Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.2 L+₹19,657 (10.00%)Admitted-Fee/PreQual/Technical/Finance | ₹2.2 L+₹19,657 (10.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Jayan V.P L1 | HARSHAD T M L2 |
|---|---|---|---|---|---|
| 1.00Estimate | |||||
| 1.00 | OD5145/2026-2027:Supplying Earth filled cement bags tied with coir yarn and stacking in layers wherever necessary to prevent seepage in canal and keeping them in position until the completion of water distribution, Including cost and conveyance of filling earth, empty cement bags and labour charges for filling, tying, laying in position etc complete as per the direction of departmental officers at site. | 98 | no | 59.44 ₹5,825.12 Lowest | 65.38 ₹6,407.24 |
| 1.00 | OD5146/2026-2027:Supplying labours (Beldar/ Coolie for various petty works like removing Obstructions strengthening side bunds etc in canal for smooth functioning of water distribution works as per the directions of departmentalofficers at site | 120 | each | 1,082.18 ₹1,29,861.6 Lowest | 1,190.39 ₹1,42,846.8 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | 2,454.32 ₹9,817.28 Lowest | 2,699.75 ₹10,799 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 4 | each | 11,391.49 ₹45,565.96 Lowest | 12,530.63 ₹50,122.52 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 6 | each | 919.09 ₹5,514.54 Lowest | 1,010.99 ₹6,065.94 |
Tender Value
₹2.0 L
EMD Value
₹4,915
Closing Date
17 Sept 2026, 10:00 amClosed
Naveen C L
CIP Subdivision
GENERAL-CSM - 2026-27-Urgent Removal of obstructions in LBMC from Ch 22/950 km to 29/300 Km and Killimangalam, Pynkulam, Panjal branch canals including cutting trees - General Civil Work
2026_Irrig_868719_1
IRR/IA/TR/2355/2026_5_4_3/1
Open Tender
Civil Works - Canal
Item Rate
270 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹555
Yes
₹4,915
Yes
18 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
10 Sept 2026 - 17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Estimate | |||||
| 1.001 | OD5145/2026-2027:Supplying Earth filled cement bags tied with coir yarn and stacking in layers wherever necessary to prevent seepage in canal and keeping them in position until the completion of water distribution, Including cost and conveyance of filling earth, empty cement bags and labour charges for filling, tying, laying in position etc complete as per the direction of departmental officers at site. | 98 | no | - | - |
| 1.002 | OD5146/2026-2027:Supplying labours (Beldar/ Coolie for various petty works like removing Obstructions strengthening side bunds etc in canal for smooth functioning of water distribution works as per the directions of departmentalofficers at site | 120 | each | - | - |
| 1.003 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | - | - |
| 1.004 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 4 | each | - | - |
| 1.005 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 6 | each | - | - |
stage.html
html • 0.02 MB
finance_1471363.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
fot.pdf
Tender Documents • 0.26 MB
preliminaryagreement.pdf
Tender Documents • 0.26 MB
epay.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
affid.pdf
Tender Documents • 0.24 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1471363.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .