Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
7 Sept 2026, 6:00 pm
CWE (AF) Ambala
HQ CWE (AF) Ambala Cantt-133001
CWE/AF AMB/AMB-T20/2026-27 SMART PERIODICAL AND CERTAIN BR WORKS SERVICES IN DOMESTIC AREA AT AF STN AMBALA UNDER GE AF AMBALA
2026_MES_783682_1
CWE/AF AMB/AMB-T20/2026-27
Open Tender
Civil Works
Item Rate
270 days
Ambala
For MES enlisted contractor Class B Category a i and for un-enlisted contractor refer NIT
8 documents required · 8 mandatory
₹1,000
GE (AF) Ambala
₹2.1 L
Yes
10 Aug 2026
10 Aug 2026
9 Sept 2026
10 Aug 2026
7 Sept 2026
1 Sept 2026
10 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Complete removal of old existing treatment of wall (external/ internal) and ceiling finishes using mechanical dry wall sander machine (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 grit and above having dia of 7" /9" to completely remove the existing treatment of wall and ceiling surface and ready to take new surface finishes complete all as specified and directed. | 42,831 | Sqm | - | - |
| 2 | Material and labour for applying water proof cement based putty @0.80kg (undiluted) per sqm of average thickness 2mm in two coats on prepared old plaster/ newly plastered wall ,(external/ internal) and ceiling surfaces complete all as specified and directed.
Notes : Application of water proof cement based putty will be done in following steps :-
(i) Filling cracks in wall using crack seal compound Asian smart care crack seal or equivalent.
(ii) Mix the putty @ 0.8 kg/sqm by adding 35 to 40% water by volume or as per approved manufacturer's instructions & mixing it with electric putty mixer with mixing capacity of min 2.5 kg putty per minute upto 5 to 10 minutes.
(iii) Apply the first coat of prepared mix of putty with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minute with max pressure 3300 PSI with bottom to top configuration and allow 6 to 8 hrs to dry the putty surface.
(iv) Apply the second coat of prepared mix of putty with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minute with maximum pressure 3300 PSI with horizontal configuration and allow 6 to 8 hrs to dry putty surface.
(v) Then prepare the surface by electronic wall sander machine to apply subsequent coats of primer complete all as specified and directed.
(vi) The prepared surface after wall putty, the contractor will inform to the GE as well as to the Engineer-in-Charge for site inspection before applying further internal/external finishes. Please note that the further internal/external finishes work will start only after approval of the prepared surface from the GE as well as to the Engineer-in-Charge through site order. | 52,000 | Sqm | - | - |
| 3 | Material and labour for applying one coat of acrylic water based exterior grade / interior grade primer @ 0.90 litre (undiluted) / 10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of minimum 1 litre per minute having a pressure of 3300 PSI on prepared ceiling or internal / external walls surfaces then allow 6 to 8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. | 52,000 | Sqm | - | - |
| 4 | Material and labour for applying two coats of anti fungal weather proof grade exterior acrylic emulsion paint of approved tint @1.80 lit / 10 sqm (undiluted) as per approved manufacturer's instruction over prepared and primed surface of external wall. Allow 6-8 hrs to dry the surface in subsequent coats of paint complete all as specified and directed. | 46,600 | Sqm | - | - |
| 5 | Material and labour for applying two coats of oil bound emulsion distemper on prepared & primed wall ( internal) and ceiling surfaces of approved tint complete all as specified & as directed. | 5,400 | Sqm | - | - |
| 6 | Material and labour for preparing old painted steel and iron surfaces of any description, not otherwise described over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engr-in-Charge. | 2,400 | Sqm | - | - |
| 7 | Material and labour for preparing old painted wood & wood based surfaces of any description, not otherwise described over 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engr-in-Charge. | 1,250 | Sqm | - | - |
| 8 | Material and labour for writing letters or figures (Block, Roman, Italic or Indian) on plastered surfaces with using black synthetic enamel paint on back ground and letter & numbers written with white synthetic enamel paint of 150mm hight etc complete all as specified and directed. | 14 | Per 10 Nos | - | - |
| 9 | Taking down cement mortar or lime plaster of any description from stone or brick wall or concrete surface etc including raking out joints, hacking for key scrubbing down with water and disposing off the rubbish materials out side MD and including necessary scaffoldings complete all as specified and directed. | 9,100 | Sqm | - | - |
| 10 | Material and labour for ready mix plaster of average thickness 15mm on brick work or concrete surfaces surfaces finished even and smooth including necessary scaffolding complete as per manufacture's in instruction and as directed.
Notes for BOQ Item Nos.01 to 08 : -
(a) All painting works shall be got executed through original material manufacturing company and their authorized applicators as approved by GE and contractor will submit MOU with manufacturing company and their authorized applicator alongwith performance gurantee. (b) Contractor shall submit gurantee from OEM of 04 Years for effectiveness of painting carried out by them from certified date of completion. (c) Contractor shall deposit entire quantity of material (proprietory materials) in sealed containers required for painting works covered in the work in custody of Engineer-in-Charge / rep of Engineer-in-Charge. (d) The material as required shall be issued to contractor by rep of Engineer-in-Charge on daily basis and empty containers / bags shall be deposited in the store of Engineer-in-Charge by Contractor for verification of consumption / coverage prescribed by manufacturer. (e) After completion of painting work contractor shall remove and clean all droplets / stain of paint left on the floor, glass & joinery. (f) The work shall be executed upto 12m height and cost of suitable scaffolding shall be deemed to be included in quoted rates. (g) Sample patch of 10 sqm be prepared considering all the items of periodical and shall be got approved from GE prior to carrying out further work. (h) Work for item Nos 1.00, 2.00, 3.00, 4.00 and 5.00 shall be carriedout by fully automatic machines. The rate is inclusive for the same. | 9,169 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_878070.xls
BOQ • 2.83 MB
Tender20T.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].