Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC KANNAMBRA GRAMA PANCHAYAT KANNAMBRA P O PALAKKAN DIST PIN 578 SPS | 578686 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.1 L+₹45,411.13 (9.75%)Rejected-AOC KANNAMBRA GRAMA PANCHAYAT KANNAMBRA P O PALAKKAN DIST PIN 578 SPS | 578686 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Sunilkumar.M.M L1 | Swarun D L2 |
|---|---|---|---|---|---|
| 1.00Raising and Tarring | |||||
| 1.00 | 3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 37.2 | cum | 16.18 ₹601.9 Lowest | 16.46 ₹612.31 |
| 1.00 | OD330336/2024-2025:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 37.2 | cum | 1,081.01 ₹40,213.57 Lowest | 1,099.81 ₹40,912.93 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 37.2 | cum | 2,580.23 ₹95,984.56 Lowest | 2,625.1 ₹97,653.72 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 55.8 | cum | 3,813.92 ₹2,12,816.74 Lowest | 3,880.25 ₹2,16,517.95 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 372 | sqm | 90.39 ₹33,625.08 Lowest | 91.96 ₹34,209.12 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 372 | sqm | 19.59 ₹7,287.48 Lowest | 19.93 ₹7,413.96 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 372 | sqm | 294.65 ₹1,09,609.8 Lowest | 299.77 ₹1,11,514.44 |
| 1.01 | OD330337/2024-2025:Supplying and fixing Name board as directed by dept officers | 1 | each | 2,396.03 ₹2,396.03 Lowest | 2,437.7 ₹2,437.7 |
Tender Value
₹4.4 L
EMD Value
₹10,925
Closing Date
3 Jan 2025, 2:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF ASSISTANT ENGINEER LID EW SECTION PUNNAYUR GP
New Road Tarring
2024_LSGD_719051_1
AE/LIDEW/PNR/327/25
Open Tender
Civil Works - Roads
Item Rate
120 days
PUNNAYUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹965
Yes
₹10,925
Yes
30 Jun 2026
23 Dec 2024
4 Jan 2025
23 Dec 2024
3 Jan 2025
23 Dec 2024
Amount
Raising and Tarring
3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
OD330336/2024-2025:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
OD330337/2024-2025:Supplying and fixing Name board as directed by dept officers
Swarun D (BID ID -2045338)
Bidder Name
Sunilkumar.M.M
Swarun D
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1137250.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .