| 1 | L1₹17.6 LAccepted-AOC IDUKKI | KERALA | 685501 | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.9 L+₹22,862.39 (1.30%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHAMSUDHEEN KV L1 | ABDUL MAJEED L2 |
|---|---|---|---|---|---|
| 1.00A.E.O OFFICE, MELATTUR | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.32 | cum | 2,138.45 ₹2,822.75 Lowest | 2,166.19 ₹2,859.37 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 71.24 | sqm | 856.89 ₹61,044.84 Lowest | 868.01 ₹61,837.03 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 69.82 | sqm | 648.17 ₹45,253.28 Lowest | 656.57 ₹45,839.75 |
| 1.00 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 17.2 | sqm | 700.78 ₹12,053.42 Lowest | 709.87 ₹12,209.76 |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 21.84 | sqm | 868.27 ₹18,963.02 Lowest | 879.53 ₹19,208.94 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 43.45 | sqm | 816.7 ₹35,485.62 Lowest | 827.3 ₹35,946.19 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 34.8 | metre | 193.82 ₹6,744.94 Lowest | 196.34 ₹6,832.63 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 3,641.6 | kg | 95.52 ₹3,47,845.63 Lowest | 96.75 ₹3,52,324.8 |
| 1.01 | OD124188/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately.All work above plinth level upto floor V level | 23.87 | cum | 10,980.67 ₹2,62,119.57 Lowest | 11,123.12 ₹2,65,520 |
Tender Value
₹19.1 L
EMD Value
₹47,668
Closing Date
19 Mar 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer, PWD Buildings Division, Malappuram
GENERAL Construction of building for AEO office Melattur Phase II General Civil Work
2026_PWD_846253_1
BL/DN/MPM/54/2025-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
Melatture
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹47,668
Yes
24 Jul 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A.E.O OFFICE, MELATTUR | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.002 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.8 | sqm | - | - |
| 1.004 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 1 | sqm | - | - |
| 1.005 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 1 | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
| 1.008 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
| 1.009 | OD124188/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately.All work above plinth level upto floor V level | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429689.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1429689.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 4.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .