Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.0 LAccepted-AOC | L1 | Accepted-AOC FIRST LOWEST | |
| 2 | L2₹80.2 L+₹4.2 L (5.57%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | L3₹82.0 L+₹6.0 L (7.86%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | L3 | Rejected-Finance THIRD LOWEST | |
| 4 | L4₹87.2 L+₹11.3 L (14.8%)Rejected-Finance 7 8 WEST PRATAP NAGAR MAHOLI ROAD MATHURA | MATHURA | MATHURA | UTTAR PRADESH | L4 | Rejected-Finance FOURTH LOWEST |
| Sl No | Description | Qty | Unit | VASUNDHRA CONSTRUCTION L2 | M/S SHIVA ENGG AND CONTRACTOR L4 | S F INFRA PROJECTS L3 | VIJAY ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in Excavation of Foundation in dry ordinary soil including lift up to 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth. complete all as specified and as directed by engineer in charge | 498 | cum | 50 ₹24,900 Lowest | 107 ₹53,286 | 120 ₹59,760 | 90 ₹44,820 |
| 2.00 | C.C. (M-15) with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specifind and as directed by engineer in charge. | 111 | cum | 6,750 ₹7,49,250 | 6,350 ₹7,04,850 | 6,000 ₹6,66,000 | 5,300 ₹5,88,300 Lowest |
| 3.00 | C.C. (M-20) with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specified and as directed by engineer in charge. | 166 | cum | 7,000 ₹11,62,000 | 6,850 ₹11,37,100 | 6,500 ₹10,79,000 | 5,600 ₹9,29,600 Lowest |
| 4.00 | RC.C. in (M-25) with cement, coarse sand and Crushed stone Aggregate including all Cost of Material, Labour & T&P etc, complete all as specified and as directed by engineer in charge. | 344 | cum | 7,500 ₹25,80,000 | 8,050 ₹27,69,200 | 7,000 ₹24,08,000 Lowest | 7,000 ₹24,08,000 Lowest |
| 5.00 | Steel Reinforcement Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steel including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge. | 28 | mt | 70,000 ₹19,60,000 | 71,500 ₹20,02,000 | 75,000 ₹21,00,000 | 65,000 ₹18,20,000 Lowest |
| 6.00 | Centering & Shuttering steel of CC work including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge. | 282 | Sqm | 98.55 ₹27,791.1 | 92 ₹25,944 | 90 ₹25,380 Lowest | 90 ₹25,380 Lowest |
| 7.00 | Centering & Shuttering steel of RCC work including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge | 601 | Sqm | 197 ₹1,18,397 | 177.5 ₹1,06,677.5 | 150 ₹90,150 Lowest | 190 ₹1,14,190 |
| 8.00 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014: 2012, MORTH Clause 2500, of requined size, Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every Im interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular is twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, complete all as specified and as directed by engineer in charge. | 294 | cum | 3,408 ₹10,01,952 | 3,067 ₹9,01,698 | 2,500 ₹7,35,000 Lowest | 3,000 ₹8,82,000 |
| 9.00 | Rubber Water stop for lift joint of 225 mm in position i/c cost of all material, labour, T&P. All leads and lifts cutting forming fixing and maintaining them in position for proper complete all as speciiled and as directed by engineer in charge | 45 | rm | 1,500 ₹67,500 Lowest | 9,100 ₹4,09,500 | 8,000 ₹3,60,000 | 7,100 ₹3,19,500 |
| 10.00 | Supplying & Fixing 75 mm dia Dranaige pipe complete all as specified and as directed by engineer in charge. | 8 | rm | 150 ₹1,200 | 135 ₹1,080 | 150 ₹1,200 | 100 ₹800 Lowest |
Tender Value
₹97 L
EMD Value
₹1.9 L
Closing Date
20 Aug 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE IWC MATHURA
SE IWC CIVIL LINE MATHURA
Construction work of Super Passage of Sikandrabad Dy. at km 2.190 of Mant Feeder.
2025_UPIDC_1064713_2
03/SE/2025-26
Open Tender
Civil Works
Item Wise
425 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,914
₹1.9 L
SE IWC MATHURA
8 Dec 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
11 Aug 2025
Amount
Earth Work in Excavation of Foundation in dry ordinary soil including lift up to 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth. complete all as specified and as directed by engineer in charge
C.C. (M-15) with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specifind and as directed by engineer in charge.
C.C. (M-20) with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specified and as directed by engineer in charge.
RC.C. in (M-25) with cement, coarse sand and Crushed stone Aggregate including all Cost of Material, Labour & T&P etc, complete all as specified and as directed by engineer in charge.
Steel Reinforcement Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steel including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge.
Centering & Shuttering steel of CC work including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge.
Centering & Shuttering steel of RCC work including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014: 2012, MORTH Clause 2500, of requined size, Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every Im interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular is twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, complete all as specified and as directed by engineer in charge.
Rubber Water stop for lift joint of 225 mm in position i/c cost of all material, labour, T&P. All leads and lifts cutting forming fixing and maintaining them in position for proper complete all as speciiled and as directed by engineer in charge
Supplying & Fixing 75 mm dia Dranaige pipe complete all as specified and as directed by engineer in charge.
Earthwork in Filling for Making & Removing Bundh including all Lead & Lift with Ramming & Dresing etc. complete all as specified and as directed by engineer in charge
Surface Dewatering by 5 HP diesel pump set with all arrengement for construction of foundation, Assume shall be used for 20 hrs average per 12 day for 20 days for work upto bed level complete all as specified and as directed by engineer in charge.
Supplying & Fixing Teflon Coated SS Plate Bearing size 350x270x30 mm Under Girder and Over Abumtent complete all as specified and as directed by engineer in charge.
Dismentaling of Brick or Stone Massonary in lime or Cement i/c Stacking taled Material with in 60 M distance complete all as specified and as directed by engineer in charge.
VASUNDHRA CONSTRUCTION (BID ID -5457457)
S F INFRA PROJECTS (BID ID -5459482)
M/S SHIVA ENGG AND CONTRACTOR (BID ID -5464016)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .