Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC Lowest Quoted Bidder | |
| 2 | L2₹4.7 L+₹8,475.55 (1.83%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.8 L+₹15,118.16 (3.26%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SHIJU K VARGHESE L3 | Vijayakumaran Nair K L1 | KAMALASANAN.P.K L2 |
|---|---|---|---|---|---|---|
| 1.00SIDE PROTECTION WORK | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 38 | sqm | 18.19 ₹691.22 | 15.78 ₹599.64 Lowest | 15.82 ₹601.16 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 104 | cum | 200 ₹20,800 Lowest | 223.62 ₹23,256.48 | 224.13 ₹23,309.52 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 104 | cum | 3,575 ₹3,71,800 | 3,466.32 ₹3,60,497.28 Lowest | 3,473.91 ₹3,61,286.64 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 19.5 | sqm | 350 ₹6,825 | 335.18 ₹6,536.01 Lowest | 335.95 ₹6,551.03 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.88 | cum | 10,000 ₹48,750 | 9,104.25 ₹44,383.22 Lowest | 10,658.37 ₹51,959.55 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 146.25 | kilogram | 95 ₹13,893.75 Lowest | 97.58 ₹14,271.08 | 97.81 ₹14,304.71 |
| 1.01 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 35 | hour | 450 ₹15,750 | 395.66 ₹13,848.1 Lowest | 395.85 ₹13,854.75 |
Tender Value
₹5.3 L
EMD Value
₹13,347
Closing Date
30 Oct 2025, 1:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Minor Irrigation Sub Division Pathanamthitta
The left side bund of the Kolappara thodu at V Kottayam damaged and water flowing through the ela. Due to this, about 3ha of the ela became water logged and affected the cultivations. Hence construction of side wall at this reach is very urgent.
2025_Irrig_813181_1
IRR/IA/TR/5367/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
V Kottayam
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,180
₹13,347
Yes
10 Aug 2026
22 Oct 2025
31 Oct 2025
22 Oct 2025
30 Oct 2025
22 Oct 2025
Amount
SIDE PROTECTION WORK
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
KAMALASANAN.P.K (BID ID -2417719)
SHIJU K VARGHESE (BID ID -2415279)
Bidder Name
Vijayakumaran Nair K
KAMALASANAN.P.K
SHIJU K VARGHESE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1359375.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.96 MB
BOQ_1359375.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .