EXECUTIVE ENGINEER PMU EKM
Office of the Executive Engineer Project Management Unit Power House Road Ernakulam
Constructing new HT Feeder from new Vytilla S/S TO Madavana
2026_KSEB_892471_1
EP- 32/2026-27/PMU - EKM
Open Tender
Electrical Works
Percentage
90 days
Panangad
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹50,000
25 Nov 2026
25 Nov 2026
15 Dec 2026
25 Nov 2026
10 Dec 2026
26 Nov 2026
60 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 2 | No | 2,795.55 | ₹5,591.1 |
| 2 | Drilling hole of various sizes on existing Channel/Cross Arm. | 36 | No | 16.73 | ₹602.28 |
| 3 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 36 | No | 4,245.59 | ₹1,52,841.24 |
| 4 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. | 36 | No | 868.77 | ₹31,275.72 |
| 5 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 130 | No | 762.14 | ₹99,078.2 |
| 6 | Fitting and erecting one HT PSC Single Pole in position for ABC work etc. digging and back filling pit in ordinary soil (as per standards), with out fitting V cross arm&F.bracket. The actual work key no.112 amount 2178/-. The rate of fitting V-cross arm(rs.320)&F-bracket(rs.99) rate is deducted from key no 112(ie.2178-419=1759) | 80 | E | 1,759 | ₹1,40,720 |
| 7 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). | 40 | No | 3,433.27 | ₹1,37,330.8 |
| 8 | Insertion of one HT A type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). | 30 | No | 4,302.05 | ₹1,29,061.5 |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 38 | No | 906.41 | ₹34,443.58 |
| 10 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 47 | No | 1,778.32 | ₹83,581.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tenderdoc.pdf
Tender Documents • 1.82 MB
BOQ_1527979.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .