Tender Value
₹5.8 L
EMD Value
₹6,000
Closing Date
5 Sept 2026, 6:00 pm
Executive Engineer, Panchayat R&B Division Mehsana
15th Finance Commission, 2022-2023, Construction of Community Hall At Motipura Village. Ta. Vijapur, Dist. Mehsana.
338010
15 of 2026-2027 SN.07 Vijapur
Open
Civil - All
Works
Mehsana
5 documents required · 5 mandatory
₹900
Executive Engineer, Panchayat R&B Division, Mehsana
₹6,000
22 Aug 2026
22 Aug 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
15th Finance Commission, 2022-2023, Construction of Community Hall At Motipura Village. Ta.
Vijapur, Dist. Mehsana.
QUANTITY STATEMENT
It. Description of Item (with brief specification and Estimated rate
Quantity Unit Rate In Amount
No. reference to book of specifications) In words
1 Providing and laying nominal cement concrete M-200 in 5.80 Cum. 7851.20 Rupees Seven
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Eight
stone agregate 20 mm. Nominal size) including finishing Hundred Fifty
smooth with curing complete including the cost of form One and Paise
work but excluding the cost of reinforcement for R.C.C. Twenty Only
work in column for ground Floor
2 Providing and laying nominal cement concrete M-200 in 11.61 Cum 5710.69 Rupees Five
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Seven
stone agregate 20 mm. Nominal size) including finishing Hundred Ten
smooth with curing complete including the cost of form and Paise Sixty
work but excluding the cost of reinforcement for R.C.C. Nine Only
work (c) PLINTH BEAM
3 Providing and laying nominal cement concrete M-200 in 13.65 Cum. 6166.99 Rupees Six
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand One
stone agregate 20 mm. Nominal size) including finishing Hundred Sixty
smooth with curing complete including the cost of form Six and Paise
work but excluding the cost of reinforcement for R.C.C. Ninety Nine
work for Beam Ground Floor. Only
4 Providing and laying nominal cement concrete M-200 in 1.90 Cum. 7494.62 Rupees Seven
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Four
stone agregate 20 mm. Nominal size) including finishing Hundred Ninety
smooth with curing complete including the cost of form Four and Paise
work but excluding the cost of reinforcement for R.C.C in Sixty Two Only
LINTELS Ground Floor.
5 Providing and laying nominal cement concrete M-200 in 0.90 Cum. 6363.05 Rupees Six
R.C.C. 1:1 1/2 :3 (1 cement :1 1/2 coarse sand : 3 graded Thousand Three
stone agregate 20 mm. Nominal size) including finishing Hundred Sixty
smooth with curing complete including the cost of form Three and Paise
work but excluding the cost of reinforcement for R.C.C in Five Only
CHHAJJAS Ground Floor.
6 Providing TMT Bar FE 500/500D reinforcement for R.C.C. 4772.70 Kg 77.29 Rupees Seventy
work including bending, binding and placing in position Seven and Paise
complete upto floor two level. Twenty Nine
Rupees Five Lakhs Eighty Four Thousand Eight Hundred Sixty Five and Paise Ninety Nine Only
I/We am/are willing to carry out the work at…% above/below percent(Should be wri en in figures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs............... Estimated amount put to tender Rs...............
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R & B Sub Division Panchayat R & B Division
Vijapur Mehsana
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
5.1 Building Specifications _Booklet_.pdf
5.2 Electrical Specification Booklet.pdf
4.1.GR to be attached with DTP_SBD_with Index.pdf
1.0 FP.pdf
4.0 SCHEDULE B.pdf
SBD Book.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].