| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC BARDUBHI DHANBAD 828129 | DHANBAD | JHARKHAND | 828129 | ₹9.3 L Quoted ₹7.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 LRejected-AOC COAL INDIA LIMITED | ₹7.3 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.0 L
EMD Value
₹8,710
Closing Date
2 Mar 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Lowering, transportation and Laying and fitting of 1200mm and 1000mm conveyor belt in D19 panel, Dismantling, transportation and fitting of JSDB 20 winch at near 10th rise in D19 panel of XVI(T) seam in Moonidih Colliery ,W.J. Area
2026_BCCL_353695_1
BCCL/WJA/MND/SUR/2025-26/110
Open Tender
Miscellaneous Works
20 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹8,710
17 Apr 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
Lowering, transportation and Laying & fitting of 1200mm & 1000mm conveyor belt in D19 panel, Dismantling, transportation and fitting of JSDB 20 winch at near 10th rise in D19 panel of XVI(T) seam in Moonidih Colliery ,W.J. Area
Lowering and loading of 3 rolls of 200m(1200mm) conveyor belting on surface Analysis:Total unskilled manshift requred/shift/roll=14. cost/shift/roll=(14*1402.6)=Rs19636.4/Roll
Transportation of 3 rolls of 200m(1200mm) conveyor belting from 7th D/R jn of 400mh main line to D-18 B/G,10TH D/R jn. via track & haulages. Analysis: Manshift required for transportation =10 unskilled manshift/shift /roll Cost involved= 10*1402.60=Rs14026/shift /roll
Laying & fitting of 3 rolls i.e. 600m(1200mm) belting on 10th D/R conveyor belt . Analysis:manshift required/roll =20 unskilled/shift /roll Cost involved=(1402.6x20)=Rs.28052/shift/roll
Loading & Lowering and of 150m(1000)mm conveyor belting on surface Analysis:Total unskilled manshift requred/shift=12. cost/shift=(12*1402.60)=Rs16831.2
Transportation of 150m(1000mm )conveyor belting from 7th D/R jn of 400mh main line to D-18 B/G,10TH D/R jn. via track & haulages. Analysis: Manshift required for transportation =8 unskilled Cost involved= 8*1402.6=Rs11220.80 /shift
Transportation of 750m(1000mm) conveyor belting from 7th D/R jn of 400mh main line to D-18 B/G,10TH D/R jn. via track & haulages. Analysis: Manshift required for transportation =8 unskilled/shift Cost involved= 8*1402.60=Rs11220.80 /shift
Transportation of a 600m(1000mm) belting in trough haulage in D-19 B/G. Analysis:manshift required/shift =10 unskilled/shift/150m Cost involved=(1402.6x10)=Rs.14026/shift/150m belting Cost/m=Rs 14026/150=Rs 93.51/m
Laying & fitting of a 600m(1000mm)belting on P3&P4 conveyor belt in D-19 B/G. Analysis:manshift required/shift =10 unskilled/shift/150m Cost involved=(1402.6x10)=Rs.14026/shift/150m belting Cost/m=Rs 14026/150=Rs 93.51/m
Manual Transportation of a 300m(1000mm) belting in 9th D/R above D-18 T/G. Analysis:manshift required/shift =15 unskilled/shift/150m Cost involved=(1402.6x15)=Rs.21039/shift/150m belting Cost/m=Rs 21039/150=Rs 140.26/m
Laying & fitting of a 300m,1000mm belting on P1 conveyor in 9th D/R belt above D-18 T/G. Analysis:manshift required/shift =10 unskilled/shift/150m Cost involved=(1402.6x10)=Rs.14026/shift/150m belting Cost/m=Rs 14026/150=Rs 93.51/m
Dismantling of JSDB 20 winch at 9th D/R jn. Of D-18 T/G. Analysis:manshift required/shift =6 unskilled/shift Cost involved=(1402.6x6)=Rs.8415.6/shift
Manual Transportation of JSDB 20 winch from 9th D/R jn. Of D-18 T/G to 10th D/R jn. of D-19 B/G. (i.e.150m by chain and pulley ) Analysis: Manshift required for manual transportation of winch/20m =8 unskilled. Cost/m= (8*1402.6)/20 =Rs.561.04/m
Cleaning of site, grouting of roof bolts for installation of winch at 10th D/R jn. of D-19 B/G. Analysis:manshift required/shift =6 unskilled/shift Cost involved=(1402.60x6)=Rs.8415.6/shift
Installation of JSDB20 winch at D-19 B/G, 10th D/R jn. Analysis: Unskilled manshift required/shift=8 cost/shift=(8*1402.6)=Rs11220.8
Manual transportation of Starter & starting cable for JSDB20 winch from 9th D/R jn. Of D-18 T/G to 10th D/R jn. of D-19 B/G. (i.e.150m) Analysis: Manshift required for manual transportation of starter and starting cable/50m =8 unskilled. Cost/m= (8*1402.6)/50 =Rs.224.42/m
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_366501.pdf
BOQ Comparative Chart
xlsx
finsummary_366501.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_366501.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid