Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹88.02 (0.03%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,868
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
DEV OF SHAMSHAN GHAT AT NOWPORA PYT HALQA NOWPORA A BLOCK WAGOORA UNDER ADP PRI
2026_RDPR_317990_42
159/Xen/Rew/Bla/2026-27 Dated 27/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,868
29 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
17 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil | - | cum | - | - |
| 2 | p/l of stone soling/nallah boulders handpacked by mt 15kms | - | cum | - | - |
| 3 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 4 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.welded | - | kg | 1 | - |
| 5 | p/f of 0.5 mm high rib color coated roof sheeting complete job | 1 | Sqm | - | - |
| 6 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete,
on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) Dark shade using ordinary cement | - | Sqm | - | - |
| 7 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades,
laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete Size of tile 600x600 mm | - | sqm | 1 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 1 | Sqm | - | - |
| 9 | 12mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 coarse sand) | 1 | Sqm | 1 | ₹1 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Of two or more coats | - | sqm | 1 | - |
stage.html
html • 0.02 MB
finance_1045621.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1045621.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .