Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹24.9 L+₹49,892.26 (2.04%)Admitted-Fee/PreQual/Technical/Finance ITAMATI NAYAGARH NAYAGARH | NAYAGARH | ODISHA | 752024 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹25.2 L+₹79,890.32 (3.27%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹25.9 L+₹1.5 L (6.08%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | DIBYA RANJAN SWAIN L1 | SUBASH PAIKARAY L3 | RAMA KRUSHNA PATTNAYAK L2 | SANJITA OJHA L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. | 118.41 | Cum | 130 ₹15,393.3 Lowest | 219.7 ₹26,014.68 | 255.8 ₹30,289.28 | 199 ₹23,563.59 |
| 2.00 | Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 106.73 | Cum | 570 ₹60,836.1 | 519.99 ₹55,498.53 | 233 ₹24,868.09 Lowest | 550 ₹58,701.5 |
| 3.00 | Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 29.1 | Cum | 4,100 ₹1,19,310 | 4,417.69 ₹1,28,554.78 | 4,926.3 ₹1,43,355.33 | 4,000 ₹1,16,400 Lowest |
| 4.00 | Brick work with Fly ash bricks 25cm x 12cmx8cm size having crushing strength not less than 75kg/cm2 with dimensional tolerance +8 percentage in cement mortar(1:5) in foundation including cost conveyance royality etc complete as direction by EIC. | 27.28 | Cum | 4,200 ₹1,14,576 Lowest | 4,421.2 ₹1,20,610.34 | 4,204.2 ₹1,14,690.58 | 4,500 ₹1,22,760 |
| 5.00 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC. | 73.64 | Cum | 4,800 ₹3,53,472 | 4,553.86 ₹3,35,346.25 | 3,800 ₹2,79,832 Lowest | 4,600 ₹3,38,744 |
| 6.00R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying with Centering & shuttering as direction of EIC. | |||||||
| 6.01 | Footing (M20) | 12.92 | Cum | 7,500 ₹96,900 | 7,604.6 ₹98,251.43 | 5,104.3 ₹65,947.56 Lowest | 8,043 ₹1,03,915.56 |
| 6.02 | Column (M20) | 7.43 | Cum | 12,000 ₹89,160 | 13,070.27 ₹97,112.11 | 11,931.6 ₹88,651.79 Lowest | 14,063 ₹1,04,488.09 |
| 6.03 | Plinth Beam (M20) | 7.1 | Cum | 11,500 ₹81,650 | 8,200.33 ₹58,222.34 | 5,513.4 ₹39,145.14 Lowest | 9,225 ₹65,497.5 |
| 6.04 | Lintel (M20) | 3.44 | Cum | 8,700 ₹29,928 Lowest | 10,396.19 ₹35,762.89 | 9,169.5 ₹31,543.08 | 11,089 ₹38,146.16 |
Tender Value
Refer Docs
EMD Value
₹30,941
Closing Date
7 Oct 2026, 5:00 pmClosed
Managing Director, SERIFED
Office of the Managing Director, SERIFED, Saheed Nagar, Bhubaneswar-751007
Construction of Training cum Demonstration Hall with creche facility for women at MDF Phulbani
2026_SERIF_141742_1
VI-16(03)/SERIFED/2026-27/1244
Open Tender
Civil Works - Buildings
Item Rate
210 days
Phulbani
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹30,941
Yes
8 Oct 2026
26 Sept 2026
8 Oct 2026
26 Sept 2026
7 Oct 2026
26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. | 118.41 | Cum | 269.7 | ₹31,935.18 |
| 2 | Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 106.73 | Cum | 638.34 | ₹68,130.03 |
| 3 | Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 29.1 | Cum | 5,423.14 | ₹1,57,813.37 |
| 4 | Brick work with Fly ash bricks 25cm x 12cmx8cm size having crushing strength not less than 75kg/cm2 with dimensional tolerance +8 percentage in cement mortar(1:5) in foundation including cost conveyance royality etc complete as direction by EIC. | 27.28 | Cum | 5,427.45 | ₹1,48,060.84 |
| 5 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC. | 73.64 | Cum | 5,590.3 | ₹4,11,669.69 |
| 6R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying with Centering & shuttering as direction of EIC. | |||||
| 6.01 | Footing (M20) | 12.92 | Cum | 9,335.38 | ₹1,20,613.11 |
| 6.02 | Column (M20) | 7.43 | Cum | 16,045.01 | ₹1,19,214.42 |
| 6.03 | Plinth Beam (M20) | 7.1 | Cum | 10,066.7 | ₹71,473.57 |
| 6.04 | Lintel (M20) | 3.44 | Cum | 12,762.33 | ₹43,902.42 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
DTCN.pdf
Tender Documents • 1.27 MB
BOQ_610924.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .