Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | L1 | Accepted-Finance Being a re-tender, single bid admitted |
Tender Value
Refer Docs
EMD Value
₹9,200
Closing Date
26 Jun 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
UTY ENGIINEER
OFFICE OF UTY ENGINEER
ReConstruction of Panel room in the University Campus-Retender
2025_MGU_766326_2
UE/DB/E02/2025-26
Open Tender
Civil Works - Others
Item Rate
MG UNIVERSITY CAMPUS
Please refer Tender documents.
5 documents required · 5 mandatory
₹750
Yes
₹9,200
Yes
30 Jun 2025
13 Jun 2025
28 Jun 2025
13 Jun 2025
26 Jun 2025
13 Jun 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan). including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 nominal size)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement: 6 coarse sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for:Lintels. beams, plinth beams, girders bressumers and cantilevers
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)
Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 (1 cement: 6 coarse sand) etc complete.
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1.1.5:3 (1 cement: 1.5 coarse sand (Zone III): 3 graded stone aggregate 20 mm nominal size)
Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings/ wooden frames with rawl plugs screws etc
12 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand)
12 mm cement plaster finished with a floating coat of neat cement of mix: 1:3 (1 cement: 3 fine sand)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 1tr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement: 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600 x 600 mm.
Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg). including filling /grouting and finishing complete as per direction of Engineer-in-charge. Size of Tile 600x600 mm
Deduct for not grouting the joints with white cement and matching pigment in the items of fixing of vitrified tiles
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer.
Labour engaged for miscellaneous works. Coolie.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .