Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER ACCEPTED | |
| 2 | 2₹12.8 L+₹12,701 (1.00%)Rejected-AOC | 2 | Rejected-AOC L2 BIDDER REJECTYED |
| Sl No | Description | Qty | Unit | WILSON THOMAS L2 | P V BABYCHAN L1 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 4,125 | sqm | 18.37 ₹75,776.25 | 18.19 ₹75,033.75 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 343.2 | cum | 260.21 ₹89,304.07 | 257.63 ₹88,418.62 Lowest |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 2,350 | sqm | 135.53 ₹3,18,495.5 | 134.19 ₹3,15,346.5 Lowest |
| 1.00 | OD11010/2025-2026:Removing water weeds such as hyacinth, grass etc, by rooting out small trees and all other debris wherever necessary including conveying the debris from the site and disposing the same with contractor's own risk of choice etc. complete as per the direction of deptl. officers at site | 1,360 | sqm | 16.67 ₹22,671.2 | 16.5 ₹22,440 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 719.09 | kg | 188.92 ₹1,35,850.1 | 187.05 ₹1,34,505.41 Lowest |
| 1.01 | OD11009/2025-2026:supplying and fixing plastic mesh 25x25x2mm for trash rack to fixing GI pipe farmers including cost and conveyance of all materials and labour charges etc complete as per the direction of departmental officers at site | 175 | sqm | 414.14 ₹72,474.5 | 410.04 ₹71,757 Lowest |
| 2.00Appendix B | |||||
| 2.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 1 | cum | 1,569.97 ₹1,569.97 | 1,554.43 ₹1,554.43 Lowest |
| 2.00 | OD12921/2025-2026:Raking out the old surface in cement mortar and preparing the surface for replastering , including disposal of rubbish to the dumping ground, all complete as per direction of Engineer in Charge. | 189.2 | sqm | 39.58 ₹7,488.54 | 39.19 ₹7,414.75 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,761
Closing Date
17 Oct 2025, 4:00 pmClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER MI SUBDIVISION ALUVA
Annual Maintenance
2025_Irrig_808220_1
IRR/IA/TR/3740/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
240 days
PARAVOOR
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,761
Yes
12 Nov 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
10 Oct 2025 - 17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347628.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.05 MB
Document
2.20 MB
Document
0.05 MB
Document
0.08 MB
BOQ
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .