Tender Value
₹1.4 L
EMD Value
₹2,700
Closing Date
12 Aug 2026, 6:00 pmClosed
XEN
Nowshera
Repair/Upgradation of Bania Dugwell and Sapawali line including allied works under WSS Hathal (District Capex Budget).
2026_PHE_318586_6
e-NIT No.12 of 2026-27
Open Tender
Civil Works
Percentage
21 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
XEN
₹2,700
Yes
14 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 60 | Sqm | 12.49 | ₹749.4 |
| 2 | Silt clearance inclusive of intial lead and lift and lift (50m & 1.5m respectively) Wet | 33.91 | cum | 184.95 | ₹6,271.65 |
| 3 | Extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked material.
a) Fourth lift | 33.91 | cum | 359 | ₹12,173.69 |
| 4 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. (The quantity advertised is fixed, nothing extra will be paid behind the advertised quantity). | 140 | K.Ltr | 167.8 | ₹23,492 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement :3 coarse sand: 6 graded stone aggregate 20 mm nominal size) | 0.45 | Sqm | 5,733.6 | ₹2,580.12 |
| 6 | Supply of stone 225mm nominal size. | 7.65 | Cum | 700 | ₹5,355 |
| 7 | Dumping of stone. | 9 | Cum | 237.9 | ₹2,141.1 |
| 8 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge
a) 15 mm to 40 mm nominal bore. | 160 | Mtr | 109.65 | ₹17,544 |
| 9 | b) 40 mm & above nominal bore. | 140 | Mtr | 121.65 | ₹17,031 |
| 10 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
a) 20 mm dia. G.I. pipes. | 90 | Mtr | 22.25 | ₹2,002.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1050771.xls
BOQ • 0.25 MB
Corrigendum01.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .