal size) excluding cost of centering , shuttering and finishing in:
All Works upto plinth level | 142.5 | Cum | 407 | ₹57,997.5 | 18% |
| 5 | Providing and fixing weep holes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. 75 mm dia | 44.4 | RM | - | - | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_30942.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].