Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹52.9 Laccepted-aoc | ₹52.9 L | accepted-aoc |
Tender Value
₹70.5 L
EMD Value
₹70,493
Closing Date
13 Aug 2026, 3:00 pmClosed
Vice Chairman KUDA
Office of the Vice Chairman KUDA Warangal
RAISING OF 3.32KM CENTRAL MEDIAN ON NH-163 OUTER PASS FROM CHAINAGE 142.000KMS TO 142.230KMS, 142.290KMS TO 143.400 KMS, 145.090KMS TO 145.800 KMS, 145.890KMS TO 146.380KMS, 146.400KMS TO 146.820 AND 146.840KMS TO 147.200KMS DURING 2026-27 IN HANUMAKONDA
724401
D/1242/2026,Dt.5-8-2026
OPEN
Other
WARANGAL (URBAN)
5 documents required · 5 mandatory
₹2,496
₹70,493
5 Sept 2026
6 Aug 2026
7 Aug 2026
Engaging of Man power for cleaning and cutting of old individual shrubs, over grown branches and removal of debris from median to out side the road boundary (75 Mandays per two KM) 37.50 Mdays per KM.
HEDGE/SHRUB PLANTING - Cost of plants for Hedge(Bombay Duranta)
Hedge / shrubs: planting : Digging the trenches of size 30 cms depth refilling the trench with red soil, FYM at 4:1 ratio internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc.' complete , but excl the cost of fertilizes and plant material. =2*0.3m*3320m=1992sqm
Watering Schedule For Hedge plants: Cost of water to the Hedge plants through tankers 5000 lts. Capacity once in a day 5 lts x 26 days/Month (12 months) 1992 sqmts. X 5 lts. X 26 days x 12 months / 5000 lts. =1992*5*26*12/25000=124.30
Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day (Sub soil moisture shall be maintained continuously), the watering shall be carried out daily during Non-rainy days. iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt) etc., ( 12 months ) =1992*12= 23904*2930.79/100= 700576.04
Tall plants at Middle of the median 3.00 mts. c/c - Cost of tall plants of (Pogada, Filicium dicipiens etc., ) 3320 mts length @ 3.00 mts spacing (14"x14"x 5' ht, 15 cms girth sturdy ) + 10% extra
Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
Cost, transport and fixing of support sticks for tall plants
Watering Schedule For Tall plants: Cost of water to plants through tankers for watering 5000.00 lts. each trip capacity (5) trips per day 20.00 lts per plant in each watering (Apr-6, May - 6, June - 5, July - 3, Aug -2, Sep - 2, Oct - 3, Nov -3, Dec - 3, Jan - 4, Feb - 4, Mar- 5) = 46 For 12 Months = 46 Waterings 1107*20*46/25000=40.74 Tanker Days
Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth for 12 Months for Tall plants. =1107*12 =13284*721.88/100 =95894.54
Individual shrub planting 1.00 mtrs c/c -Cost of shrub plants of (Caliandra, Caesalpinae pulicharima, Tecoma gaudichaudi, Plumeria pudica etc., ) 2 rows x 3220 mts length 1.00 mt c/c = 6640 + 10 % extra = 7304
Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the pplication of fertilizers and pesticides (@ 20 gms /pit /sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. 2 rows 1.00 mt c/c = 2000*3.32km=6640 Nos
Alignment and staking including cost of stakes
Watering Schedule For Shrub plants: Cost of water to plants through tankers for watering 5000.00 lts each trip capacity (5) trips per day 5.00 lts per plant in each watering for 15 days (July to Nov) a month for alternate days for 5 months and 26 days (Apr, May, June and Dec - March) a month for 7 Months. each shrub x @ 5 lts per time x 15 days /25000 = 6640*5*15*5/25000=99.6, each shrub x @ 5 lts per time x 26 days /25000 = 6640*5*26*7/25000=241.70 Total = 99.6+241.70=341.3
i) Trimming once in 15 days. ii)Watering once a days @ 5 litres / per plant (sub soil moisture shall be maintained continuously).The watering shall be carried out during non-rainy days. iii)Formation of basins for each and every plant upto 1 ft.away from the plant. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., (a) With Manual watering (Rs. 437.58 as per HMDA rate is Rs. 380.70). For 12 Months =6640*12 months=79680*380.70/100= 303314.76
Manufacture supply delivery and fixing of MS gate of size 5x2.1m including cost and conveyance of hold pasts, all drops, all material and labour charges for fabrication and fixing for finished item of work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xls
TENDER_DOCUMENT • 0.05 MB
Bid Document.docx
TENDER_DOCUMENT • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .