Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹6,351
Closing Date
10 Jul 2026, 3:00 pm2d left
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Buildings Sub Division, Thodupuzha
The items mainly included in the estimate are Dismantling existing damaged tile work Dismantling toilet door and water closet RCC Lintel and brick work above toilet door Plastering work below tile portions in the toilets
2026_PWD_858883_1
04/AEE/etender/tdpa/2026-27
Open Tender
Civil Works - Buildings
180 days
Thodupuzha
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
Yes
₹6,351
Yes
3 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil work | |||||
| 1.001 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.002 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.003 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | - | no | - | - |
| 1.004 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.005 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 1.006 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.008 | 50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete | - | cum | - | - |
| 1.009 | OD283497/2025-2026:OD252042/2023-2024
Providing and laying water proofing treatment in portion of WCs, bathroom,, terrace , walls etc by applying Acrylic/ crystalline type two component waterproofing compound of international brand consisting of applying : a) First layer two component (powder and liquid) mixed as per manufactures proportion and applied as first coat . This layer will be allowed to air cure for 8 hours. b) Second layer again coated as per manufactures proportion neatly and thoroughly . This layer will be allowed to air cure for 8 hours followed with water curing for 48 hours including ponding test to check leakage. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry including pressure grouting if necessary. all complete as per direction of engineer in charge | 1 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd3.pdf
Tender Documents • 1.64 MB
BOQ_1452044.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid