| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -33.00% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹19,031.41 (5.54%)Admitted-Finance | -29.29% | ₹3.6 L+₹19,031.41 (5.54%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹22,417.05 (6.52%)Admitted-Finance | -28.63% | ₹3.7 L+₹22,417.05 (6.52%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 L+₹56,991.63 (16.6%)Admitted-Finance | -21.89% | ₹4.0 L+₹56,991.63 (16.6%) | L4 | Admitted-Finance |
Tender Value
₹5.1 L
EMD Value
₹10,260
Closing Date
24 Jul 2026, 6:00 pmClosed
commissioner
nagar nigam kota
rain year lakhwa talab repairing work 1 nit 8
2026_DLB_574908_1
NNK/CIVIL/2026/156-169 nit 8
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
commissioner
₹10,260
Yes
3 Aug 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:3 (1 cement : 3 coarse sand) | 10 | CUM | 5,390 | ₹53,900 |
| 1.02 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:3 (1 cement : 3 fine/ coarse sand) | 300 | SQM | 340.5 | ₹1,02,150 |
| 1.03 | Providing, laying, spreading and compacting of granular sub-base by providing close graded material (Table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | 50 | CUM | 1,157 | ₹57,850 |
| 1.04 | Random rubble dry stone Kharanja (soling) under floor. | 10 | CUM | 2,270 | ₹22,700 |
| 1.05 | Engagged civil Mistry | 35 | P.DAY | 700 | ₹24,500 |
| 1.06 | Supply of labour talab site in shifts as requried at Mazdoor/ helper | 80 | Each | 480 | ₹38,400 |
| 1.07 | Carriage of Materials by mechanical transport including loading, unloading and stacking Earth.lead 5 k.m | 100 | cum | 254.76 | ₹25,476 |
| 1.08 | Supply &filling and stiching of empty bags of capacity 50 Kg.per bag wih earth available at site weight not less than 40 kg. Including excavation etc. complete as plastic bags lakhawa talab . | 3,000 | Each | 9.5 | ₹28,500 |
| 1.09 | Labour charges for making coffer damping bund by loading transporting of earth filled cement bags droping at requried location in water including all leads and lift complete excluding the cost of cement bags . lakhawa Talab | 3,000 | Each | 14.25 | ₹42,750 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
0001.pdf
Tender Documents • 1.34 MB
BOQ_1022545.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .