Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LRejected-Finance | L1 | Rejected-Finance single tender first time |
Tender Value
₹5.1 L
EMD Value
₹12,694
Closing Date
11 Mar 2024, 3:00 pmClosed
ROY_MATHEW
Office of the Assistant Engineer, LIDEW Section, Delampady Grama Panchayat
Annual Plan-DELAMPADY GP 2023-24 COSTRUCTION OF KOPPALAM POND-294/24-General Civil Work
2024_LSGD_666411_10
AE/LIDEW/DP/58/T1/2023-24
Open Tender
Civil Works - Water Works
Item Rate
180 days
Delampady
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,120
Yes
₹12,694
Yes
20 Jun 2024
4 Mar 2024
13 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
APPENDIX A
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD116603/2023-2024:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size including all cost of materials, labour charges etc.
OD104706/2023-2024:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (Modified 50.6.7.1)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
Bidder Name
aravindakshan
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1036217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .