| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC CHEMBIL PADICHIRA PULPALLY WAYANAD KERALA | PULPALLY | WAYANAD | KERALA | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SANIL CR L1 |
|---|---|---|---|---|
| 1.00Construction of 50000 Litre Capacity Tank | ||||
| 1.01 | 2.32
Clearing grass and removal of the rubbish up to a distance of 50 m outside the
periphery of the area cleared. | 64 | sqm | 8.66 ₹554.24 Lowest |
| 1.02 | 2.7.1
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock | 98 | cum | 483.34 ₹47,367.32 Lowest |
| 1.03 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 12.44 | sqm | 360.41 ₹4,483.5 Lowest |
| 1.04 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 7.94 | cum | 7,404.03 ₹58,773.19 Lowest |
| 1.05 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 11.16 | cum | 9,789.52 ₹1,09,280.41 Lowest |
| 1.06 | 5.9.2
Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc. | 91.2 | sqm | 783.63 ₹71,467.06 Lowest |
| 1.07 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended
floors, roofs, landings, balconies and access platform | 44.96 | sqm | 897.16 ₹40,332.72 Lowest |
| 1.08 | 5.2.2
Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size derived from natural sources) | 15.41 | cum | 11,920.7 ₹1,83,709.91 Lowest |
| 1.09 | 5.22.1
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelMild steel and Medium Tensile
steel bars | 1,541.1 | kg | 104.11 ₹1,60,443.92 Lowest |
Tender Value
₹14.4 L
EMD Value
₹36,029
Closing Date
25 Oct 2025, 6:00 pmClosed
Regional Project Director
RPMU Kannur, Thalap
Construction of 50 KL GLSR and allied works CHDALAPPUZHA Water Supply Scheme in Kadirur Panchayath, Kannur District - Deposit work
2025_KRWSA_810250_1
02/KRWSA/KNR/KDR/ DW/25/RT
Open Tender
Civil Works - Water Works
Item Rate
90 days
Kadirur
As per NIT
2 documents required · 2 mandatory
₹2,500
₹36,029
RPMU Kannur
20 Nov 2025
16 Oct 2025
27 Oct 2025
16 Oct 2025
25 Oct 2025
16 Oct 2025
16 Oct 2025 - 25 Oct 2025
18 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1352180.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_1352180.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .